China labeling machine manufacturer, OEM/ODM, semi-automatic to high-speed rotary systems.

Pick your bottle. We have the machine.

Sixteen container types, matched to the HiPaks machines that label them every day.

16
Container types covered
36
Machine models matched
250
Test-run clips in our library
48 hours
Free test video turnaround
Container × Machine

Choose your container type

Click a bottle to see the machines that label it.

Round bottle

Wrap-around labeling on bottles Ø25–100 mm, the most common container we run.

T921: automatic

Inline wrap-around for production lines, conveyor in and out.

±1 mm accuracy · 40–120 pcs/min · Ø25–100 mm

From $6,000

MT-801: semi-automatic

Foot-pedal desktop unit, one operator.

±0.5 mm accuracy · 20–30 pcs/min · Ø10–150 mm

From $600

T922R: star-wheel positioning

For labels that must sit exactly at one spot on the circumference.

±1 mm · positioning wrap · Ø25–100 mm

Price on request

Vial & tube

Ø10–30 mm small bottles, tubes and ampoules, labeled horizontally at high speed.

T923: horizontal

Horizontal roll-through for vials, test tubes and small ampoules.

±1 mm accuracy · 100–300 pcs/min · Ø10–30 mm

Price on request

+ vibratory feeder

Bottle sorting and feeding upstream: full line for pharma labs.

Vibratory feeder · coding · collection

Quoted per project

Wine bottle

Front and back labels on glass: semi-automatic for craft volumes, automatic for lines.

MT-190 / MT-190e

Front & back in one hand-placement (pneumatic or electric).

Front & back · glass and PET · craft volumes

From $600

T962: automatic double-side

Inline both faces at line speed.

±1 mm · 60–120 pcs/min

From $9,000

Flat bottle, front & back

Shampoo, lotion and square-shoulder bottles: both faces in one pass.

T962: automatic

Two heads, synchronized belts, one pass.

±1 mm · 60–120 pcs/min · L20–300 mm

From $9,000

MT-803: semi-automatic

Front-back rolling head for hand-loaded bottles.

±0.5 mm · 20–30 pcs/min

From $600

Square bottle

One frame that runs square bottles today and round bottles tomorrow.

T963: dual + round in one frame

Double-sided heads plus positioning round-bottle mode.

±1 mm · 60–120 pcs/min · L20–250 mm

Price on request

MT-805: 360° full wrap

Full-wrap square faces by hand placement.

±0.5 mm · 15–30 pcs/min

From $600

Tapered bottle

Woozy bottles and cones: the label climbs unless the fixture matches the taper.

MT-805 + engineered jig

Custom-machined taper fixture, archived for repeat orders.

±0.5 mm · jig machined in-house

From $600 + jig

Tapered labeling guide

Why labels climb, and the fixture geometry that stops it.

Guide · 6 min read

Free

Oval bottle

Curved faces need wrap pressure, not a flat slap. Both machines below hold the curve.

T962: automatic

Belt-held oval bodies, front and back at speed.

±1 mm · 60–120 pcs/min

From $9,000

MT-805: full wrap

Wrap-station pressure for bubble-free oval faces.

±0.5 mm · 15–30 pcs/min

From $600

Jug / jerrycan

Large flat panels: motor oil, chemicals, detergent jugs.

T962: automatic double-side

Large-format panels up to L300 mm, both faces.

±1 mm · labels to 175 mm wide

From $9,000

Chemical industry setups

Drum, pail and jerrycan references and GHS notes.

Industry page

Reference

Spray bottle

Trigger bottles: front & back around the trigger neck, no twist.

T962: automatic double-side

Belts square the bottle; heads place both labels.

±1 mm · 60–120 pcs/min

From $9,000

MT-806: semi double-side

Hand-placed double-sided entry machine.

±0.5 mm · 15–30 pcs/min

From $600

Jar

Honey jars, candles, cosmetics: side wrap or top labeling.

