Arrival damage is three claims, not one. A bent guard rail and a cracked HMI screen start a carrier cargo claim, a cargo insurance claim and a factory claim in the same hour. Each route carries its own definition of filed, its own clock and its own evidence set. The first hour is a photography job, not an unpacking job. Under 49 CFR 370.3(c), a damage note on a delivery receipt is not a claim, so a buyer who stops at the notation has filed nothing. This article separates the three routes and names the single action that ends all of them.
The First Hour: Photograph the Crate, Before the Damage
Which of the Three Claim Routes Does Each Photo Serve?
One photo set feeds three filings, and the table below shows what each route takes from the same evidence.
| Route question | Carrier cargo claim | Cargo insurance claim | Factory claim |
|---|---|---|---|
| What starts it | A written claim identifying the shipment, asserting liability and stating an amount | Written notice under the policy condition | Written notice of a packing or defect dispute |
| Who files it | The party named on the bill of lading | The insured party, or the insurer after payment | The buyer, against the packing obligation |
| What proves it | Identification, an assertion of liability, a determinable sum | Insured value, cause and extent at receipt | Deviation from the agreed packing specification |
| What the photos must add | Crate faces, seal, label, interior blocking | Cause and extent, plus the storage path after receipt | Nameplate, packing method, as-packed condition |
| What the clock runs on | The bill of lading and the carrier tariff | The policy notice condition | The sale contract claim terms |
| What defeats it | A clean receipt, or a notation treated as the filing | Late notice, or unpacking before the inspection | No as-packed record, or packing that met the specification |
| What it pays for | The loss as the carriage contract measures it | The insured value on the policy schedule | Repair, parts, or a share of re-packing as the sale contract states |
In What Order Does the First Hour Run?
An arrival record is a fixed sequence, and the sequence protects the evidence rather than the machine. The order runs from fixed to specific, and the first frame is never the damage close-up. 1. Crate as received: all faces, the corner that took the impact, the banding, the seal and the label, with the pallet still on the jack. 2. Opened crate before anything is lifted out, with the blocking pattern still in place. 3. Each damaged item with a tape measure across the bend and the nameplate in the same frame. 4. The delivery receipt, written in specific words, with the crate and all packing kept. For example, a photo taken after the lid is lifted no longer shows what the lid was holding, and the carrier reads the gap as handling damage by the receiver.
A Damage Note on the Delivery Receipt Is Not a Claim
What Does 49 CFR 370.3 Require Before a Filing Counts?
A cargo claim is a written communication, and 49 CFR 370.3(b) fixes the minimum content for one filed against a US motor carrier. According to Title 49 CFR 370.3, the writing must contain facts sufficient to identify the shipment, must assert carrier liability, and must claim a specified or determinable amount of money. Paragraph (c) removes the shortcut: bad order reports, appraisal reports of damage, and notations of shortage or damage on freight bills, delivery receipts or other documents, standing alone, are not sufficient. The regulation governs US domestic road carriage, so a sea leg or an air leg answers to a different regime, and the forwarder names which one applies. For example, a receipt reading “HMI cracked, subject to inspection” identifies a problem and claims no money, so the carrier claim stays unfiled.
Why Does Every Photography Protocol Stop at the Notation?
A photography protocol is a claims-vendor checklist, and the published checklists end with a written notation on the delivery receipt. The protocols are right about the frames and wrong about the filing. A notation is evidence, not a demand: 49 CFR 370.3(c) treats a receipt notation as insufficient standing alone, and a policy condition asks for notice in writing rather than for a driver signature. The two artifacts look alike on a dock, which is why the mistake survives. In practice the receiving clerk has one pen and one minute, so the notation gets written and the letter with the amount never does. Photograph the signed receipt as well, because the notation is still worth having. Standing alone, the notation records that the buyer saw the damage at receipt and demanded no money. Send three filings on the same day.
Risk Passing and the Right to Claim Are Two Clocks, Not One
When Does Risk Pass, and Who Names the Place?
Risk transfer is a contract term, and the crate has no vote in when the transfer happens. According to the International Chamber of Commerce, Incoterms are eleven three-letter trade terms that clarify the tasks, costs and risks involved in the delivery of goods from sellers to buyers, and the 2020 edition entered into force on 1 January 2020 and remains the edition in force in 2026. The ICC page sets the framework and names no risk point for any single term, because the named term and the named place in the buyer’s contract do that work. HiPaks quotes are FOB Shenzhen, so the named place in the buyer’s term is the port of shipment. Under the standard 30% deposit and 70% before shipment, the balance is paid while the crate is still the seller’s risk, and after loading the cargo risk is the buyer’s cargo risk.
