Price bands, accuracy at your line speed, changeover time, transparent labels, payment terms and warranty, answered with the numbers we publish elsewhere on this site.
What machines cost, and which platform fits which volume.
Most projects land in three bands: semi-automatic $600–4,500, fully automatic $6,000–15,000, and rotary hot melt from $25,000, with double-side automatic around $9,000. The spread inside a band comes from the platform, the sensor class and the tooling, not from the catalogue name. See the full price table in the price center.
A semi-automatic machine needs an operator to place each container (15–30 pcs/min, ±0.5mm); an automatic machine feeds from your conveyor and runs 40–300 pcs/min at ±1mm without per-piece labor. Semi-automatic is the low-risk first step; automatic removes the labor bottleneck. Compare the semi-automatic range before deciding.
Start from three facts: bottle geometry, label dimensions and target speed, because every platform is specified around them. Round bottles point to wrap platforms, flat and square to double-side, tapers and odd shapes to custom jigs, tiny diameters to horizontal. Walk the full selection guide to map your inputs to a platform.
When labeling starts dictating your shipping calendar: batches wait at the labeling table while the rest of the line idles. The honest test is arithmetic, not instinct: wages versus machine cost versus growth. Run your numbers through the upgrade and payback calculator.
What the numbers mean at line speed, and why rated values move.
Published tiers are ±0.5mm on benchtop semi-automatics, up to ±0.2mm on the MT-807 flat platform, and ±1mm on automatic lines. What the machine reads at your target speed with your container is recorded during the FAT. A spec without the working condition is an advertisement; ours arrives with the run on video. See the automatic platform specs.
Yes. Double-side platforms (MT-860 semi-automatic, T962 automatic) apply front and back in one pass, and multi-head machines cover top-and-bottom and seal applications. Label count is a head-count question, decided by container geometry and line speed. See how one-pass double-side works.
Yes, the T95x labeling heads mount over the conveyor you already run, with height, angle and trigger tuned to your line. Retrofit needs three inputs: conveyor height, travel direction and available footprint. Read the retrofit and integration guide for the full checklist.
Round, square, flat, oval and tapered bottles; jars; vials and tubes; pouches and bags; boxes and cartons; wires and cables; plus non-standard shapes through engineered jigs. Adhesive and surface energy matter as much as geometry, which is why we test on your actual product first. See what custom engineering covers.
We do not publish a single changeover figure, because it depends on the platform and on how far apart your SKUs sit. What we can show is the complete changeover filmed with the clock running, start to first good bottle, plus the per-SKU recipes archived for the next campaign. Ask for the timed video of your platform. Watch the timed changeover section.
The failures buyers ask about first, and the mechanical fixes.
Most bubbles and wrinkles come from three causes: application pressure set for the wrong container stiffness, a label taller than the container’s straight-wall zone, or a contaminated or irregular surface. Each has a mechanical fix. Pressure is calibrated to container stiffness; label height is checked against geometry before printing; surfaces are handled clean and dry. Work through the troubleshooting guide for the systematic diagnosis.
Because circumference changes under the label: a long label on a tight curve or a taper has to stretch, which it cannot do, so it wrinkles instead. The fixes are shorter labels inside the straight zone, horizontal handling for slim diameters, or engineered jigs that present the bottle at a constant angle. Read the tapered bottle guide for the full decision tree.
Alignment on round bottles is won by mechanical repeatability: consistent bottle presentation, matched roller pressure, and a sensor that fires at the same point in every cycle. If the seam wanders, check presentation and sensor timing before touching the label stock. See the round-bottle platform engineering notes.
Yes, with ultrasonic sensing. Photoelectric sensors read light interruption, which a transparent label never creates, while ultrasonic sensors read the label’s physical thickness against the liner. SICK sensors are fitted at build time where the label spec calls for them. See the T803, specified for transparent-label detection.
Payment structure, inspection points and what protects the deposit.
Our standard terms are 30% T/T deposit and 70% T/T balance before delivery, with 50/50 split on certain models (MT-803, T821, T961, T962, T963); L/C and third-party inspection can be arranged on a first order. What protects the money is evidence at each gate: the FAT video releases nothing until it passes. Read the buy-from-China safety guide.
Verify three things: that the factory builds what it shows (live video tour or third-party audit), that it tests what it sells (FAT on your product), and that it supports what it ships (a named support channel and a spare-parts path). Claims are cheap; recorded evidence is not. Start with the manufacturer portal, then ask us anything it does not answer.
Labeling machines classify under HS 8422.30. The duty rate and any additional tariff depend on the trade measures in force at your import date, so confirm with your customs broker before quoting a landed cost. We supply the commercial invoice and HS information your broker needs. See the import planning guide.
Semi-automatic machines ship 7–10 days after payment confirmation; automatic platforms run 7–25 days, and custom builds are quoted with their own schedule. Shipping runs express, air or sea against your deadline, with the export packing specified at order. Ask for current lead times on your configuration.
CE and ISO 9001 certification are in progress. The current document status for your market is confirmed in writing at inquiry, and a CSA-grade electrical configuration can be scoped for Canada. Market-specific electrical variants are a build-time decision, not a retrofit. Read the CE / UL / CSA compliance guide.
Coverage, spare parts and how support actually works.
One year machine warranty plus lifetime technical support, with spare parts available through the documented parts list. Support runs on a named channel (email and remote assistance) backed by the FAT archive of your machine. See the parts diagram and spares guide.
Yes. Every machine ships with an English operation manual and operation videos, so line staff can be trained without a translator in the room. The FAT video doubles as a setup reference because it shows your product running on your machine. See the full delivery package in the FAT section.
Five items: the machine, run in and adjusted before packing; the factory test-run video; the English manual and operation videos; the random spare-parts kit; and the lifetime technical support entry. Everything arrives itemized, with nothing left to “usually included”. Request the delivery checklist for your model.
How the free test run proves the machine on your container.
Yes. Send your bottles and labels and you receive a test-run video within 48 hours of our engineering evaluation, free and without obligation. It is our standard process, not a favor: every quotation is built on a recorded run. Browse the test video library to see what yours will look like.
Because the FAT measures it: placement accuracy recorded at several speeds including your target rate, with your bottle and label, before the balance payment is due. If the reading is wrong, the machine does not ship. The evidence chain does the trusting. Read the 10-point FAT process.
Send the container, the label size and your target speed. You get a machine recommendation, an indicative price and a free test-run plan on your own labels.