HiPaks builds labeling systems in Guangdong, China, and we are straight about scope: our production focus is pressure-sensitive and hot melt labeling, while wet glue machines are quoted per project. If your line still runs paper labels on a cold glue system.
Wet glue builds are scoped per project, so machine-level parameters are confirmed after we see your bottle, label and target speed. The commercial terms below are standard across all HiPaks machines.
| Term | Detail |
|---|---|
| Lead Time | Semi-automatic machines: 7–10 days. Wet glue and other project-based systems: quoted per project. |
| Payment | 30% deposit on order. 70% balance paid before shipment, after the labeling-test video is approved. |
| Incoterms | FOB Shenzhen by default. CIF / DDP / door-to-door available on request for qualified orders. |
A wet glue labeling machine (also called a cold glue labeler) uses a rotating glue roller or glue pad to pick up water-based adhesive, transfer it onto a plain paper label, and press the label onto the container. Because the label itself carries no adhesive and no release liner, label stock costs.
All HiPaks machines are built to CE standards. Other certificates are confirmed per project; ask our team for the latest documentation.
Certification in progress, documents on request
Certification in progress
Confirmed per project in writing
Confirmed at inquiry
Whether your project ends up wet glue, hot melt or self-adhesive, it is built by the same factory, with the same test discipline on every machine that ships.
HiPaks machines run in 500+ factories across 50+ countries, with strong presence in the US, EU, Middle East and Southeast Asia.
Founded by an engineer with 15 years of labeling-machine industry experience. Your project is scoped by engineers, not resold by traders.
SICK photoelectric sensors and Panasonic servo drives on the critical axes: proven reliability on 24/7 production lines.
Every model has a real labeling-test video. Your machine is tested on your real containers before shipping. You approve the test video and sample first.