China labeling machine manufacturer, OEM/ODM, semi-automatic to high-speed rotary systems.

Label Applicator Machines & Heads

Apply pressure-sensitive labels onto products already moving on a conveyor: a bolt-on head, or a complete standalone applicator.

From $3,000
T95x head reference price
40–120
T951 rated pcs/min
±1mm
Placement accuracy
5
Application methods

Pick the Hardware, Then the Method

Two decisions, both driven by what happens after the label leaves the roll.

What the words mean

HardwareChoose when
Labeling head
Peel edge, sensor and drive
Products already travel on your conveyor
Applicator machine
Head plus frame, belt and controls
No conveyor, or you want one unit to feed and apply
Label dispenser
Presents one label at a time
Operators apply by hand but want the peeling done

Application methods

MethodBest for
Wipe-onSteady conveyor flows: bottles, cartons, flat faces
TampDiscrete cycles: boxes, pouches, flat items
Tamp-blowDelicate or slightly irregular surfaces
Air-blowFragile, recessed or uneven targets
Corner-wrapTamper-evident box seals and edge panels

Send a photo of the target surface and your conveyor height; we pre-select the head and method before quoting.

Three Head Platforms

Same drive and sensor package, different mounting geometry.

T951 flat-surface inline labeling head applying labels on a conveyor

T951 · Flat-Surface Head

Top or side faces on a moving line. Products 10–150mm, labels from 6mm long.

40–120 pcs/min · ≈76kg · From $3,000

T952 side labeling head mounted on an existing conveyor line

T952 · Side Head

Side panels on cartons and rectangular containers, height and angle adjustable.

40–150 stepper / 50–200 servo pcs/min · ≈70kg · From $3,000

T953 gantry labeling head spanning a conveyor without touching the frame

T953 · Gantry Head

Spans the line when the conveyor frame must stay untouched. Top planes and arc surfaces.

40–150 stepper / 50–200 servo pcs/min · ≈66kg · From $3,000

Five Inputs, Then It Ships

Retrofitting a head is a five-input conversation, not a construction project:

  1. Conveyor surface height from floor to belt top.
  2. Direction of travel, which sets the head orientation.
  3. Product spacing and whether a gap sensor or pitch timing triggers.
  4. Sensor position relative to the peel edge.
  5. Electrical integration: 220V supply and any PLC handshake.

Heads adjust for height and angle at install, so small deviations are absorbed. Standard heads ship in 7–25 days.

Labeling head retrofitted onto a customer's existing conveyor line
A T951 head mounted on a line that was never designed for labeling.

What’s Inside, and What It Can Label

Components your electrician can source

  • SICK / Datasensor label sensors, including clear-label versions
  • Hypsen product sensors
  • Panasonic PLC
  • Mingwei / Mean Well power supplies
  • LeadShine stepper drives

Part numbers are documented in the parts diagram, so a failed sensor is a local purchase, not an ocean shipment.

Surfaces this hardware labels

OEM & Private Label for Distributors

Heads and applicators built under your brand, with spec sheets, demo footage and spare-part packages sized to your installed base. Integrators get documented I/O, so controls teams integrate without reverse engineering.

Applicator machines prepared for OEM and distributor orders in the HiPaks showroom
Heads staged for distributor orders, with marketing material and spare-part kits.

Heads Running on Real Products

Four clips from customer lines and factory tests.

T951 inline, customer lineFlat labels · inline installON-SITE
T951 inline, second installCustomer production lineON-SITE
T951 on small tile-grout labelsSmall-label run · factory testTEST RUN
Head operation walkthroughSetup and operationFACTORY

Heads from $3,000 (typical $3,000–10,000). Semi-automatic applicators from $600. Print & apply from $6,000. Full price list.

Applicator Buyer Questions

Labeling head or applicator machine, which do I need?

A head if products already travel on your conveyor. A machine if there is no conveyor, or you want one unit to feed, apply and discharge by itself. A dispenser only removes the peeling work for hand application.

Which method should I choose: tamp, blow or wipe-on?

Wipe-on for steady conveyor flows, tamp for discrete cycles on boxes and pouches, tamp-blow for delicate surfaces, air-blow for fragile or recessed targets, corner-wrap for tamper-evident edges. Send a photo of the target and we pre-select before quoting.

Will the head fit my existing conveyor?

Yes, that is its purpose. We need conveyor height, travel direction, product spacing, sensor position and supply voltage. Heads adjust for height and angle at install. The detailed checklist is in the retrofit guide.

What label sizes and roll specs are supported?

Labels from L 6–300mm with liner widths 25–125mm, on 76mm cores with roll OD up to 280mm. Liner width is the most common spec mismatch; confirm it against the range before ordering.

How fast can a head run?

T951 is rated 40–120 pcs/min at ±1mm. T952 and T953 run 40–150 pcs/min on stepper drive or 50–200 pcs/min on servo. Rated speed assumes adequate product spacing; the real number is confirmed on your line in the test video.

How are transparent labels handled?

With sensors that detect the boundary between clear film and liner. Standard sensors see straight through transparent stock, so clear-on-clear must be declared at inquiry and is proven on your material before shipment.

Back to top