Drop-in OEM labeling modules for your line: standard mounting interfaces, full I/O documentation, commissioning support, ±1mm.
The module is the labeling station without the frame.
Mount onto a customer conveyor and the line gains a labeling station without a second machine builder.
Build the head into your own filler, capper or packer; serial builds get integrator program pricing.
Add labeling to a line that was never designed for it: height and angle adjust at install.
Mounting interfaces, I/O documentation, SICK sensing, Panasonic PLC and commissioning support.
| Item | T951 inline flat | T953 gantry |
|---|---|---|
| Format | Drop-in module, inline with your conveyor | Drop-in module on an overhead gantry frame |
| Typical use | Flat surfaces, products 10–150mm | Top planes and arc surfaces above existing conveyors |
| Speed | 40–120 pcs/min | 40–150 stepper / 50–200 servo |
| Label size | L6–300 × liner 25–125mm | L6–300 × liner 25–125mm |
| Accuracy | ±1.0mm excluding product and label tolerance | ±1.0mm, same basis |
| Drive | Stepper; servo on request | Stepper or servo build |
| Dimensions / weight | 885×870×1535mm · ≈76kg | 1230×797×845mm · ≈66kg |
| Voltage | AC220V 50/60Hz, other voltages confirmed per market | AC220V 50/60Hz, same basis |
| Delivery | About 10 days after deposit; integration quoted per project | About 10 days after deposit; integration quoted per project |
No proprietary black boxes: the control chain is standard industrial hardware.
| # | Part | Brand / origin |
|---|---|---|
| 1 | Product and label photoelectric sensors | SICK · Germany |
| 2 | PLC controller | Panasonic · Japan |
| 3 | Drive system (traction) | Leadshine stepper · China; servo optional on T953 |
| 4 | Power supply | Mean Well · Taiwan |
| 5 | Stepper motors (auxiliary axes) | Leadshine · China |
A head is the labeling station without the frame: a drop-in module that mounts onto your own conveyor or machine. A complete machine includes conveyor, frame and controls; see the applicator machine range if you need that.
Yes. Both the T951 and T953 ship with standard mounting interfaces and full I/O documentation for PLC signal wiring, and commissioning support is included so the head runs as part of your line.
Yes: system integrators and OEM machine builders can join the integrator program with volume pricing plans. Contact us with your expected annual quantity.
Every unit is tested on your exact container shape, label size and target speed before shipment. You receive the full test video and a sample for approval.
The T951 and T953 are rated ±1mm placement. Across the wider portfolio precision spans from ±1mm on line equipment up to ±0.2mm on the MT-807 benchtop machine, depending on model, label format and application.