An acceptance sampling plan for a labeler is a rule for deciding, from a counted sample of labelled bottles, whether the machine may be accepted, and the bottle count is the last item to fix rather than the first. Five parts carry the plan: the population, one bottle lot crossed with one label station and one speed; the defect classes with a written boundary; the sample size and acceptance number chosen against two stated risks; the moments at which each stratum is sampled; and the signatures that turn a result into a record.
Written in that order, the plan answers the question quality asks at handover. In the other order, a count borrowed from a blow-moulding plan answers nothing, because a moulding sample grades the bottle while a labeler sample grades the labelled output. The chain ends in a table for the contract schedule, with the count left where it belongs: agreed by both sides against their own risks.
Why Can One Bottle Not Release a Labeler?
One first bottle is a proof of function rather than a proof of acceptance, because a single unit cannot carry the variation the machine must hold. A first bottle at crawl speed shows that the dispense edge, the vacuum pad and the wipe work on that bottle at that speed, and nothing about a third station, a second cavity lot, or the rate the line will run in 2026.
First, one bottle has one identity: one cavity, one angular position at infeed, one label web. Second, crawl speed is not line speed, since entry impact into a wrap pad differs from the static contact of a jogged machine. According to the NIST/SEMATECH handbook, a lot acceptance sampling plan is a sampling scheme and a set of rules for making decisions, and the decision comes from counting defectives in a sample. A population of one has no count in it.
Define the Population Before You Choose a Sample
Why Does the Bottle Cavity Get Crossed With the Label Station?
A crossed sample separates a bottle-side error from a label-side error. Registration drift can begin in the bottle, through cavity diameter, ovality or seam position, or in the label, through die-cut, wind or adhesive, and the visible symptom is the same either way.
First, sample labelled bottles from two cavities at one station. Second, sample one cavity at two stations. Third, print cavity number and station on every sample, so a failing row names its own source. For example, misregistered neck labels from one cavity can be blamed on a head that is set correctly.
Which Three Strata Must Not Be Pooled?
A stratum is one bottle lot, one label lot, one recipe and one speed, and three must be reported separately even when the machine ran without a stop: bottle cavity, label station and line speed. An averaged figure can pass while one stratum fails, the classic acceptance error on a multi-head labeler.
First, cavity, because a worn insert or a cold gate repeats on every bottle from that cavity. Second, station, because a front head, a back head and a neck head each carry their own registration error. Third, speed, because registration held at the minimum qualified speed may not hold at the contracted maximum.
Step 1: Write the Reference Standard Before Counting
A reference standard is the written boundary turning a visible defect into a count, and a plan without one produces arguments rather than numbers. Four parts carry the boundary: the wording, a marked sample, the datum the defect is measured from, and the gauge with its viewing condition.
First, define each class in one sentence a second inspector can apply without asking. Second, keep a marked sample at the station, signed by both sides, since a photograph at an angle settles less than a bottle on a bench. Third, name the datum, because a registration error measured from nothing is unmeasurable. The machine class figure of a general ±0.5 mm, up to ±0.2 mm on the MT-807 and ±1 mm on a fully automatic unit excluding product and label variation, describes the machine and never replaces the buyer’s datum.
Step 2: Which Defects Count as Reject for Labelled Output?
Which Defects Are Critical?
Critical defects make the bottle wrong rather than untidy, and the acceptance number for this class is zero. Five belong here: a missing label, a wrong label, a wrong artwork revision, illegible variable data, and bottle damage caused by the machine.
The last surprises buyers who read a dent as cosmetic. A dent pressed in by a guide or a pad is a product defect the buyer’s customer will see, and the dent leaves the plant with the bottle. First, count it as critical. Second, stop the affected stratum rather than the whole run. Third, keep the damaged bottle as the marked sample.
Which Defects Are Major, and Which Are Minor?
Major defects put the label outside its stated limit while leaving a readable product on the bottle: registration outside the tolerance against its named datum, and angular error between the neck label and its parent label. Both need a datum before a count exists, so both rest on the reference standard.
Minor defects are appearance defects judged against that boundary: wrinkle, edge lift, bubble, scratch and adhesive ooze. A lifted trailing edge on an oval bottle is a known case with its own acceptance lines, held in the oval trailing edge and wrinkle lines; this plan counts the result against the agreed boundary.
Step 3: How Are the Sample Size and Acceptance Number Chosen?
A sample size n and an acceptance number c are negotiated numbers rather than defaults, and a single sampling plan accepts the lot when defectives in the sample sit at or below c. Producer risk and consumer risk are the Type I and Type II errors of that decision, according to NIST/SEMATECH, and typical values run from 20% down to 1%. The operating characteristic curve shows what a pair of numbers buys.
Three habits keep the numbers honest. First, write the lot size behind the sample. Second, name the standard the buyer QA already works from. Third, state both risks in the 2026 schedule. ISO 2859-1 may be named by title where buyer QA uses that family, with the edition and the inspection level, not a copied count. For example, the NIST page on choosing a plan from the AQL-indexed family reads as a table whose risk nobody can see, and Step 4 fixes the speeds the same strata are sampled at. Nothing here prints a sample size.
