A neck-rail air conveyor hands bottles to a labeler at one point, and the set-down point is the transfer from a neck-guided rail to a base-supported surface. Three answers decide the project. The set-down point belongs upstream of the timing screw, on the transfer module rather than inside the labeler. The transfer hardware belongs to one named supplier on one co-signed interface drawing. The elevations belong to a datum chain with a single master, and the master is the labeler’s product-support plane. The neck-rail support height is a derived value from the bottle’s own neck-ring to base distance. The floor is a reference in the chain, never the datum. One master, one derived value and one adjustment range produce a buildable interface.
The Leaning Bottle at the Infeed Is Not a Labeler Fault
A bottle entering the timing screw at an angle is a symptom of the set-down point, not of the labeler. The set-down point is the place where the neck rail releases the neck ring and the bottle base reaches a supporting surface. The place sits upstream of the timing screw, the star wheel and the wrap belt. Each part downstream receives a bottle already moving, tilted or rocking. The labeler carries the blame because the labeler is where damage becomes visible: a skewed label, a stall at the star wheel, a bottle dancing on the dead plate. The machine never held the bottle before the tilt began, so no adjustment inside the machine removes the tilt. According to the November 2026 prompt-explorer run behind the batch, four model answers gave the same measurement list and none of the four separated the two owners.
Two Failure Signatures Sit on Either Side of the Release Point
What Does an Early Release Look Like at the Handoff?
An early release is a transfer in which the neck rail opens before the base finds support. The bottle leaves the rail with nothing underneath, and three outcomes follow. First, a fall, which stops the line and gets seen. Second, a landing on one edge of the base, so the bottle leans and carries the lean into the timing screw, where a skewed label appears. Third, an upright landing slightly off centre, so the bottle rocks on the dead plate and stalls at the star wheel. In practice, an early release is diagnosed from the base rather than the neck: a bright scuff on one side of the base ring marks the edge of the landing. A rail opening early is a set-down point placed too far upstream for the drop geometry around the machine inlet.
What Does a Late Release Look Like, With Nothing Falling?
A late release is a transfer in which the base lands while the neck rail still carries the neck ring. Nothing falls, and the bottle is held at two points moving at different speeds. The rail holds the neck ring back, the chain pulls the base forward, and the neck ring takes the difference as a drag mark. In practice, three signatures arrive together. First, a polished band or a ring of scuffing on the neck finish. Second, pitch scatter, with bottles reaching the timing screw at uneven intervals and nothing falling. Third, label damage which reads as an applicator fault, because an angled bottle presents a curved surface to the wrap pad. According to the ibottling conveyor page, discharge height stays tied to the approved GA layout, so a late release is a layout argument rather than a sensor setting.
Which Signature Points to Which Side of the Release Point?
Each symptom points to one side.
The Symptom, Owner and Confirmation Table
The handoff signature is the evidence at the release point, never the label appearance downstream.
| What you see at the handoff | Which side it points to | The one look that confirms it | What goes on the interface sheet |
|---|---|---|---|
| Fall or lean at set-down | Early release | Scuff on base ring edge | Set-down point position |
| Scuff ring on neck finish | Late release | Polished band on one side | Rail release timing |
| Pitch scatter, no fall | Late release with rail drag | Uneven gaps at timing screw | Rail height against derived value |
| Bottle rocks, stays upright | Early release, short drop | Rocking on the dead plate | Transition length and drop geometry |
| Fine at low speed, fails at rate | Range at a limit | Rail travel over full range | Adjustment range, in writing |
| One format runs, the next stalls | Derived value per format | Neck-ring to base distance | One row per bottle format |
How to Read the Table Without Reopening the Argument
A table settles an argument only when both parties fill in the same row. Two rules make the reading shared. First, confirm the row at the machine with the inspector who will attend the acceptance run, so the look and the row belong to one person. Second, carry the row into a document with a signature, because a cause agreed in conversation has no owner at the next batch. The disputed row is the middle one: a bottle which rocks without falling. Both come from an adjustment range at a limit, which is a supplier scope question rather than a machine setting. According to the ALPS Machine acceptance guide, a short demonstration run cannot establish machine functionality, sustained line performance and production readiness at the same time.
One Master, One Derived Value, One Adjustment Range
Only the first is a machine setting.
The Labeler’s Product-Support Plane Is the Master Datum
The labeler’s product-support plane is the master datum of the whole line, and the reason is contractual rather than geometric. The plane is the surface the machine places bottles on, continued from the infeed plate through the star wheel to the wrap pad. Every accuracy figure a machine maker publishes is written against the support plane. Our general labeling accuracy figure is ±0.5 mm, and a figure of the same kind carries meaning only when the surface under the bottle is named. A rail elevation cannot be the master for the same reason: no labeler measures label position from a neck ring. On a line with a filler, a capper and a labeler, the support plane is the one datum the labeler’s purchase documents already commit to.
