Integration is the point where CE responsibility changes hands. Once an applicator is bolted onto a buyer’s own conveyor and the assembly is put into service, the buyer is the manufacturer of that assembly, not the supplier of the head. The supplier’s obligation is narrower, and the obligation arrives as a declaration of incorporation, a document stating that partly completed machinery must not be commissioned until the final assembly is declared. The commercial consequence is simple. A 30% deposit and a 70% balance should be released against a document package and a witnessed run, not against a shipping date. In practice, according to Regulation (EU) 2023/1230, which replaces Directive 2006/42/EC on 20 January 2027, the package has a fixed content, and in 2026 many buyers still accept a one-page certificate with no legal standing.

Who Becomes the Manufacturer When the Head Goes Onto Your Line?

The manufacturer is the party placing the machinery on the market or putting the machinery into service under its own name, and that party carries 100% of the conformity duty for the assembly. Two cases decide the answer. In the first case, the supplier delivers a complete machine already bearing the CE mark and the buyer connects power, air and conveyor; the supplier remains manufacturer of 100% of that machine. In the second case, the supplier delivers a partly completed applicator with a declaration of incorporation, and the buyer builds the assembly; the assembly is the buyer’s to declare. For example, a retrofit adding a head to an existing conveyor usually lands in the second case, and according to European Commission guidance the manufacturer answers for the entire product, including components supplied by others. In 2026 an applicator head quotation should state which document travels with the crate.

Inline labeling applicator head mounted over an existing conveyor, the integration point where the buyer becomes manufacturer of the assembly

What Must an EU Declaration of Conformity Contain?

A declaration of conformity is a signed statement identifying the machine, the legislation applied and the standards used, and market surveillance authorities ask for the document first. Annex II of Regulation (EU) 2023/1230 sets the content: business name and address, machine description and serial number, 100% of the directives and harmonised standards applied, the person authorised to compile the technical file, place and date, and signature. The technical file behind the declaration is kept for 10 years after the machine is placed on the market. The CE mark is at least 5 mm high, with a four-digit notified body number beside the mark where a body was involved. In practice the declaration covers the machine as delivered, so a head sold without a declaration is a component rather than a machine, and according to Annex II the paperwork follows the scope of supply. The CE, UL and CSA comparison covers the North American side in 2026.

Declaration of Incorporation or Declaration of Conformity?

A declaration of incorporation is the document issued for partly completed machinery, and the document is deliberately weaker than a declaration of conformity. The supplier states which essential health and safety requirements were applied and which ones were left to the integrator, supplies assembly instructions, and confirms the unit must not be put into service until the final machinery is declared conform. The unit must not carry the CE mark, because the assembly does not exist yet. In practice this leaves 100% of the final conformity work with the party building the line, which is the buyer in most retrofit projects. According to the Guide to the application of the Machinery Directive, edition 2.3 published in April 2024, the integrator becomes the manufacturer of the assembly. A retrofit treating the incorporation declaration as a formality pays for that mistake at the first audit.

Which Document Package Fits Each Integration Case?

The document package is the paperwork that follows a purchase, and the table sorts three common purchases by the document due with the crate and the party who signs the final declaration, because a head sold as partly completed machinery and a line sold as a working system carry different paperwork. In practice the middle row covers most retrofit projects, where an existing conveyor and filler stay in place, only the labeling station is new, and the buyer’s own name ends up on the declaration that lets the line run for the first time in 2026, because according to Regulation (EU) 2023/1230 the declaration covers 100% of the scope of supply.

Purchase Supplier document Who declares the assembly CE mark on
Complete applicator, connected to services only DoC plus technical file index Supplier, for the applicator The applicator
Partly completed head, incorporated into a line DoI plus assembly instructions Buyer, for the assembly The assembly, after declaration
Line supplied, installed and integrated by supplier DoC for the line Supplier, for the line The line

Where Does Manufacturer Responsibility Actually Transfer?

Manufacturer responsibility is the duty that transfers at the moment the assembly is placed on the market or put into service, not when the purchase order is signed. The European Commission states the rule plainly: a business having a product made for it and selling the product under its own name is the manufacturer, and that manufacturer answers for 100% of the finished product, including components supplied by others. The Commission machinery page adds a second trigger, because existing machinery modified to such an extent that the machinery becomes de facto new machinery counts as newly placed on the market. In practice, according to Commission CE marking guidance, the test is the assembly that reaches the market or starts work, not the invoice. In 2026 the test decides whether the crate needs a declaration of conformity or a declaration of incorporation before the first production shift.

