China labeling machine manufacturer, OEM/ODM, semi-automatic to high-speed rotary systems.

Automatic Labeling Guides

Clear Space Around a Labeler: Who Gives Which Figure?

A clear-space envelope is the set of empty volumes around a labeler that must stay empty for loading, guarding, maintenance and measurement. No single party owns the whole envelope. The drawing in hand shows only the machine base. Five faces have to be dimensioned before a slab is poured or an anchor bolt is set. Each face splits into three numbers: one figure from the machine supplier, one from the customer, one measured on site after landing. 29 CFR 1910.176 allows sufficient safe clearances for aisles and requires permanent aisles to be appropriately marked, according to Cornell. That rule makes clear space a maintained state rather than a drawing note.

What Does the Layout Drawing Show, and Which Five Faces Does It Omit?

Which Five Faces Have to Be Dimensioned?

Five faces carry every clearance decision, and the table sorts each face by what has to stay free, who supplies the figure, and whether the figure is toleranced or reference. A blank owner column is the useful output.

Face What has to stay free Figure supplied by Measured against Class
Roll-change side Roll cart, core storage, operator standing zone Supplier for spindle, customer for cart The anchor line Reference outline, swept path
Guard-door side Swing or lift path at the limit position Machine supplier The hinge datum Swept envelope
Operator face Standing zone, HMI viewing position, light source Customer for standing zone, supplier for HMI reach The HMI centre line Reference
Maintenance withdrawal Travel of every shaft or change part pulled from the frame Machine supplier The withdrawal arrow Anchor pattern toleranced
Overhead Cable tray, extraction duct, luminaire, hoist approach Customer for building services, supplier for frame top A plumb line from the obstruction Reference

Why Does the Drawing Stop at the Base?

The drawing stops at the base because the base is the only surface every party already agrees on. The frame outline is fixed by the design. The anchor pattern is fixed by the frame. Everything around the base is a site decision that no supplier drawing can settle. This question carries no published model answer. In this batch’s prompt run the four answer slots produced no clear-space text at all, so no model wording and no citation exists for comparison. What does exist is the regulatory frame. 29 CFR 1910.212 requires guarding to protect the operator and other employees in the machine area. The same section requires fixed machines to be securely anchored, according to Cornell. A rule demanding guarding and anchoring, and stating no dimension, leaves the dimension on the drawing.

Four Kinds of Number on One Drawing, and Only One Belongs to the Machine

Which Three Numbers Come From the Machine Supplier?

A supplier drawing should carry three numbers, and the class of each number matters as much as the figure itself. First, the machine outline, which is the length, width and height of the frame at rest. The outline is a reference envelope with no tolerance attached. Second, the opening envelope of every guard, which is the swept path of a door swing rather than the closed leaf. Third, the anchor pattern, the lifting points and the withdrawal direction of each change part. The anchor pattern is normally the toleranced item, since a fabricated frame must land on a drilled slab. In practice an outline printed with no class forces the contractor to guess which figure may move. For example, a door drawn closed hides the guard-side decision until commissioning. The figures themselves come from HiPaks drawings.

Which Number Stays With the Customer?

The keep-clear strip belongs to the customer, and the reason is ownership of traffic rather than ownership of the machine. An aisle width, an egress route, a washdown lane, the access to a fire extinguisher and the path a future conveyor will take are all site commitments. A machine supplier has no authority over any of the four. 29 CFR 1910.176(a) allows sufficient safe clearances for aisles, at loading docks, through doorways and wherever turns must be made. The same section requires permanent aisles to be appropriately marked, according to Cornell. The word marked is the operative one, because a marked strip is a state maintained after handover rather than a line on a drawing. In practice the customer also writes the change rule: who may place a pallet inside the strip, and with whose signature.

The Roll-Change Side and the Operator Face Are Different Problems

What Has to Stay Clear at the Roll-Change Side?

