One-off engineered builds around your container: the shapes that defeat catalog machines, solved with a fixture and proven on video before shipping.
Six geometries that break a standard platform, and the mechanical answer for each.
Circumference changes along the label path, so a wrap climbs and wrinkles.
Fix: label confined to the straight zone, or a jig presenting the bottle at a controlled angle.
The face rolls away from a straight application.
Fix: roller platforms with shaped pressure surfaces, or double-side heads with matched faces.
Corner radius traps air and drives the diagonal wrinkle.
Fix: fixture centering plus belt press order plus artwork inside the straight zone.
The face you need is facing down.
Fix: the dedicated T935 bottom-labeling platform, proven on a real order.
The label must cross an edge without bridging or lifting.
Fix: corner-wrap fixtures that pre-form the path on the way to the seal point.
Multiple faces and changing curvature on one container.
Fix: multi-head or indexed-fixture configurations, sometimes a head plus jig.
Custom tooling usually dies in a warehouse corner the week after delivery, which is why every reorder starts with “can you even still build this?” Our rule is different: jig drawings, fixture settings and your sample parameters are archived permanently once the design freezes.
A reorder then skips the tooling fee entirely: replace a fixture, duplicate a line or add a second shift without paying engineering twice. The same archive is what makes a fast repeat test possible at all, because repeat testing starts from knowledge rather than a fresh sample round.
Need an NDA before samples ship? Say so in the first message; your geometry and label spec then live only in your project archive.
Distributors and brands running an ongoing program get the same engineering, documented for your controls team and badged for your market. Sizing, spares and documentation scope are agreed per program.
T935 bottoms: batch panels on the underside of containers no catalog machine addressed.
Paste labeling line: paper labels and wet glue for a canning operation, in production at a customer plant.
Woozy jig: tapered bottles that defeated a standard roller setup, archived for the reorder that followed.
Five clips from engineered builds.
Custom machines carry no list price, and that is deliberate rather than evasive. Two builds for “the same bottle” can differ by a factor of two in fixture complexity, so the only honest quote is one written against your sample.
The sequence is fixed: free evaluation, then approach plus lead time plus price returned as one package, then a proof video before the balance. Tooling appears once as its own line, and never again on a reorder.
Jig on a standard platform: rides the standard automatic lead time, up to about 25 days for customized configurations.
Purpose-built machine: project schedule set at the evaluation, with milestones agreed in writing.
Yes, it is one of our signature problems. The label either stays inside the bottle’s straight-wall zone, or the bottle is presented at a controlled angle in an engineered jig; which one depends on your label height and the taper.
Quoted per project: no list prices, because fixture complexity can vary hugely between “similar” bottles. The quote follows the free engineering evaluation and states tooling as its own line.
Jig-on-platform builds ride the standard automatic lead time, topping out around 25 days for customized configurations. Purpose-built machines get a project schedule at the evaluation.
Yes: jig drawings and your sample parameters are archived permanently once the design freezes. Reorders skip the tooling fee entirely, whether you replace a fixture, duplicate a line or add a shift.
Yes. Say so in your first message and the NDA is arranged before your samples ship; your geometry, jig settings and label spec then live only in your project archive.
Usually a standard platform with shaped pressure surfaces: the T803 roller at benchtop scale, or the T963 where round bottles share the line. Arc faces that still defeat those go to an indexed fixture.