A 0.4 mm spread between mould cavities is a product tolerance, and no labeler removes a product tolerance. On a round bottle the spread becomes 1.26 mm of extra or missing wrap at the lap, where the label tail meets the label head. The label start is set by the trigger, not by the diameter, so the whole 1.26 mm lands at the tail. Three routes absorb the offset: re-mould the cavities, sort by cavity, or re-specify the diameter and the label length. Each route needs one piece of evidence before payment.
Where Does the 0.4 mm Show Up on a Round Bottle?
Circumference is π times diameter, so the wrap length follows the diameter.
What Does 0.4 mm of Diameter Become at the Lap?
A lap is the strip where the label tail lands over or beside the label head, and the lap carries every diameter error. The arithmetic is short: circumference is π times diameter, and π × 0.4 is 1.26, so a 0.4 mm spread becomes 1.26 mm of wrap difference. On a 60 mm bottle the spread is 0.7% of the diameter, and the wrap difference is 0.7% of the 188.5 mm circumference. The absolute figure matters more than the percentage, because a lap is an absolute feature. Take a fixed label length on a mean circumference of 188.5 mm. A 2.0 mm nominal gap runs at 1.37 mm on the smallest cavity and 2.63 mm on the largest. A 0.5 mm nominal gap puts the smallest cavity 0.13 mm into overlap. In practice a closed gap leaves no adjustment on the bottle labeling line. The wrap difference is 3.1 times the spread that caused it.
Where Does the Label Start Come From?
A label start is the point where the dispense trigger fires and the leading edge leaves the peel plate. A wrap-around machine uses a product sensor to see the bottle, and the controller releases one label. Leading edge position depends on sensor timing, conveyor speed and dispense delay. Diameter does not enter the trigger. The rating a builder quotes, ±0.5 mm on a semi-automatic machine, up to ±0.2 mm on the MT-807 and ±1 mm on an automatic machine, describes the scatter of the leading edge against a datum. The lap sits one label length downstream, where no trigger reaches. On a station that turns the bottle at fixed angular speed instead of matched surface speed, part of the spread does move to the leading edge. First, check which drive the wrap station uses. Second, measure the leading edge on two cavities at production speed. Third, compare the two readings with the quoted rating. In practice the split is visible on the machine, not in the quotation.
Which of the Three Routes Should You Pay For?
Three routes exist, and each one buys a different part of the problem.
How Do the Three Routes Compare?
A route is a purchase of one variable: the mould, the handling rule, or the written tolerance. First, the mould route removes the cause. Second, the sort route moves the cost. Third, the re-spec route writes the band down. The table names the evidence that has to exist before money moves.
| Route | What the route changes | What stays in place | Evidence before payment |
|---|---|---|---|
| Re-mould or a new cavity set | The diameter spread at source, for every future lot | Label length, pallet stock in the warehouse, line speed | Cavity to cavity capability record, plus a first-shot sample from every cavity |
| Sort by cavity | Which bottles run together, plus one recipe offset per group | The spread itself, and the handling cost at pallet level | A cavity mark that survives the moulding cell, plus gauge repeatability |
| Re-specify diameter and label length | The band the plant accepts, and the length the label runs | The spread the mould actually produces | A signed incoming clause naming the sampling plan and the measurement height |

What Does Each Route Leave Unfixed?
A re-mould is a tooling purchase, and the purchase removes the spread at source. Label length still has to cover the largest circumference in the band, and pallets already in the warehouse keep the old spread. Sorting leaves the spread in the product and moves the cost into handling, because every cavity group needs a pallet, a recipe and a changeover. Re-specifying leaves the mould untouched and moves the risk into inspection, because a wider band that is not measured at the label zone is the same as no band. For example, a plant that widens the diameter tolerance without naming the measurement height still rejects good bottles at the capper and passes bad ones at the labeler. First, each route fixes one variable. Second, the other two stay put. Third, label length decides the lap.
When Is Sorting by Cavity the Cheapest Route?
A sort is the cheapest route when the spread is fixed, repeatable and already known, because a fixed offset needs an offset rather than a new tool. The test is repeatability. If cavity 3 runs 0.4 mm large on every shot, one recipe offset removes the lap error without touching the mould or the drawing. Sorting fails on two conditions. First, the cavity mark must be readable at the gate, and a moulded cavity number is not readable at 40 to 300 pcs/min without a vision station, so the gate sits at pallet or lot level. Second, the offset has to be locked, because an operator who edits a recipe by feel turns a fixed bias into a moving one. In practice pallet gating costs warehouse space. Step 1 is the mark, step 2 the locked recipe, step 3 the pallet rule.
Does a Tighter Placement Rating Buy Anything?
All three accuracy classes describe the leading edge, not the lap.
What Do the Three Accuracy Classes Measure?