MT-805: side wrap

Full wrap on glass and candle jars, big and small.

±0.5 mm · tested on Ø60–160 mm jars

From $600

T931: top labeling

Lid-top labels inline.

±1 mm · top face

From $6,000

Box & carton

Top labels on folding cartons, corner seals on shipping boxes.

T931 / T951: top labeling

Flat top-face labels inline or as a head on your conveyor.

±1 mm · top / top-and-bottom (T936)

From $6,000

T888: carton corner & seal

Double-head corner labels + date coding on shipping cartons.

Corner wrap · up to 3 heads

Price on request

Pouch & bag

Stand-up pouches and poly bags: singled, then labeled flat.

T932: paging + flat labeling

Friction feeder singles each pouch, applies flat, stacks out.

±1 mm · 40–120 bags/min

From $6,000

MT-211: desktop paging

Bench-top version for small batches.

Desktop · cards & bags

From $600

Can & tin

Tin cans and round tins: glue labeling for wet environments, PSA wrap as the alternative.

Paste (wet-glue) labeler

Low cost per label on tin cans, proven in a Russian cannery.

Wet glue · round tins

Price on request

MT-805: PSA full wrap

Self-adhesive wrap alternative, no glue system.

±0.5 mm · 15–30 pcs/min

From $600

Wire & cable

Fold-over flags on wire, cable and even cutlery bags.

MT-808: fold-over

Labels fold around the product in one stroke.

Fold-over flags · wire/cable/utensils

From $600

Bottle bottom

Bottom-face labels for cosmetics and food, a custom-fixture specialty.

T935 / custom bottom

Flip-and-apply bottom stations engineered to your bottle.

±1 mm · custom fixture

Quoted per project

Full line · 15,000 BPH

High-speed beverage lines: OPP roll-fed hot melt cuts label cost per bottle.

Hot melt rotary: 12/16 station

OPP roll-fed rotary for mineral water and CSD lines.

12,000–15,000 BPH · ±1 mm · servo feed

From $25,000

Hot melt vs PSA cost guide

Where the cost-per-bottle crossover sits for your volume.

Guide · calculator inside

Free

Three steps from bottle to machine

1. Match the container. The grid above covers every container family we build for: round, flat, square, tapered, jars, pouches, cans, wire, bottoms and full high-speed lines.

2. Confirm it on your bottle. Send samples; we run them on the exact machine class and send the test video back within 48 hours.

3. Get the factory quote. 30/70 T/T, Trade Assurance accepted, 7–10 day dispatch on semi-automatic models.

MT-805 semi-automatic wrap-around machine confirming the container-to-machine match on a real bottle before you buy

Not sure which container family fits?

Bottles that mix features (a square shoulder with a tapered base, or a jar with a bottom label) are our daily work. The custom engineering page shows the jigs we have already machined, and the full selection guide walks the whole decision: container, label, speed, budget.

Container Selection: Frequently Asked Questions

How do I use this selector?

Click your container type and the panel below the grid shows the machines that run it, with accuracy, speed range and an indicative factory-direct price for each. Pick the closest match, then confirm it on your real bottle before you commit to anything.

Can I confirm the match on my actual bottles first?

Yes, and you should. Ship your bottles and labels; we run them on the machine class in your panel and send back a test video with an accuracy readout within 48 hours of arrival. The quote is finalized only on the configuration already proven on your product (send samples).

My bottle mixes features. Which panel do I pick?

Pick the panel named for the face you label: square shoulders with a tapered base start at the square or tapered panel, and jars that also need a bottom label start at the jar panel. Mixed containers are our daily work; the custom engineering page shows fixtures we have already built for them.

How fast can the matched machine ship?

Semi-automatic machines dispatch 7 to 10 days after payment confirmation; fully automatic machines ship in 7 to 25 days depending on configuration and tooling. Standard payment is 30/70 T/T with Trade Assurance accepted, and the FAT test video comes before the balance payment.

Back to top