The short answer. Integration runs in five steps, and the order matters more than the effort. First, survey the conveyor you already own: height, direction, spacing, speed stability and the space above the belt. Second, fix the mounting datum, meaning the bracket, column or gantry and the adjustment range it must cover. Third, settle the trigger and the I/O handshake so the head knows when a product is present and how fast it is moving. Fourth, confirm utilities, guarding and the electrical enclosure. Fifth, commission against a measured acceptance test rather than against an impression. Stations that fail usually fail at step one or step three, and the failure surfaces in step five, which is why the checklist is written in this order.
Step 1: survey the conveyor you already own
The head is built to numbers taken from your line. If those numbers are approximate, the bracket is approximate, and the adjustment range is spent correcting a measurement rather than absorbing normal variation. Take the survey with the line stopped and again while it runs.
What to measure
| Measurement | How to take it | Why the head needs it |
|---|---|---|
| Belt top height from floor | Tape from floor to the belt surface at the intended station, not to the frame rail | Sets the column length and the bracket interface |
| Direction of travel | Stand at the infeed and note left to right or right to left | Sets head orientation and which side the web runs on |
| Product spacing | Measure leading edge to leading edge over twenty products, note the minimum and maximum | Decides whether the method can keep up and where the sensor can sit |
| Belt speed and stability | Time a product over a marked metre, three times, and watch for surge at start | Decides encoder versus timed delay for the trigger |
| Space above and beside the belt | Clear height to any structure, and free width on the operator side | Decides column or gantry, and whether a roll change is possible |
| Product presentation | Photo from the head position with a ruler in frame | Confirms the face the label lands on and its angle |
What to watch for ten minutes
Numbers describe the average; watching describes the exceptions. Count the gaps between products for ten minutes and note the shortest and longest. Watch what happens after a jam clears, because a slug of products released together is the event that produces two labels on one carton. Watch the belt at shift start, when a cold conveyor often runs faster for the first minute. If spacing varies by more than one product length, the honest finding is that the line needs a spacing screw or a metering belt before it needs a labelling head, and that is a step one conversation.
HiPaks asks for exactly these inputs before a bracket is drawn, and the longer version of the survey is in the line retrofit guide.
Step 2: fix the mounting datum before anyone drills
A head that moves between shifts cannot hold a tolerance. The mounting has to define one datum and hold it while the line vibrates, which is a stiffness question rather than a weight question.
Bracket, column or gantry
Three arrangements cover almost every retrofit. A bracket clamps to the conveyor frame when the frame is rigid and the head sits close to the belt. A column stands on the floor when the frame is light or when the head needs to be raised above an existing guard. A gantry spans the line when neither the frame nor the floor beside it can be used, which is common on lines where the conveyor is boxed in by other equipment. HiPaks builds the T953 as a gantry head for exactly that case: it labels top faces and arc surfaces without touching the conveyor structure.
Build in adjustment, then lock it
The head needs height adjustment to meet the product and angle adjustment to match the face. That range is for setup, not for production. Once the position is set against a test product, lock it and mark the setting, because the most common cause of a placement drift that appears in week three is a bracket that was left finger tight after a changeover.
Leave service access too. A label roll change happens several times a shift, and a head mounted with 80 mm of clearance above the unwind will be run with a partially loaded roll by the end of the first week, because the operator cannot reach it comfortably.
Step 3: settle the trigger and the I/O handshake
This is where a two day commissioning becomes a two week one. The head needs three answers: a product is present, where its leading edge is, and how fast it is moving.
Product-present sensing
A photoelectric sensor looking across the belt is the usual choice, and it needs a clear line of sight that survives guards, cables and a change of product colour. A dark carton on a dark belt is the classic failure: the sensor sees nothing, the head never fires, and the operator concludes the head is broken. Test the sensor on the darkest and lightest product you run before the head is mounted.
Speed reference: encoder or timed delay
A fixed delay between the sensor edge and the application works only at one belt speed. If your line runs at a single speed all day, a timed delay is simple and adequate. If the line ramps, or if the same head serves two conveyors at different speeds, take an encoder signal and let the head track position rather than time. The decision belongs in the purchase order, because it changes the wiring and the parameter set.
Reject and stop logic
Write down three behaviours before installation: what the head does when the web breaks, whether the head stops the conveyor or the conveyor stops the head, and how a missed label is flagged. A head that quietly keeps firing after a web break fills the reject bin with unlabelled product, and nobody notices until the case packer does. HiPaks ships an I/O list and an integration drawing with each module so your controls team can wire the handshake without guessing at signal names.
Step 4: confirm utilities, guarding and the enclosure
Power and air
Confirm voltage and frequency at the point of use rather than at the building entrance, and confirm the air supply if the method uses air. Tamp-blow and air-blow need dry air at a stable pressure; condensate in the line shows up as a label that stalls a few millimetres above the surface, and the operator will describe it as the machine being unreliable. Fit a filter and regulator at the station, and note the consumption so the compressor sizing is not a guess.