An accuracy class is a scatter figure measured at the leading edge. A semi-automatic machine is quoted at ±0.5 mm, the MT-807 at up to ±0.2 mm, and an automatic machine at ±1 mm excluding product and label variation. The exclusion is the part buyers miss. The ±1 mm figure never claimed to cover a 1.26 mm product swing, so placing ±1 mm beside 1.26 mm compares a machine scatter with a product bias. The ±0.2 mm class is 20% of the ±1 mm figure on paper, and both numbers stay silent about the lap. According to HiPaks, the MT-807 accuracy figure is an up to figure taken on a stable bottle, so product and label variation sit outside the number. None of the three numbers is quoted at the lap, because the lap is a product outcome rather than a machine axis. In practice a buyer who compares classes chooses a scatter, not a lap.
Why Does a Tighter Rating Not Remove the Lap Offset?
A tighter rating reduces scatter and leaves bias untouched. The cavity offset is bias: the same cavity produces the same 1.26 mm lap error on every bottle, shift after shift. Scatter is random and averages out over a run. Bias does not average out, and a ±0.2 mm machine reproduces 1.26 mm as faithfully as a ±1 mm machine. The 1.26 mm is 3.1 times the 0.4 mm band that a ±0.2 mm rating allows, so the product term dominates the budget before the machine term is counted. In practice a tighter machine earns the price at the leading edge, where print registration, an orientation feature or a vision check needs the scatter gone. On a round bottle with a plain label, that purchase returns nothing. Compare the three classes in Find Your Machine in 3 Steps.
How Do You Prove the Route and Close It in the PO?
The route is only as good as the measurement that justifies it.
Can the Gauge See 0.4 mm at All?
A gauge is capable when the instrument can resolve the band it has to police, and resolution alone is not capability. A caliper with 0.01 mm resolution is not yet a capable gauge. According to the NIST/SEMATECH e-Handbook of Statistical Methods, measurement process characterization separates the gauge from the operator and the setup, and a gauge study is the record that proves the separation. The working rule is a resolution of 10% of the tolerance and a repeatability well inside the band, so a 0.4 mm band needs a gauge that repeats to about 0.04 mm. For example, a tape around the bottle reads to 1 mm, which is 250% of the band, and cannot see the spread at all. In our test room the buyer’s bottles run before the crate closes, and the video comes back.
What Evidence Does Each Route Need Before Payment?
A capability record is the document that decides a re-mould, and a sampling clause decides a re-spec, so the evidence comes before the order. First, re-moulding needs a cavity to cavity capability record on the diameter at the label zone, plus a first-shot sample from every cavity measured on the same gauge. Second, sorting needs a cavity mark that survives the moulding cell and the wash, plus a repeatability figure for the gauge at the gate. Third, re-specifying needs a signed incoming clause that names the measurement height, the band and the sampling plan. For example, a mould maker who quotes a cavity tolerance without a capability record is quoting a drawing rather than a process, and a drawing cannot be inspected at the line. Three people read the three documents: tooling, production, purchasing.
Which Clause Lines Close a Sort or Re-Spec Decision?
Three clause lines carry the decision into the purchase order. First, the diameter is measured at the label zone height rather than at the widest point, because a bottle can sit inside the band at the body and outside the band where the label runs. Second, the band is inspected lot by lot against a written sampling plan. ISO 2859-1:2026 indexes sampling schemes by acceptance quality limit for lot-by-lot inspection, and the plan has to name the lot size and the accept number. Third, label length is fixed against the largest effective circumference in the band, so the lap stays positive on the small cavity. In practice the machine clause and the bottle clause are read together, because both exclude product variation. Send the band with the bottle drawing and Get a Factory Quote prices the same clause, with 30% TT deposit and 70% before shipment.
What Buyers Ask About Cavity Spread
Four questions cover the decision.
Does a 0.4 mm Cavity Spread Break Wrap-Around Labeling?
A 0.4 mm cavity spread breaks wrap-around labeling only when the lap has no margin. The spread becomes 1.26 mm of lap movement, and a 2.0 mm nominal gap absorbs that movement on both sides of the mean. A 0.5 mm nominal gap does not absorb the movement, because the smallest cavity runs 0.13 mm into overlap. The check is the gap budget, not the diameter alone.
Can a Tighter Machine Rating Compensate for Cavity Spread?
A tighter machine rating cannot compensate for cavity spread, because the rating describes scatter at the leading edge and the spread is a bias at the lap. A ±0.2 mm machine reproduces a 1.26 mm lap offset as faithfully as a ±1 mm machine. The offset is answered by a per-cavity recipe, a tighter bottle or a label length inside the band.
How Do You Know the Spread Is Fixed Rather Than Drifting?
A fixed spread repeats cavity by cavity on every shot, while a drift moves over a shift. Run the same cavity twice, hours apart, and compare the diameter at the label zone. A figure that repeats is a cavity offset and belongs in this article. A figure that walks is drift, and the attribution method sits in the label drift guide.
What Should the Purchase Order Say If You Choose Sorting?
A sorting purchase order names three things: the cavity mark and where the gate reads the mark, one locked recipe offset per cavity group, and the pallet rule that keeps groups apart. The order also names the gauge and the measurement height. Without the three lines, a sort is a habit rather than a control.