A crate is rejected at the port when the wood packaging fails a test the purchase order never named, not when the labeler inside is faulty. ISPM 15 is the international phytosanitary standard for wood packaging material made from raw wood, and the obligation follows the wood rather than the machine or the voyage. Four questions decide the outcome at the dock: which wood components sit in the unit, whether the mark on the box is valid, whether the crate was repaired after marking, and whether the barrier inside kept the machine dry. Each symptom maps to one purchase-order line written before the crate is built; what travels inside sits on the nine items page. HiPaks ships labelers to 50+ countries and writes the packing clause at quotation.
Why Is the Mark on the Crate and the Crate Still Held?
Which Four Checks Prove the Mark Is Valid?
A valid wood packaging mark is a mark that passes four checks at the same time, and one failed check turns a compliant crate into a query. The mark carries the IPPC symbol, the two-letter country code of the producing country, the provider number issued by the national plant protection organisation, and the treatment code, HT for heat treatment or MB for methyl bromide. First, the mark sits on at least two opposite faces, which is 33% of a six-faced crate and the minimum rather than a target. Second, the mark is legible, not painted over or hidden behind a shipping label. Third, the provider number on the wood matches the treatment record the supplier keeps. Fourth, the crate number photographed at loading matches the packing list. For example, the fourth check fails when a forwarder retypes the packing list and the crate number changes. According to ISPM 15 (2018), the standard covers wood packaging and dunnage made from raw wood.
What Does the Mark Not Certify?
A wood mark is a phytosanitary statement written on the crate, and it covers the treatment of the wood alone. The mark does not certify the machine inside, the load rating of the skid, the seal on the barrier bag, the desiccant count, or the placement accuracy of the labeler after installation. In practice a distributor can accept a crate marked correctly on two opposite faces and still open a machine with rust on the frame, because the wood passed a pest test while the packaging failed a corrosion test. Three signatures sit behind one crate. First, the plant protection organisation signs for the treatment. Second, the packaging supplier signs for the build against a drawing. Third, the builder signs for the machine against the acceptance report.
Why Is a Plywood Crate Still Regulated?
Which Wood Components Put a Plywood Crate in Scope?
The scope of ISPM 15 is the raw wood in the packaging unit, and a panel made from processed wood does not change the scope of the crate. The standard applies to wood packaging material made from raw wood, dunnage included, and the 2018 text excludes packaging made from wood processed in a way that removes the pest risk, such as plywood, particle board, oriented strand board and veneer. A crate assembled from plywood panels with solid wood runners, cleats, corner posts, skids or blocking mixes both categories, and one solid wood runner puts 100% of the unit in scope. First, read the panel schedule. Second, list every solid wood component. Third, mark or replace each one. In practice the exemption belongs to the panel, not to the crate.
Can One Sentence Cover Mixed Material?
The purchase-order line for a mixed crate is a rule about the unit, not a specification of the panel. One sentence does the work: every solid wood component, including runners, cleats, corner posts, skids, blocking and dunnage, is either marked by an approved provider or replaced with a processed wood equivalent, and the treatment record travels with the packing list. That sentence closes the gap between a plywood quotation and a regulated crate. Ask for a component schedule that lists each solid wood item, the treatment and the face where the mark sits. According to ISPM 15, dunnage is inside the scope, so loose timber loaded beside the machine belongs on the same schedule.

Why Does a Dock Repair Void the Mark?
What Makes a Repaired Crate Non-Compliant?
A repair is a change to the unit after the mark was applied, and unmarked timber turns a marked crate into an unmarked one. The mark describes the unit as treated, so a board that the treatment record does not cover breaks the link between the wood and the paperwork. First, a forklift punched a panel and the dock fitted a new board. Second, a runner split during loading and a joiner screwed on unmarked timber. Third, a crate was opened for inspection and reclosed with a softwood batten. Each case leaves a mark on the box and unmarked wood inside the unit. At arrival the officer photographs the mark: the crate passes the visual test and the treatment record no longer matches the build.
What Should the Clause Say About Repair and Reuse?
The crate clause covers three moments: the first build, any repair in transit, and reuse on a second shipment. For the first build, the clause names the provider and the treatment code and requires the mark on two opposite faces before loading. For a repair, the clause forbids unmarked timber and requires the provider to re-mark the unit or fit a replacement panel already treated. For reuse, the clause requires an inspection of every solid wood component and a new mark where any component was replaced. In practice a used crate is the cheapest item on the dock and the most expensive to argue about, because the mark may belong to a shipment that closed in 2024. Packing terms belong beside price terms in any China sourcing comparison.
Why Does the Machine Arrive Wet Inside a Sound Crate?
Which Three Layers Keep Sea Air Off the Machine?
