One factory from semi-automatic desktop labelers to 15,000 BPH rotary hot melt lines, with the machines and documents to verify it.
Eight machine families, each with its own product page and catalog entry.
| Family | Platforms | Speed / accuracy | Detail |
|---|---|---|---|
| Semi-automatic & desktop | T801–T808 floor units, MT desktops | 15–30 pcs/min · ±0.5mm (±0.2 MT-807) | Range |
| Fully automatic inline | T921, T922R, T923, T931–T936 | 40–300 pcs/min · ±1mm | Range |
| Bottle & jar | Round, square, flat, jar incl. lid-and-body | Model dependent | Range |
| Double-side | T961, T962, T963 combo | 60–120 pcs/min · ±1mm | Range |
| Print & apply | FT-600, T-180 / T-190 waybill applicators | Line rate | Range |
| Hot melt & paste | 12/16-station rotary, multi-station, paste labelers | 10,000–15,000 BPH | Range |
| Shrink sleeve | Tunnel systems for full-body decoration | Spec on request | Range |
| Custom engineering | Bottom, corner, three-panel, odd shapes | Per project | Range |
Flat, square, tapered and curved containers: jigs designed and machined in-house, drawings archived so repeat orders skip the tooling fee.
T95x heads adjusted to your conveyor height and travel direction, so a retrofit never means replacing the line.
Your brand, our factory, with photos, videos and spec sheets your distributors can use. Machine badging and documentation scope agreed per program.
Custom fixtures are cut in-house rather than outsourced, which is why a jig revision takes days, not a purchase order cycle.
Bench by bench, machines are built against the same spec sheets we publish, wired and tested in-house.
Every machine runs a full-speed acceptance test with your bottles before crating, recorded on video.
Fumigated wooden cases per destination, with HS 8422.30 paperwork confirmed on every quotation.
Drawings and sample parameters filed per customer, so a reorder starts from knowledge, not a new sample round.
Commercial terms are boring on purpose: stated with the quote, confirmed in writing, backed by video.
| Machine type | Lead time |
|---|---|
| Semi-automatic standard | 7–10 days after payment confirmation |
| Fully automatic inline | 7–25 days depending on configuration |
| Custom builds and rotary hot melt | 25 days or longer, after engineering review |
| Spare parts after shipment | Dispatch within 48h of confirmation |
A trading company cannot pass these five checks. You can run all of them before wiring a deposit.
A registered manufacturer, not a reseller: license and export record shared on request, machines ship under HS 8422.30 with full customs documentation.
Schedule a call and walk the assembly lines in real time: machines mid-build, the jig workshop, the FAT station, or your machine if it is in production.
Book SGS, QIMA or any inspector you trust for a pre-shipment inspection at your cost. We open the floor, provide power and bottles, and hand over the report.
Your machine runs your bottles at target speed, recorded with the accuracy readout, before the 70% balance is due. What you approve is what ships.
The test-run library shows real factory and customer-site runs, so you can watch a machine like yours before you talk to anyone.
36 models built and tested in our own plant, from desktop MT units to 2,000kg rotary hot melt machines.
Four recent runs on camera, six delivered projects.
HiPaks is the manufacturer: 36 labeler models are built and tested in our own plant, from desktop MT units to 2,000kg rotary hot melt machines. Verify with the five checks above.
Yes. Send samples and we run them at your target speed, delivering the video with accuracy readout within 48 hours of arrival. The quote is based on that exact configuration: jig, sensor and speed.
Semi-automatic standard ships in 7–10 days after payment confirmation; fully automatic inline systems take 7–25 days depending on configuration; custom builds and rotary lines run 25 days or longer after engineering review.
Standard terms are 30% T/T deposit with the 70% balance due only after your machine passes FAT and you have seen the test video. Some configurations are quoted 50/50; the quotation states which applies.
±0.5mm on semi-automatic models, up to ±0.2mm on the MT-807, and ±1mm on fully automatic inline systems. The FAT measures the real reading on your containers before shipment.
SICK, Datasensor and Hypsen sensors, Panasonic PLC, Mean Well power supplies and LeadShine stepper systems: international brands written into the spec sheet, with spares dispatchable in 48 hours.
Yes: OEM and private-label machines for distributors and integrators, with photos, videos and spec sheets under your brand. Jig drawings and sample parameters are archived for fast repeat orders.
ISO 9001 and CE are currently in progress; the documentation scope for your destination is confirmed with the quotation. UL 508A or CSA builds for North America are evaluated per market.