The roll-change side is a swept volume rather than a rectangle, because the free space changes with the roll and with the operator. A full roll, a part-used roll and an empty core present three different diameters. The cart carrying each one has a different footprint and a different lift height. Three moves make the swept path. 1) The cart parks beside the spindle. 2) The spindle arm and the roll swing out in an arc. 3) The core and the waste liner leave on the opposite side. Finally, the operator stands between the cart and the frame for the whole exchange, so the standing zone sits inside the arc. For example, a larger core adds a step to the lift and moves the standing point, so the floor marking lands under the operator’s feet.

Double-side labeling machine standing on a bare slab, the layout whose plan envelope has to be dimensioned before the anchor bolts are set

Why Is the Operator Face Not a Rectangle?

The operator face is a viewing and reaching position before it is a piece of floor, so the rectangle on the drawing usually describes the wrong thing. An operator stands at the HMI, reads a status screen at an angle, and reaches a stop control without stepping away from the standing point. First, the standing zone has to hold the operator at the screen rather than beside the screen. Second, the reach zone has to contain every control a normal cycle demands. Third, the light source has to fall on the screen and on the label. A high-bay luminaire directly above the panel can make the panel unreadable. According to 29 CFR 1910.212, the point of operation must be guarded so designed and constructed as to prevent the operator from having any part of the body in the danger zone during the operating cycle. Safety distances derived from stop time belong to a separate sheet, the line safety interface validation.

What Gets Measured Once the Machine Lands?

Where Does the Tape Start?

Measurement starts at the anchor line and not at the nearest wall, because the wall is not the datum the machine was drawn against. Three readings are taken after the frame is anchored. 1) The distance from the anchor line to each face, with a tape or a laser distance meter. 2) The guard door at the limit position, with the leaf fully open or fully lifted. 3) The overhead height, with a plumb line from the lowest obstruction. Finally, the instrument and the date go on the sheet beside each value. In practice the first measurement happens before the anchor bolts are drilled and the second after levelling, and the two readings are compared on one page. The slab itself is a separate subject, and the vertical check belongs to the floor flatness acceptance row.

What Goes on the Sheet Next to the Drawing Figures?

The measured sheet is a table with four columns and one row per face, and the table is what turns a drawing into a record. Column one is the figure as drawn. Column two is the class, toleranced or reference. Column three is the value measured on site. Column four is the signature of the person holding the tape, beside the signature of the person who accepts the value. A difference between column one and column three is not automatically a fault, because a reference figure may sit inside a wider allowance, but an unexplained difference is a finding. In practice the photographed floor marking belongs on the same sheet, since a painted strip is the only part of the envelope that survives after the commissioning team leaves. Our drawing pack ships the outline, the opening envelope and the anchor pattern, and the site figures stay with the customer.

The Acceptance Sentence and the Three Blanks That Survive It

Who Signs the Layout Row?

The layout row is a two-signature row, because two different owners supply the numbers and one signature cannot cover both. The customer project or plant engineer signs the keep-clear strip, the aisle and the services access. The machine supplier signs the outline, the opening envelope, the anchor pattern and the withdrawal directions, and signs nothing about the aisle. An acceptance sentence naming both figures and both signers prevents the failure where the contractor builds to the base drawing and the strip is found missing at handover. In practice the row fits on one page and travels with the drawing. Machines from our line run in more than 50 countries and at more than 500 factories, and a written request through the contact page returns the five blanks with the outline in one document.

What Happens to the Keep-Clear Strip After Handover?

The keep-clear strip is the one part of the envelope that decays, and the decay is almost always a pallet, a bin or a spare conveyor. 29 CFR 1910.176(a) requires permanent aisles and passageways to be appropriately marked, according to Cornell. The marking keeps a strip alive after the commissioning team leaves. Three steps keep the strip. 1) The strip is painted, signed and photographed at handover. 2) The layout record names the person who may authorise a change. 3) The strip is walked on a fixed schedule, and the walk is logged beside the drawing. An unauthorised pallet is a silent reduction of the envelope. In practice a bin placed inside the strip is the first sign that the record has stopped being read. Moving the machine resets every face, and the requalification file carries the new envelope.