Which Payment Structure Protects the Balance?

A document-linked payment is a schedule releasing the balance only after named documents and a witnessed test are accepted. The schedule is the only bargaining power a buyer keeps once the deposit has left. On our terms the split is 30% with the order and 70% before shipment. Some models run 50/50. The balance clause is written before the machine is built, not after the machine is crated. The 70% should hang on three events: the final declaration form, the technical file index, and a timed run on the buyer’s own bottles and labels. According to Incoterms 2020, FOB Shenzhen transfers risk when the goods are on board, so a document dispute after that point becomes a claim rather than a hold. In practice the clause reads balance within five working days of accepted documents in 2026.

How Do You Prove the Assembly at Factory Acceptance?

Factory acceptance is a witnessed run proving the assembly at the agreed rate, and the run is the only evidence surviving a change of project engineer. Three consecutive runs, each starting from a cold stop, expose what a single demonstration hides. Check 100% of the safety functions on the integrated line, including the interlock on any guard added during the retrofit, then sample placement against a stated limit. According to ISO 2859-1, a lot of 501 to 1,200 units at inspection level II is sampled at 80 pieces, and at an AQL of 1.0% the acceptance number is 2, so the plan is a decision rule rather than an opinion. In practice the sampling plan settles arguments before the arguments start. We run buyer bottles and labels before shipment and send the video, and the acceptance record lists every check in 2026.

What Goes Into the Acceptance Record?

An acceptance record is the signed evidence that supports a declaration, and the table below turns the run into that document, with a pass condition attached to each line and evidence named rather than intention stated, because an auditor reading the declaration in 2026 will ask which measurements support the signature before the crate is released. A row without evidence counts as a fail at the acceptance meeting, however well the machine ran on the day, because according to ISO 2859-1 the sample is judged against the stated acceptance number, and the record is kept with the technical file for ten years after the line enters service.

Record item Evidence Pass condition
Declaration type Signed DoC or DoI, final revision Names the serial number
Technical file index Annex VII checklist Every section addressed
Safety functions Interlock and stop test log 100% of functions checked
Placement sample 80 pieces, acceptance 2 2 or fewer defects
Rate Timed run, both formats Quoted rate sustained

What If the Supplier Cannot Produce the File?

A compliance hold is a documented stop on payment or shipment until a named document arrives, and the hold is the buyer’s only lawful lever when a supplier has no file. First, check the notified body number against NANDO, the Commission database listing each body and the legislation covered, because a certificate from an unlisted body proves nothing. Second, ask whether the crate is a machine or partly completed machinery, since the answer decides between a declaration of conformity and a declaration of incorporation. Third, hold back 10% until the signed declaration names the buyer’s serial number and lists 100% of the safety functions. According to the European Commission, voluntary certificates have no value in market surveillance checks or at customs. In 2026 a supplier unable to produce the declaration usually can produce the incorporation declaration, and that document changes who signs.

What Should the Purchase Order Say About CE?

A CE clause is the purchase order text naming the document, the content and the consequence of late delivery, and the clause converts a promise into a deliverable. Write five lines. First, name the declaration type due from the supplier, conformity for a complete machine, incorporation for a partly completed head. Second, require the technical file index and the assembly instructions as attachments. Third, require the notified body number where one applies, so the NANDO check is possible. Fourth, require the declaration to name the buyer’s serial number and the delivery date. Fifth, tie the 70% balance to the package and keep a 10% retention until the file arrives. According to ISO 9001, documents affecting conformity must be controlled and available, and in practice the clause costs one paragraph in 2026 and prevents a customs argument at the port. Send the draft clause to our quotation team and the reply names the declaration type for the scope of supply.

Does a CE Certificate Prove a Labeling Head Is Compliant?

A CE certificate is a document that EU law does not issue, so a PDF carrying a CE logo proves only that someone printed a PDF. The Commission states no central EU body grants permission or a certificate to use the CE mark, and voluntary certificates have no value in market surveillance checks or at customs. What exists is a declaration of conformity signed by the manufacturer and backed by a technical file. For most labeling machinery the route is self-declaration against the essential health and safety requirements. A notified body appears only where the legislation demands a specific assessment, and the four-digit number beside the mark identifies that body. In practice, according to European Commission guidance, the declaration covers 100% of the machine as delivered. In 2026 the correct request is the signed declaration plus the file index, never a certificate.