Step 4: Which Speeds and Moments Go in the Plan?
The plan names the speeds at which each stratum is sampled and the events triggering a fresh sample, because a labeler fails at the first bottle after a change more often than it drifts across a shift. Speeds are three: minimum qualified, nominal and maximum contracted, each sampled after the machine stabilises at that speed rather than during the ramp.
The moments are four. First, start-up, before the run is released. Second, after every changeover, including a format already run the day before. Third, after a label-roll splice, because a splice changes web tension at the peel. Fourth, after a fault recovery, since a restart after a jam most likely leaves a guide out of position. A semi-automatic unit runs at 15 to 30 pcs/min and a fully automatic unit at 40 to 300 pcs/min, so the two classes carry their own speed rows.

Step 5: What Happens When a Stratum Fails?
A failing stratum is contained and re-run, and the escalation rule is written before the run starts so the outcome does not depend on who stands at the machine. Three rules carry most handovers.
First, one critical defect stops that stratum: the machine is corrected, the stratum is re-run in full, and the failing count is never averaged into the rest of the run. Second, two consecutive failing strata escalate to full inspection of the run, a written corrective action with dates and a named owner, and the buyer’s QA holding the balance until the action closes. Third, the switch from normal to tightened inspection is moved by the buyer’s QA representative, with the switch point written into the plan.
A passed sample is not an accepted machine. Acceptance is every gate row signed and the remedy closed.
Step 6: Who Drafts, Who Signs, Which Revision?
What Do the Two Signatures Cover?
Two signatures cover two different acts. The plan is signed at issue: the buyer’s QA representative and the supplier’s quality owner sign the same revision, and that revision number is printed on the test record so every row traces back to the sentence that judged it. The buyer’s QA drafts, because the risk being accepted is the buyer’s risk, and the supplier confirms in writing before the factory acceptance test.
The record is signed at the gate: the raw counts, the sample identity with bottle lot, cavity, label lot, station and speed, and the marked samples. That identity joins a rejected row to the batch record, the join described in what a labelled bottle batch record proves. Who signs each qualification stage sits in the IQ, OQ and PQ question; this plan writes the sampling annex.
Why Are FAT and SAT Rows Separate?
A factory acceptance test row proves the machine at the supplier’s site, and a site acceptance test row proves the line at the buyer’s plant, so no row is satisfied by the other. A machine labelling the supplier’s bottles on the supplier’s conveyor has not labelled the buyer’s bottles with the buyer’s filler upstream.
First, mark every row FAT or SAT. Second, place the trial on the buyer’s own bottles in the FAT rows, since our trial labelling runs on the buyer’s stock with video returned. Third, keep the glue-weight question at first bottle in hot-melt first-bottle glue weight and pattern. Machines from our line run in more than 50 countries and at more than 500 factories.
The Plan as a Table the Buyer Can Paste
The table below is the schedule attachment, one row per stratum, and it carries no sample size of ours. Commercial terms stay as agreed at MOQ one unit, 30 percent deposit with 70 percent before shipment, FOB Shenzhen and one year warranty with lifetime support, and a request through the contact page brings the blank schedule.
Which Columns Belong in the Schedule?
| Stratum | n and c | What is measured | Accept and reject | Gate, signer |
|---|---|---|---|---|
| Front and back, cavity A, nominal | schedule, risks named | registration to datum, angular error, edge bond | zero critical, others at or below c | FAT, buyer QA and supplier |
| Neck, same lot, nominal | schedule | angular error to front label as parent, edge adhesion | zero critical, others at or below c | FAT, buyer QA and supplier |
| Both stations, maximum speed | schedule, stabilised | same measurements at maximum, recipe recorded | zero critical, others at or below c | FAT, buyer QA and supplier |
| Second cavity, both speeds | schedule, cavity recorded | cavity number on every sample, registration against A | zero critical, others at or below c | FAT, buyer QA and supplier |
| First bottle after changeover, splice or fault recovery | schedule, moment and code | presence, identity, registration, restored guide position | zero critical, others at or below c | SAT, line engineer and supplier |
Frequently Asked Questions
Does a Passed Sample Accept the Machine?
No. A passed sample proves the sampled strata met their rule, and the machine is accepted when every gate row is signed and the remedy is closed. Treating a good sample as acceptance gives away the rows nobody sampled, which on a three-label line means the neck station and every moment after a change.
How Many Bottles Go in a Labeler Acceptance Sample?
The count is agreed by both sides against stated risks rather than inherited, so the plan prints a rule and the schedule prints the number. The buyer’s QA standard and the lot size set both. A supplier offering a count with no risk statement is offering a habit.
Why Is a Bottle-Forming Sample Not Enough?
A bottle-forming sample grades a moulded bottle on forming defects such as a short shot, flash or a split neck, and the cavity is the unit because a worn insert repeats on every cycle. A labeler sample grades labelled output, and the bottle is one variation source beside the label and the machine.