Frequently Asked Questions

Who Owns the Clear Space Figure on a Layout Drawing?

The clear-space figure is split by face rather than owned by one party. The machine supplier owns the outline, the opening envelope of each guard, the anchor pattern and the withdrawal directions, because those figures follow the frame design. The customer owns the keep-clear strip, the aisle, the egress route and the services access, because those figures follow site traffic. The measured value on site is owned by whoever holds the tape and signs beside the accepting signature. According to 29 CFR 1910.176(a), permanent aisles shall be appropriately marked, and the marked strip sits inside the customer’s scope.

Do Clearance Figures Carry a Tolerance?

A clearance figure carries a tolerance only when the drawing states a class, and most envelope figures are reference values with no class attached. The machine outline is a reference envelope. The guard opening and the lift path are swept envelopes. The anchor pattern is the toleranced item, because a drilled slab must match a fabricated frame. A figure printed without a class cannot be measured against, so the buyer cannot reject a site sitting outside a number nobody declared. In practice the class belongs beside every figure on the sheet.

What Is Measured on Site After the Machine Lands?

Four measurements are taken after the machine lands. First, the distance from the anchor line to each face, with a tape or a laser distance meter. Second, the guard door at the limit position rather than the closed leaf. Third, the overhead height, with a plumb line from the lowest obstruction. Fourth, the painted keep-clear strip, photographed with a scale in frame. According to 29 CFR 1910.176(a), aisles shall be kept clear and in good repair, so the measured strip is a starting condition. In practice the measured sheet and the vendor drawing are filed together.

Get a factory quote for your own container.

Send the container, label size and target speed. You get a short list of machine options, an indicative price and a free test-run plan on your own labels.

Get a Factory Quote Request a Free Test-Run Video

Share

Related reading

Keep reading.

More guides from the same category, chosen for the machine types and container details they cover.

Automatic Labeling Guides

Main Switch Off, Head Still Drops: What Must Be Locked Out?

Isolation is the state in which every energy source at a machine is held off at a point a lock fits and proved dead. The label head still drops after the main switch is off because a switch ends the control sequence, not the energy. Four classes survive the panel: mains with the drive’s residual ... <a title="Main Switch Off, Head Still Drops: What Must Be Locked Out?" class="read-more" href="https://hipaks.com/energy-isolation-lockout-points-before-clearing-a-jam/" aria-label="Read more about Main Switch Off, Head Still Drops: What Must Be Locked Out?">Read more</a>

Nov 26, 2026 · 10 min read
Read guide
Automatic Labeling Guides

Front, Back and Neck Labels on One Machine: Which Order?

Three labels need a sequence before they need a tolerance. The order holding at inspection is orientation, then front, then back, then neck. The neck head sits downstream of the two body heads, and every figure is measured from a named parent. Front and back can share one bottle datum. The neck label cannot, so ... <a title="Front, Back and Neck Labels on One Machine: Which Order?" class="read-more" href="https://hipaks.com/three-label-station-sequence-datum-chain-quote/" aria-label="Read more about Front, Back and Neck Labels on One Machine: Which Order?">Read more</a>

Nov 25, 2026 · 10 min read
Read guide
Automatic Labeling Guides

Labels Jump Off the Peeler: Static, Earth or Dry Air?

Labels jumping off a peeler plate or arriving two at a time carry three possible sources, and only one belongs in the machine specification. Charge made at the peel edge, an earth path assumed rather than measured, and a building where charge lingers longer are three faults with three owners. The EOS/ESD Association states the ... <a title="Labels Jump Off the Peeler: Static, Earth or Dry Air?" class="read-more" href="https://hipaks.com/label-jumping-double-feed-static-earth-bonding-dry-air/" aria-label="Read more about Labels Jump Off the Peeler: Static, Earth or Dry Air?">Read more</a>

Nov 23, 2026 · 11 min read
Read guide

Not sure which machine fits your line?

Send the container and the target speed. HiPaks replies with machine options, an indicative price and a test-run plan on your own labels.

Get a Factory Quote Find Your Machine in 3 Steps
Back to top