What Runs Each of the Three Clocks?
Three clocks run at once, and the buyer who asks for one number is asking for a number no party owns. The carrier clock runs on the bill of lading and the carrier’s tariff, and the figure sits in a document the buyer already holds. The insurance clock runs on the policy’s notice condition, and the figure sits in the policy schedule. The factory clock runs on the contract of sale and on the packing obligation written into the contract. No day count from a web page belongs in the claim file, including this page: read the three documents and write the dates into one sheet. The first hour produces one written claim per route, each in the form the route requires, and one shared log of when each was sent. A claim late on one route can be on time on another, and the log is what shows the difference.
Five Frames Only a Labeling Machine Needs
Which Five Frames Decide Repair or Write-Off?
Freight-generic photos document a box, and a labeling machine needs five frames that decide repair or write-off. 1. The guard rail at the bend: a bend in the tube is a straightening job, while a bend at the weld or a mounting plate displaced on the frame is a frame job. 2. The HMI bezel and gasket: cracked glass with a distorted bezel means the cabinet took a load, not only the screen. 3. The applicator head and the position the head was parked in: a head displaced on the rail moves placement past the ±0.5 mm band of a semi-automatic machine. 4. The nameplate, with serial and model legible. 5. The crate corner, the blocking and the seal number. The crate contents are listed in the crate packing list, and the route that put the crate on the dock is covered in the door and lift survey.

Why Does Powering Up End All Three Routes?
Energizing a damaged machine is the one action that converts a transit claim into the receiver’s own loss. Impact damage leaves a path: a bent bracket, a shifted head, a distorted cabinet, a pinched harness. Power applied along the same path produces a second failure, and the second failure is priced as the buyer’s consequential loss, because the buyer caused the second failure. Power also overwrites the mechanical evidence, since a stalled motor, a blown drive or a burned contactor replaces the physical story with an electrical one. Every photography protocol says do not repair and do not dispose of the goods; none says do not switch on, and a receiving team switches on first. Write the prohibition into the receiving sheet before the crate is opened: no power, no air, no test run, until the inspection is recorded.
Which Route Pays for What, and What Do Buyers Ask?
A claim file is a handover pack, and the party who files is often not the party who took the photos. Three conditions make one photo set usable by a stranger. 1. Every frame ties to the shipment: label, seal number and bill of lading number in the same picture. 2. Every frame carries a timestamp and a filename that sorts, for example 2026-11-20_crate-face-01. 3. The set travels with a one-page index naming the damaged parts, the serial number and the witness. An insurer may file under subrogation after paying the buyer, and a factory may file against a forwarder, so the set must survive a change of owner. Keep the original files rather than the copies sent by chat, and keep the crate until the inspection is closed.
Where Does the Factory Claim Point, and Where Does It Stop?
A factory claim is a contract claim about packing adequacy or a machine defect, and transit photos do not settle the factory claim. The factory answers three questions the other routes cannot: what the crate was specified to withstand, what the machine was tested to before packing, and what the packing method was meant to do. HiPaks test-labels the buyer’s own bottles before shipment and returns the video, which gives the buyer a dated baseline of the machine running on the buyer’s bottle and label. That baseline is the strongest single item in a factory claim, because a machine recorded running on the buyer’s bottle at the factory is hard to call defective. Warranty exclusions and the evidence a warranty claim needs sit in the warranty evidence file. Request a free test-run video at the labeling test video library before the order ships.
Is a Damage Note on the Delivery Receipt Enough?
A damage note is a record, not a claim. The note preserves the condition as found and gives the carrier written notice at the dock, and 49 CFR 370.3(c) still treats a note as insufficient standing alone. The claim is a separate letter with an amount in it.
Who Files First: Carrier, Insurer or Factory?
All three start on the same day, because no route waits for another. The carrier and insurer filings run on their own documents, and the factory claim runs on the contract. Waiting for one route to answer before starting the next is how a clock runs out unread.
Can the Machine Be Unpacked Before the Inspection?
Unpacking is fine once the crate’s faces and the opened interior are photographed, and power is not fine. Keep the packing, keep the crate, and let the inspection see the as-found condition. A machine that was switched on cannot be inspected as found.
Do the Three Routes Share One Photo Set?
One set serves all three routes, with different emphasis. The carrier route needs the crate, the seal and the interior blocking. The insurer needs cause and extent. The factory needs the nameplate, the packing method and the pre-shipment test record.
Send the crate photos, the waybill and the serial number to the factory before the file is closed: Get a Factory Quote and ask for the packing specification written for your machine and your route.