China labeling machine manufacturer, OEM/ODM, semi-automatic to high-speed rotary systems.

Support and Spare Parts

A video of the fault beats a ticket form. Engineers diagnose within 12 hours, and every machine carries a one-year warranty plus lifetime support.

12h
Engineer diagnosis target
1yr
Whole-machine warranty
Lifetime
Engineering support
Factory
Spare parts source

Find the Right Resource

Three direct routes, no ticket queue.

Manuals and operating documents

Operating manual, wiring diagram and maintenance schedule for your exact model.

Request documentation by serial

Video guides and tutorials

Real machines being set up, adjusted and run on our test floor, in the same footage style as your commissioning video.

Watch the video library

Talk to an engineer

WhatsApp with a 30-second clip of the fault is the fastest channel we have: +86 186 1602 0558.

Contact the team

Spare parts

Sensors, belts, rollers and heater cartridges sourced from the factory, matched to the parts diagram for your model.

Open the parts diagram

Most Issues Are Solved Remotely

Labeling problems are almost always visible problems: a video tells an engineer more than a form ever will.

  1. Send a short video of the issueWhatsApp or email: show the label behaviour, the container and the HMI screen. Thirty seconds is usually enough.
  2. Engineer diagnosis within 12 hoursYour case goes to an engineer with field experience on your machine family, not a script reader.
  3. Fix steps, a video guide or a live callYou receive step-by-step adjustment instructions matched to your machine and your product.
  4. Parts shipped when hardware is the causeIf a sensor or belt failed, the part is dispatched from the factory with the fitting instructions.

Watch Real Machines Run and Adjust

Unedited footage from the test floor, the same standard as your pre-shipment video.

MT-805 wrap: setup and labelingSemi-automatic rangeSETUP
T921 automatic round bottleAutomatic rangeRUN
Hot melt rotary: line operationRotary platformLINE

One-Year Warranty, Lifetime Engineering Support

No fine print, no outsourced service desk.

Warranty coverage

  • One-year whole-machine warranty from delivery
  • Lifetime engineering support, remote, direct with our engineers
  • Commissioning video approved by you before shipment
  • Remote support via WhatsApp on every machine we ship

Spare parts and consumables

  • Parts sourced from the factory, not a local guess
  • Parts diagram with model codes for exact matching
  • Wear items (belts, rollers, sensors) listed per platform
  • Recommended spares kit available with the machine

Professional Services

Beyond equipment: installation, optimisation and training.

Installation and commissioning

On-site installation for line-integration projects, system calibration, operator training and performance validation.

Process optimisation

Workflow analysis, efficiency improvements, quality gains and cost reduction on an existing labeling operation.

Training and certification

Operator and maintenance training on your own machine, with the routine settings documented for your team.

Where to start

Send a video of the current line and the target rate; the recommendation comes back as scope, price and lead time in one package.

Support Questions

What warranty do HiPaks machines carry?

A one-year whole-machine warranty from delivery, followed by lifetime engineering support for as long as you run the equipment.

How do I get technical support when something goes wrong?

Send a short video on WhatsApp or email. An engineer with field experience on your machine family diagnoses within 12 hours and replies with step-by-step adjustments, a video guide or a live call.

Are spare parts available for older machines?

Parts are sourced from the factory against your model’s parts diagram. Wear items such as belts, rollers and sensors are listed per platform, and a recommended spares kit can ship with the machine.

Do you help with installation and commissioning?

Yes: on-site installation for line-integration projects, calibration, operator training and performance validation.

Do you provide operator training?

Training is part of commissioning and is available as a separate service for new operators: routine settings, changeover and first-line maintenance, documented for your team.

How fast do you respond to support requests?

Twelve hours for an engineer diagnosis; urgent line-down cases start with a WhatsApp call so the engineer sees the fault live.

Back to top