Corrosion control inside a crate is three layers working together, and a crate can pass every wood test with all three missing. The first layer is a vapour corrosion inhibitor, a VCI film or emitter that releases a protective vapour into the enclosed space. The second is a sealed barrier, a barrier bag or foil-faced liner closed around the machine with taped seams. The third is desiccant in a counted quantity, sized to the internal volume of the barrier rather than to the crate. In practice a barrier bag left open at one corner defeats the other two layers, and a count written as some bags cannot be checked at the dock. According to ISPM 15, the wood treatment protects against pests, and has nothing to say about humidity, condensation or a steel frame crossing a cold ocean.
How Is Desiccant Written as a Number?
A desiccant requirement becomes enforceable when the purchase order states a quantity and the volume it protects. Write three figures: the number of desiccant units, the internal volume of the sealed barrier in cubic metres, and the date the barrier is closed. A line reading some desiccant in every crate cannot be inspected, accepted or disputed. In practice the packing instruction should also name who counts the units and where the count is recorded, because the count is the only barrier evidence a receiver can verify without opening the bag. Tie the count to the crate number on the packing list, then photograph the units and the barrier seam before the crate closes.
Why Did the Machine Move on the Skid?
What Holds an Automatic Labeler on Its Skid?
An automatic labeler stays on its skid when three conditions hold: the skid is rated for the gross weight, the base frame is bolted through the skid, and the machine is blocked in three axes. First, the skid carries a load rating at or above the gross weight of the machine plus its crating, and the rating is printed on the skid rather than assumed from the timber size. Second, the machine is fixed with through bolts into the base frame, at the points the builder uses for lifting, not with straps around the cabinet. Third, blocking resists movement forward, sideways and vertically, because a container can be braked hard and a ship can roll. In practice movement shows up as a sheared bolt, a bent guard or a frame that no longer sits level on the floor.
How Do Dimensions Get Written Before the Build?
External dimensions and gross weight belong in the purchase order before the crate is built, because the crate fixes both figures rather than the machine. Write the crate length, width and height in millimetres, the gross weight in kilograms, the centre of gravity, and the forklift pocket or lifting point positions. Then compare the figures against the container door opening and the dock height, not against the internal volume. A crate that fits inside a 40-foot container can still fail a door frame 30 millimetres lower than the crate. Ask the builder for a dimensioned drawing at order stage, check it against the route, and keep the approved drawing with the packing list.
Which Lines Belong in the Crate Clause?
Which Seven Lines Belong in the Clause?
The clause is seven lines, and each answers one symptom at the dock. One sentence reads: every solid wood component is marked or replaced, and the treatment record travels with the packing list.
| Symptom at arrival | Purchase-order line | Proof the buyer holds |
|---|---|---|
| Mark on one face only. | Mark two opposite faces before loading. | Mark photographs, crate number. |
| Solid wood in a plywood crate. | Component schedule by material. | Schedule and treatment record. |
| Repair with unmarked timber. | No unmarked timber, repair re-marked. | Repair note and mark photo. |
| Rust on the frame. | VCI film, sealed barrier, counted desiccant. | Packing instruction with count. |
| Machine shifted on the skid. | Skid rated, base bolted, three-axis blocking. | Blocking drawing and bolt list. |
| Crate will not fit the door. | Dimensions and weight approved before build. | Dimensioned crate drawing. |
| Nothing to check at arrival. | Mark photos, crate number on the list. | Photo set under one number. |
What Has to Be Photographed Before the Doors Close?
A crate file is a set of photographs and records that prove what the crate contained before the doors closed. Four photographs do the work. 1. The mark on both opposite faces, with the crate number in the same frame. 2. The machine bolted to the skid, with blocking visible on three sides. 3. The barrier seam and the desiccant units before the bag closes. 4. The closed crate and the load secured inside the container. Keep the set under one crate number with the treatment record and the packing list. In practice the photograph of a closed crate proves nothing about the checks inside. HiPaks runs the buyer’s own bottles before crating and photographs the mark and the skid on every automatic build, and the same visit produces the factory acceptance test record.
Questions Distributors Ask About a Crate Held at the Port
Who is responsible when a crate is held?
A hold splits along two records. The exporter or the packaging provider holds the treatment record and the mark, so a missing or invalid mark is a supplier question. The importer holds the entry file and the destination rules, so a restricted treatment code is a buyer question. Name one contact for each record in the purchase order.
Does a plywood crate need a mark?
A plywood crate is a mixed unit as soon as one solid wood component joins the panels. The panels themselves sit outside the standard as processed wood, and the runners, cleats, corner posts, skids, blocking and dunnage do not. The mark covers each solid wood component in the unit. A crate built only from processed wood carries no wood mark, and a mixed crate carries a mark for its solid wood part.
Which treatment code should the crate carry?
The mark records HT for heat treatment or MB for methyl bromide, and the destination decides which is accepted. Which codes a market allows, and whether a certificate must travel with the mark, is a question for the importer and the destination plant protection organisation. Ask before the crate is built and write the answer into the clause.