China labeling machine manufacturer, OEM/ODM, semi-automatic to high-speed rotary systems.

Home · Products · Product Catalog

All 36 Models. One Online Catalog.

This online catalog replaces the PDF brochure: every labeling machine HiPaks builds, with photos and one-line positioning: no download, no waiting. Browse the five categories, pick your model and request a quote directly with the model number.

HiPaks labeling machine showroom and factory
Models36 machine models
Top PrecisionUp to ±0.2mm on high-end configs
Fastest Delivery7–10 days, semi-automatic
Quote Turnaround12 hours, model-number reply
Labeling Way
Automation
Container
Speed
36 of 36 models

Every model below is built in our own factory with SICK photoelectric sensors and Panasonic servo drives, and tested on the customer’s own containers before shipping. HiPaks machines are at work in 50+ countries: 500+ factories served. Found a model? Quote it with the model number and we reply within 12 hours.

MT Series · 16 Models

Semi-Automatic & Desktop Labeling Machines

Category page →
Desktop round bottle labeler in the HiPaks showroom

MT-50 Round Bottle Labeler

Semi-Auto · ±0.5mm · 7–10 days

Desktop semi-automatic round bottle labeler.

Formerly LT-50

Request a Quote
HiPaks showroom with desktop flat surface labeling machines

MT-60 Flat Surface Labeler

Semi-Auto · ±0.5mm · 7–10 days

Desktop flat surface labeler for boxes, bags and panels.

Formerly LT-60

Request a Quote
HiPaks showroom with compact desktop round bottle labelers

MT-130 Compact Round Bottle Labeler

Semi-Auto · ±0.5mm · 7–10 days

Compact desktop round bottle labeler.

Formerly LT-130

Request a Quote
HiPaks showroom with pneumatic round bottle labeling machines

MT-190 Front & Back Round Bottle Labeler

Semi-Auto · ±0.5mm · 7–10 days

Pneumatic round bottle labeler with front-and-back labeling.

Formerly LT-190

Request a Quote
HiPaks showroom with electric round bottle labeling machines

MT-190e Electric Round Bottle Labeler

Semi-Auto · ±0.5mm · 7–10 days

Electric round bottle labeler: runs without compressed air.

Formerly LT-190

Request a Quote
MT-801L floor-standing semi-automatic round bottle labeler

MT-801L High-Precision Round Bottle Labeler

Semi-Auto · ±0.5mm · 7–10 days

Floor-standing semi-automatic round bottle labeler, high precision.

Formerly 801L

Request a Quote
MT-803 semi-automatic front and back flat labeling machine

MT-803 Front & Back Flat Labeler

Semi-Auto · ±0.5mm · 7–10 days

Semi-automatic front-and-back flat labeler for flat bottles and curved surfaces.

Formerly 803

Request a Quote
MT-805 semi-automatic wrap-around labeling machine

MT-805 Wrap-Around Labeler

Semi-Auto · ±0.5mm · 7–10 days

Semi-automatic wrap-around labeler for flat, square and irregular containers.

Formerly 805

Request a Quote
HiPaks showroom with fold-over labeling machines

MT-808 Fold-Over Labeler

Semi-Auto · ±0.5mm · 7–10 days

Semi-automatic fold-over labeler for tubes, wires and pens.

Formerly 808

Request a Quote
MT-860 semi-automatic double side labeling machine

MT-860 Double Side Labeler

Semi-Auto · ±1mm · 7–10 days

Semi-automatic double side labeler for flat and square bottles.

Formerly 860

Request a Quote
Desktop labeling machines in the HiPaks showroom

MT-210 Desktop Flat Surface Labeler

Auto · Desktop · ±0.5mm · 7–10 days

Desktop automatic flat surface labeler.

Formerly LT-160 / ALB-210

Request a Quote
HiPaks showroom with desktop paginating labeling machines

MT-211 Paging Flat Labeler

Auto · Desktop · ±0.5mm · 7–10 days

Desktop paginating flat labeler for bags and pouches.

Formerly ALB-210

Request a Quote
HiPaks showroom with desktop double side labeling machines

MT-301 Desktop Double Side Labeler

Auto · Desktop · ±0.5mm · 7–10 days

Desktop double side labeler.

Formerly LT-301

Request a Quote
Desktop automatic positioning round bottle labeler in the showroom

MT-320 Desktop Round Bottle Labeler

Auto · Desktop · ±0.5mm · 7–10 days

Desktop automatic round bottle labeler, roller-driven.

Formerly LT-150 / ALB-320

Request a Quote
HiPaks showroom with desktop automatic oriented round bottle labelers

MT-330 Oriented Round Bottle Labeler

Auto · Desktop · ±0.5mm · 7–10 days

Desktop automatic oriented round bottle labeler.

Formerly ALB-420

Request a Quote
T9 Series · 15 Models

Automatic Inline Labeling Machines

Category page →
HiPaks showroom with automatic oriented round bottle labeling machines

T922 Oriented Round Bottle Labeler

Auto · ±1mm · Lead 7–25 days

Fully automatic oriented round bottle labeler.

Formerly T822

Request a Quote
HiPaks showroom with star-wheel oriented round bottle labeling machines

T922R Star-Wheel Oriented Labeler

Auto · ±1mm · Lead 7–25 days

Oriented round bottle labeler with star-wheel positioning.