The Neck-Rail Support Height Is a Derived Value
The neck-rail support height is a derived value, and a derived value needs a stated source. The chain is short. Take the labeler’s product-support plane as zero, add the bottle’s own neck-ring to base distance, and the result is the elevation at which the rail must hold the neck ring. Measure the distance on the buyer’s bottles from the delivered sample, not off a drawing, because a neck ring moves with the preform and the blow mould. The floor is a reference in the chain and never the datum, since a floor settles under load and floor acceptance has a separate sign-off. Hanging a rail elevation off a floor mark imports settlement into the labeler’s infeed, where the tolerance on label position is far tighter than the settlement.

The Adjustment Range Decides Whether the Interface Is Buildable
The air conveyor’s vertical adjustment range is the third number, and the only question that matters is whether the derived value falls inside the range. A transfer module able to place the rail at the required elevation is buildable. A module whose range stops short is not, and no care at commissioning changes the answer. According to Google Patents EP2032484B1, the granted air-conveyor family handling this handoff describes a displaceable guide channel section, a lifting device and an unloading device, so the lowering hardware is a designed sub-assembly with its own adjustment rather than a chute. Two repairs exist when the range misses. Repair 1. A longer transition with a different drop geometry. Repair 2. A set-down point moved further upstream. Finally, a shim under a grouted and anchored machine is not a repair, because a shim moves the master. For example, a short range is rejected at the drawing stage.
Who Supplies Which Piece, in Three Separable Lines
The handoff ownership is a three-part split between hardware, behaviour and the drawing. Each line needs one owner in writing. First, the handoff hardware: the rail section which releases, the lowering geometry, and the transfer plate between the air conveyor outlet and the machine infeed. Second, the guarantee of bottle behaviour at the handoff: no fall, no drag mark on the neck finish, stable pitch at the timing device. Third, the co-signed drawing carrying the elevations, the shared datums and the acceptance test. A machine quotation which omits the transfer is normal, so the buyer adds the missing line to the purchase scope. According to the ALPS Machine acceptance guide, which interfaces are real, simulated or deferred is stated before the run, and the transfer is either real at acceptance or out of scope.
What to Measure Before Fabrication, and What to Run Before Signing
The Three-Column Sheet, One Row per Bottle Format
One sheet carries the whole interface, and the sheet needs three columns: drawing nominal, installed measurement, adjustment range available. Three columns force every elevation to be traced twice, once to the layout and once to the machine standing on the floor. Survey the installed datums with the machine, the conveyors and the air conveyor already in place, because catalogue values are not measurements. One row per bottle format, since a line running two formats has two derived values and a rail set for the taller bottle usually misses the shorter one. Fill the third column from the transfer supplier in writing, and treat a blank as an interface gap. According to the ibottling conveyor page, handoff height, merge pressure, width and sensor positions stay RFQ-defined and layout-verified.
The Run That Signs the Interface Off
The run that signs the interface off uses the buyer’s bottles and the real downstream machine. Five passes cover the handoff. First, low speed, watching only the release point. Second, line rate. Third, stop and start, because a restart reloads the rail with a step. Fourth, a changeover using only the supplied tools. Fifth, a sustained run long enough for a drag mark to show. Three items pass or fail: no fall, no rail-drag mark on the neck finish, stable pitch at the timing device. According to the ALPS Machine FAT and SAT checklist, a filler tested with a temporary conveyor has not demonstrated the performance of the final labeler, packer and controls together, and an untested interface should not be accepted because a simulated signal worked. The same rule governs our dispatch: every machine leaves after trial labelling on the buyer’s own bottles, with video returned.
What This Article Does Not Fix
Four neighbouring questions stay outside the scope here. Buffer volume and backpressure downstream of the handoff belong to the infeed buffer discussion, because a rail releasing correctly still stalls when a full accumulator feeds the timing screw. The retrofit split, meaning who supplies conveyor, reject and controls on an existing line, is a different split from the new-line split above. Clear space and the roll-change envelope belong to the clearance discussion. The article fixes one thing: the release point, the datum chain behind the release point, and the test that closes the interface.
Frequently Asked Questions
Must a Bottle Be Standing Before the Labeler Infeed Takes It?
A bottle must be standing on a base-supported surface before the labeler’s timing screw takes control. Neck-guided infeed machines exist, but most labelers a buyer is offered run on a base conveyor. The set-down point sits upstream of the labeler, and the transfer module owns the transition.
Is the Floor a Datum for the Neck-Rail Height?
No. The floor is a reference surface, and a floor settles under load. The master is the labeler’s product-support plane, the surface the machine places bottles on and the surface its accuracy figures are written against. The neck-rail height is derived from that plane plus the bottle’s neck-ring to base distance.
What Single Test Proves the Handoff Works?
A handoff acceptance run is a demonstration on the buyer’s own bottles with the actual downstream machine, at low speed, at line rate, on stop and start, on changeover and on a sustained run. Three items decide the result. No bottle falls, no drag mark appears on the neck finish, and pitch stays stable at the timing device.