Guarding the transfer point
Adding a head to a conveyor creates a new nip point wherever the web runs beside a moving product, and a new crush point wherever a tamp pad travels. The risk assessment for the line has to be updated, not just the drawing. In practice that means a fixed guard over the web path, an interlocked guard or a light curtain where the operator loads, and a stop circuit that actually removes power from the head’s drive rather than only pausing the sequence.
Listing the assembly
In North America, the electrical enclosure and the assembly around it are often expected to carry a listing from a recognised testing organisation. CSA Group’s machinery equipment programme is one route, and the practical question is who owns that work: the head supplier, the integrator or the plant. Settle it in the contract, because a field evaluation after installation costs more than a listed panel before it. HiPaks supplies the head as a documented module and states its certification position as ISO 9001 and CE in progress rather than issued, so an integrator building for a regulated market knows exactly what they still have to do.

Step 5: commission against a measured acceptance test
Commissioning is not “it runs”. It is a set of measurements taken in front of the buyer, written down, and compared with the numbers in the quotation.
The thirty-minute run
Run continuously for thirty minutes at production rate with the real product and the real label stock. Count the output, count the rejects, and stop at the end rather than between runs. Thirty minutes is long enough for a roll splice, a jam and a sensor double-trigger to appear, and short enough that nobody is tempted to skip it.
Placement at three points
Check the label position on the first, twentieth and fortieth unit at the same setting, measured against the same reference edge. Drift across a run is a mounting or a web tension problem, and it is far cheaper to find on the day the engineer is present than three weeks later. The head platforms are quoted at ±1 mm excluding deviation from the product and the label, so measure the label against the product, not against the artwork.
Changeover, timed
Ask the technician to change over to the second SKU while you time it, then run twenty units. A changeover that takes four minutes in the quotation and eleven minutes in front of you will take eleven minutes in your plant. Record the settings for each SKU, with photographs of the scale positions, so the next changeover is a recall rather than a rediscovery.
Handover pack
Before the engineer leaves, collect the drawings, the I/O list, the parameter set, the spare parts list with brands, the guard specification and the contact route for technical support. HiPaks provides one year on the machine plus lifetime technical support with wear parts excluded, and support is easier to use when the serial number and the parameter file are already in your maintenance system.
The one-page integration sheet
Fill this in before the purchase order and attach it to the drawing. It is deliberately short, because a sheet nobody fills in protects nobody.
| Item | Value to record |
|---|---|
| Belt height and direction | mm from floor to belt top; travel left or right |
| Product range | Smallest and largest footprint, height, weight |
| Spacing | Minimum and maximum gap measured over twenty products |
| Label and liner | Length 6 to 300 mm, liner 25 to 125 mm, 76 mm core, roll outer diameter to 280 mm on T95x heads |
| Method | Wipe-on, tamp, tamp-blow, air-blow or corner-wrap, with the reason |
| Trigger | Sensor type and position, encoder or timed delay |
| Utilities | Voltage, frequency, air pressure and consumption |
| Guarding | Guard type, interlock, stop category |
| Acceptance | Rate, placement tolerance and reject definition |
| Documents | Drawings, I/O list, parts list, declaration status |
Four things that delay commissioning
These account for most of the schedule slippage on retrofit projects, and each is preventable at step one or three.
- A bracket built to a guessed height. The head arrives 30 mm off and the adjustment range is consumed before the first product runs.
- A sensor that cannot see the product. Dark cartons, glossy film and a guard bracket in the sight line all produce a head that never fires.
- A missing air drop. The method needs air, the station has no regulated supply, and the install waits for a contractor.
- No agreed reject definition. The machine labels correctly, the buyer counts differently, and acceptance becomes a negotiation rather than a measurement.
The pattern is consistent: the technical work is rarely the problem, and the unmeasured inputs are. A retrofit that starts with a filled-in integration sheet usually finishes on the day it was planned for.
FAQ
How long does it take to integrate a labeling head into an existing line?
Plan one day for mounting and wiring and one day for commissioning, assuming the five survey inputs are correct and the PLC handshake was agreed in advance. If the bracket has to be modified on site, add a week for fabrication and another visit.
Can the head use my existing PLC?
Yes. The head expects a product-present signal and returns status, and HiPaks ships an I/O list and integration drawing so your controls team can map the signals without reverse engineering. Decide which controller owns the cycle before the order.
Do I need to change my conveyor?
Only if it cannot hold speed or spacing. A head applies on the transport you already have, but it cannot correct a belt that surges or products that arrive in clumps. Fix the transport first, or the head will be blamed for it.
What speed can I expect after integration?
The lower of the head’s rating and what your spacing allows. The T951 is rated 40 to 120 pcs/min and the T952 and T953 run 40 to 150 pcs/min on stepper drive or 50 to 200 pcs/min on servo. Confirm the real number in the acceptance run rather than on the specification sheet.
If the survey sheet is half empty, send what you have and mark the gaps. The bracket is drawn from those numbers, and it is the one part of the project that cannot be adjusted after the fact.
Start from the applicator head range for the module specifications, the applicator machine range if the line needs its own transport, and support for the documentation that ships with each unit. More integration notes sit under label applicator guides, and the acceptance criteria are set out in the factory acceptance test process.