China labeling machine manufacturer, OEM/ODM, semi-automatic to high-speed rotary systems.

Bottle Labeling Machine Manufacturer. Round, Square and Flat Bottles.

HiPaks is a labeling machine manufacturer in Guangdong, China, building bottle labelers for round, square, flat and tapered containers, from desktop semi-automatic units to 10,000–15,000 bph rotary systems. Semi-automatic models hold ±0.5mm, the MT-807 flat.

±0.5mm
Placement accuracy, semi-automatic range
up to ±0.2mm
MT-807 high-precision flat platform
7–25days
Lead time, custom builds 25 days
1unit
MOQ on standard models

A Bottle Labeler for Every Shape

We organize our bottle labeling range by container shape, because that is how buyers actually search. Round bottles run on wrap-around machines (MT-805 semi-automatic, T921 inline automatic, T923 horizontal for small vials). Square and flat bottles run on two-side machines (MT-860, T961, T962).

MT-805 semi-automatic wrap-around labeling machine applying a label to a round bottle
MT-805 semi-automatic wrap-around labeler: desktop solution for round bottles and small batches.

Real Specs. Commercial Terms Upfront.

Bottle labeling machine price is driven by three things: bottle shape, target speed and automation level. Send us your bottle photo and we reply with a matched solution and a factory quote.

TermDetail
DeliverySemi-automatic desktop: 7–10 days. Automatic and rotary systems: 7–25 days, custom builds 25 days, confirmed against your configuration.
PaymentStandard terms are 30% deposit and 70% before shipment, released after your bottle test video is approved. Certain models can be quoted at 50/50; the split is written into the quotation.
IncotermsFOB Shenzhen by default. CIF / DDP / door-to-door available on request.

Built Around Your Bottle

Every HiPaks bottle labeler is engineered around the customer’s container. Our 15-year engineering team designs the tooling, you send a sample bottle, and we run the labeling test before you commit.

  • Custom bottle separators (split screws) and guide rails matched to your bottle diameter
  • Wrap rollers and vacuum jigs for tapered, oval and irregular bottles
  • Line integration with fillers and cappers: conveyor adapters and PLC signal wiring
  • Private-label branding on chassis, HMI splash screens and export packing
  • HMI strings and control panels in your language
HiPaks production hall where custom bottle labeling tooling is engineered
Our 15-year engineering team designs the tooling, you send a sample bottle, and we run the labeling test before you commit

Certifications & Compliance

We publish only what is verified. CE and ISO 9001 certification are in progress; the current document status for your market is confirmed in writing at inquiry.

Standard

CE Marking

Certification in progress, documents on request

System

ISO 9001

Certification in progress

Product

Machine-Specific Certs

Confirmed per project in writing

Components

SICK & Panasonic

Sensors & drives on critical axes

500+ Factories Served. Every Bottle Tested.

Bottle labeling machines for beverage, cosmetic, pharmaceutical and chemical lines, delivered to 500+ factories in 50+ countries. See real customer cases →

50+ Countries, 500+ Factories Served

Bottle labelers delivered to 500+ factories across 50+ countries, with strong presence in the US, EU, Middle East and Southeast Asia.

Engineer-Founded

Founded by an engineer with 15 years of labeling-machine experience. Your bottle sample is evaluated by engineering, not sales.

SICK & Panasonic Core

SICK photoelectric sensors and Panasonic servo drives on critical axes: proven reliability on 24/7 bottling lines.

Real-Bottle Test Video

Every machine runs a labeling test on your actual bottles before shipping. You approve the test video and a physical sample first.

Manufacturer Questions

What bottle shapes can your machines label?
Round, square, flat and tapered bottles. Wrap-around models (MT-805, T921) handle round containers, two-side models (MT-860, T961, T962) handle square and flat bottles, flat models (MT-807, T931) handle panels and pouches, and tapered bottles run on wrap stations with custom rollers.
What is the labeling speed for round bottles?
It depends on the automation tier. Semi-automatic desktop units run 15–30 pcs/min for small batches, the T921 inline machine covers mid-to-high speed production, and our 12-station and 16-station hot melt rotary systems cover 10,000–15,000 bottles per hour on beverage lines. Exact speed is confirmed against your bottle diameter and label size at the quote stage.
How accurate is your bottle labeling?
Benchtop semi-automatics are specified at ±0.5mm, the MT-807 flat platform reaches up to ±0.2mm, and automatic lines are specified at ±1mm. Every machine is tested on your real bottles before shipping, and the reading at your target speed is recorded in the factory acceptance test.
Can the machine connect to our filling line?
Yes. Inline and two-side models integrate with fillers, cappers and conveyors. We supply conveyor adapters, PLC signal wiring and commissioning support for full line integration.
What information do you need to quote a bottle labeling machine?
Send your bottle photos or a sample, bottle dimensions, label size and material, and your target speed. Our engineers reply with a machine recommendation, an indicative price and a free test-run plan on your bottles.
What are the payment, warranty and lead time terms?
Standard terms are 30% deposit and 70% before shipment, with a 50/50 split available on certain models and written into your quotation. Semi-automatic machines ship in 7–10 days, automatic lines in 7–25 days, custom builds 25 days. Every machine carries a one-year warranty plus lifetime technical support.
Back to top