
Automatic Inline
Wrap-around, top and flat, corner seal in one T9 family, up to 300 pcs/min.
36 models organized by where the label goes: wrap-around, front and back, top and flat, side, corner seal, print and apply, applicator heads and hot melt rotary.
Every family runs the same test-first process: your container on the machine before you buy.

Wrap-around, top and flat, corner seal in one T9 family, up to 300 pcs/min.

Two labels in one pass for flat, square and oval bottles, 60–120 pcs/min.

One operator, 15–30 pcs/min: the low-risk first machine.

Drop-in T951 and T953 heads for integrators and OEM machine builders.

Barcodes and variable data printed and applied in one station.

12 and 16-station lines at 10,000–15,000 BPH for water and beverage plants.
One clip from each corner of the range: inline wrap, semi-automatic desktop, an OEM applicator head, and a hot melt rotary.
No more 200 MB PDF files: the catalog carries photos, specs, former model codes and a filter by container family.
The catalog lists all 36 models with speed, accuracy, container range, footprint and factory-direct bands, plus a jump from each model to its product page.
If you would rather start from your container than a model number, the selection tools work the other way: container shape first, then the platform and the automation level.
36 machine models organized by labeling way: wrap-around, front and back, top and flat surface, side and double-side, corner and seal, print & apply, applicator heads and hot melt rotary. Each way is available in semi-automatic and automatic configurations.
Start from where the label goes: wrap-around for round bottles, front and back for flat bottles, top and flat for boxes and bags, side for one or two faces, corner for tamper-evident carton seals. Then pick the automation level: a desktop MT ships in 7–10 days, automatic builds in 7–25.
Yes. Automatic models and applicator heads (T95x) are built for line integration, with conveyor adapters, PLC signal wiring and commissioning support. The retrofit guide lists the five inputs we need.
Every machine is tested on your exact container shape, label size and target speed before shipment. You receive the full test video and a sample for approval.
No MOQ on standard models: one unit ships. Custom configurations and OEM/ODM projects are quoted case by case.