China labeling machine manufacturer, OEM/ODM, semi-automatic to high-speed rotary systems.

Automatic Labeling Machine Manufacturer. Inline Labelers, Built in China.

HiPaks is a labeling machine manufacturer in Guangdong, China, building the T9xx automatic series: round bottle, horizontal, flat, single-side and two-side inline labelers that connect to your PLC line. Automatic lines hold ±1mm placement and run 40–300.

±1mm
Placement accuracy, standard automatic range
36
Models across six families
7–25days
Automatic lead time, custom builds 25 days
1unit
MOQ on standard models

The Full T9xx Inline Automatic Series

Our automatic range covers every inline labeling scenario: T921 wrap-around for round bottles, T923 horizontal for vials and unstable small bottles, T931 flat labeling and T932 flat-with-paging for sheets, pouches and cartons, T961 single-side, T962 two-side, and T963 two-side with round-bottle orientation. Every machine feeds from its own conveyor and synchronizes with your line. Full model list in the product.

T961 automatic single-side labeling machine running inline with conveyor
T961 automatic single-side labeler: inline side labeling with conveyor feeding.

Spec Sheet You Can Build a Line Around

Automatic lines hold ±1mm placement on the standard T9xx range; where a project needs tighter placement we quote the high-precision flat platform. Labeling speed depends on model, container size and label format, so we confirm exact numbers against your samples at the quote stage instead of.

TermDetail
DeliverySemi-automatic desktop: 7–10 days. Fully automatic inline systems: 7–25 days, custom builds 25 days, confirmed at the quote stage against your configuration.
PaymentStandard terms are 30% deposit and 70% before shipment, released after your machine test video is approved. Certain models can be quoted at 50/50; the split on your order is written into the quotation.
IncotermsFOB Shenzhen by default. CIF / DDP / door-to-door available on request.

Customized to Your Line Takt

An automatic labeler is only as good as its fit with your line. Our engineering team (led by a founder with 15 years in labeling machines) designs the integration around your takt, containers and control system.

  • Conveyors and bottle separators tuned to your line takt and container sizes
  • T95x applicator modules that drop into your existing automatic line
  • Special labeling stations: corner wrap, oriented round bottle, top and bottom
  • PLC signal wiring and I/O synchronization with upstream and downstream equipment
  • Private-label builds for distributors and system integrators
T951 inline flat labeling applicator head module at the HiPaks facility
T95x applicator modules that drop into your existing automatic line

Certifications & Compliance

We publish only what is verified. CE and ISO 9001 certification are in progress; the current document status for your market is confirmed in writing at inquiry, and machine-specific certificates are quoted per project.

Standard

CE Marking

Certification in progress, documents on request

System

ISO 9001

Certification in progress

Product

Machine-Specific Certs

Confirmed per project in writing

Components

SICK & Panasonic

Sensors & drives on critical axes

Commissioned on Video Before It Ships

Automatic lines fail or succeed at commissioning. We run your machine on your containers, film it, and support you remotely for the life of the equipment.

50+ Countries, 500+ Factories Served

Automatic labeling systems delivered to 500+ factories across 50+ countries: food, beverage, cosmetic, pharmaceutical and chemical lines.

Engineer-Founded

Founded by an engineer with 15 years of labeling-machine experience. Line-integration questions go straight to engineering.

SICK & Panasonic Core

SICK photoelectric sensors and Panasonic servo drives on critical axes: stable registration on 24/7 automatic lines.

Line Commissioning Video

Every automatic machine is run with your containers before shipping. You get the commissioning video, plus remote support via WhatsApp after delivery.

Manufacturer Questions

What is the difference between semi-automatic and automatic labeling machines?
A semi-automatic machine is a desktop unit where an operator places each container by hand: simple, ships in 7–10 days, ideal for small batches. An automatic machine runs on its own conveyor, feeds containers automatically and integrates into your production line for continuous output.
What accuracy can I expect on an automatic line?
The standard T9xx automatic range is specified at ±1mm placement. Where a project needs tighter registration, we quote the high-precision platform and record the actual reading on your container during the factory acceptance test, at several speeds including your target rate.
Can your automatic labeler connect to our PLC line?
Yes. Our T9xx inline machines support I/O signal wiring to your PLC, conveyor speed synchronization with upstream and downstream equipment, and we supply an integration drawing before shipment.
What speed can I expect for round bottles?
Speed depends on the model, bottle diameter and label size. The T921 inline wrap-around machine covers mid-to-high speed production, while our 12-station and 16-station hot melt rotary systems cover 10,000–15,000 bottles per hour depending on configuration. Share your target speed and we confirm the exact figure at the quote stage.
What are the payment, warranty and support terms?
Standard terms are 30% deposit and 70% before shipment, with a 50/50 split available on certain models and written into your quotation. Every machine carries a one-year warranty plus lifetime technical support, spare parts through the documented parts list, and an English manual with operation videos.
Do you provide installation and training?
Every machine ships after a full labeling test on your containers, with a test video for your approval. We provide remote installation support via WhatsApp plus operating documentation, and on-site commissioning support is available for line-integration projects.
What is the lead time for an automatic labeling machine?
Semi-automatic models ship in 7–10 days after payment confirmation. Fully automatic inline systems run 7–25 days, with custom builds quoted at 25 days, based on configuration and customization scope.
Back to top