Oriented variant of the T922 platform

Request a Quote
T923 automatic horizontal round bottle labeling machine

T923 Horizontal Round Bottle Labeler

Auto · ±1mm · Lead 15 days

Fully automatic horizontal round bottle labeler.

Formerly T823

Request a Quote
T931 automatic flat and top surface labeling machine

T931 Flat & Top Surface Labeler

Auto · ±1mm · Lead 7 working days

Fully automatic flat / top surface labeler.

Formerly T831

Request a Quote
T932 automatic paging labeling machine with feeder

T932 Paging Labeler for Bags & Cards

Auto · ±1mm · Lead 15 days

Fully automatic paging labeling machine for bags and cards.

Formerly T832

Request a Quote
HiPaks showroom with dual-head corner and seal labeling machines

T933 Corner & Seal Labeler

Auto · ±1mm · Lead 7–25 days

Dual-head corner and seal labeling machine.

Formerly T833

Request a Quote
HiPaks showroom with automatic bottom labeling machines

T935 Bottom Labeler

Auto · ±1mm · Lead 7–25 days

Fully automatic bottom labeling machine.

Formerly T835

Request a Quote
HiPaks showroom with automatic top and bottom flat labeling machines

T936 Top & Bottom Flat Labeler

Auto · ±1mm · Lead 20 days

Fully automatic top-and-bottom flat labeler.

Formerly T836

Request a Quote
T961 automatic single side labeling machine connected to a conveyor line

T961 Single Side Labeler

Auto · ±1mm · Lead 25 days (customized)

Fully automatic single side labeling machine.

Model number unchanged

Request a Quote
T962 automatic double side labeling machine

T962 Double Side Labeler

Auto · ±1mm · Lead 25 days (customized)

Fully automatic double side labeling machine.

Model number unchanged

Request a Quote
T963 automatic flat and round bottle combination labeling machine

T963 Flat & Round Combination Labeler

Auto · ±1mm · Lead 25 days (customized)

Fully automatic flat & round bottle combination machine with oriented labeling.

Model number unchanged

Request a Quote
T95x Series · 2 Models · OEM Modules

Label Applicator Heads & Modules

Category page →
T951 inline flat labeling applicator head as OEM module

T951 Flat Labeling Head

Line · OEM · ±1mm · Lead 10 days

Inline flat labeling applicator head: drop-in OEM module with standard mounting interfaces and I/O documentation.

Formerly T851

Request a Quote
HiPaks showroom with gantry labeling applicator equipment

T953 Gantry Labeling Head

Line · OEM · ±1mm · Lead 7–25 days

Gantry labeling applicator head: drop-in OEM module for overhead labeling above customer conveyors.

Formerly T853

Request a Quote
Rotary · 2 Models · 10,000–15,000 BPH

Hot Melt Glue Rotary Labeling Machines

Category page →
12-station hot melt glue rotary labeling machine

Hot Melt Rotary Labeler, 12 Stations

Line · Rotary · ±1mm · Lead quoted per project

Hot melt glue rotary labeling machine with 12 stations for BOPP/OPP roll-fed labels on beer, water and beverage lines.

12-station configuration

Request a Quote
16-station hot melt glue rotary labeling machine

Hot Melt Rotary Labeler, 16 Stations

Line · Rotary · ±1mm · Lead quoted per project

Hot melt glue rotary labeling machine with 16 stations for oval bottles at 10,000–12,000 bph.

16-station configuration

Request a Quote

Model Numbering: New vs. Former Codes

HiPaks renumbered its range into the MT (semi-automatic and desktop), T9 (automatic inline) and FT (print & apply) families. Older catalog codes (LT-, T8-, numeric and ALB- series) still appear in quotations and manuals, so here is the correspondence. The 36-model total includes both the current range and these legacy-numbered machines.

Series Current codes Former codes
Semi-automatic MT MT-50, MT-60, MT-130, MT-190, MT-190e, MT-801L, MT-803, MT-805, MT-807, MT-808, MT-860 LT-50, LT-60, LT-130, LT-190, 801L, 803, 805, 807, 808, 860
Desktop automatic MT MT-210, MT-211, MT-301, MT-320, MT-330 LT-160 / ALB-210, ALB-210, LT-301, LT-150 / ALB-320, ALB-420
Automatic inline T9 T921–T923, T922R, T931–T936, T951–T953, T961–T963 T821–T823, T831–T836, T851–T853 (T961–T963 unchanged)
Print & apply FT-600 ALB-6000

Labeling Machine Price: How HiPaks Quotes

How do I get pricing for a labeling machine?
Send us the model number from this catalog, your container shape and your target output. Our team replies with a quotation within 12 hours.
Do you publish a labeling machine price list?
Custom configurations vary too much for a fixed price list: label size, container format, speed and integration options all change the price, so we quote per requirement. Indicative bands by machine class are on the price guide, and the exact figure is confirmed in your quotation.
What are your payment terms and delivery time?
Payment terms are 30% deposit and 70% balance before shipment, FOB Shenzhen. Standard semi-automatic models ship in 7–10 days; automatic systems and rotaries are quoted with a delivery schedule per configuration.
Do you test the machine on my containers before shipping?
Every machine is tested on your exact container shape, label size and target speed before shipment. You receive the full test video and a sample for approval.
Back to top