Can the Supplier Sign the Declaration for a Line You Assembled?

A contract assembly is an arrangement where one party builds the line and another supplies the head, and the declaration follows control. A supplier can sign the declaration for an assembly only where the supplier integrates the line and can document 100% of the assembly against the essential requirements, including the conveyor, guards and interfaces the supplier did not manufacture. Where the buyer bolts the head onto its own conveyor, the supplier cannot truthfully declare the buyer’s work, and a document claiming otherwise is the voluntary certificate problem in another form. The practical split is a declaration of incorporation for the head and a declaration of conformity for the assembly, signed by the buyer. In practice, according to Regulation (EU) 2023/1230, the manufacturer is the party placing the assembly on the market or putting the assembly into service. In 2026 this is a control question before the question becomes legal.

What Happens If You Skip the Declaration Entirely?

An undeclared assembly is a machine without a lawful route into service in the EU, and the exposure sits with the party owning the line. The assembly falls inside the machinery legislation once put into service, so a declaration and a technical file are due before the first production shift rather than before the first audit. Market surveillance authorities act on the product and can require corrective action, and a future buyer of the line will ask for the file during due diligence. The technical file is kept for 10 years, longer than most project engineers stay in one role, so the archive belongs to the company rather than to a person. In practice, according to European Commission guidance, putting a modified assembly into service can make 100% of the assembly de facto new machinery. In 2026 the cheapest moment to write the declaration is before the crate is opened.

Get a factory quote for your own container.

Send the container, label size and target speed. You get a short list of machine options, an indicative price and a free test-run plan on your own labels.

Get a Factory Quote Request a Free Test-Run Video

Share

Related reading

Keep reading.

More guides from the same category, chosen for the machine types and container details they cover.

Labeling Machine Manufacturer Guides

How Many Bottles Prove a Labeler? The Sampling Plan

An acceptance sampling plan for a labeler is a rule for deciding, from a counted sample of labelled bottles, whether the machine may be accepted, and the bottle count is the last item to fix rather than the first. Five parts carry the plan: the population, one bottle lot crossed with one label station and ... <a title="How Many Bottles Prove a Labeler? The Sampling Plan" class="read-more" href="https://hipaks.com/labeled-output-acceptance-sampling-defect-classes/" aria-label="Read more about How Many Bottles Prove a Labeler? The Sampling Plan">Read more</a>

Nov 25, 2026 · 11 min read
Read guide
Labeling Machine Manufacturer Guides

Uptime Clause: Which Stops Count Against the Supplier?

An uptime clause is a formula with four decisions written into the purchase contract, and month one is where those decisions meet an installed machine. The four decisions are the two clocks, the closed list of exclusions, the boundary between supplier stops and buyer stops, and the evidence attached to every stop. On a pressure-sensitive ... <a title="Uptime Clause: Which Stops Count Against the Supplier?" class="read-more" href="https://hipaks.com/labeler-uptime-clause-first-month-stoppage-ledger/" aria-label="Read more about Uptime Clause: Which Stops Count Against the Supplier?">Read more</a>

Nov 24, 2026 · 11 min read
Read guide
Labeling Machine Manufacturer Guides

Metal Detector False Rejects: Whose Filter, Whose Shield?

A metal detector false-reject on every drive ramp is three faults sharing one symptom, and the drawing able to separate the three is the interface drawing between the machines, not the labeler’s own electrical sheet. According to IEC 60204-1, the equipment covered begins at the point of connection of the supply and covers a group ... <a title="Metal Detector False Rejects: Whose Filter, Whose Shield?" class="read-more" href="https://hipaks.com/labeler-vfd-emi-metal-detector-checkweigher-interface/" aria-label="Read more about Metal Detector False Rejects: Whose Filter, Whose Shield?">Read more</a>

Nov 23, 2026 · 10 min read
Read guide

Not sure which machine fits your line?

Send the container and the target speed. HiPaks replies with machine options, an indicative price and a test-run plan on your own labels.

Get a Factory Quote Find Your Machine in 3 Steps
Back to top