China labeling machine manufacturer, OEM/ODM, semi-automatic to high-speed rotary systems.

Labeling Machine Manufacturer Guides

English Manual, Spanish Operators: Who Translates What?

Two duties arrive on the same invoice, and they are not the same document. The manual is a statutory item that the law of the market describes. Screen text is a delivery item that the purchase order describes.

The cited compliance pages settle the manual. Instructions must be marked either Original instructions or Translation of the original instructions, and a translation travels with the original. Section 1.7.1, according to the guidance, also covers information given on a monitor screen, and any further language becomes a matter to be settled by contract when the machinery is ordered.

So the screen language is a clause and not an inheritance. A 2026 order names the artefacts, fixes an identifier and a revision on each, tests every alarm and prompt in that language, and writes a pass into the payment condition.

Which Six Failures Show Up After Delivery?

A language failure is a machine that runs correctly and still cannot be signed off, and six cases account for most of the first year of operation.

  1. An operator presses Reset on an English prompt during a stop, because the prompt is the fastest thing on the screen.
  2. Alarm numbering stops matching the printed list after a software update, so the list describes a machine that is not installed.
  3. The translated manual leaves the safety callouts and warning boxes in English.
  4. The training record is a signature sheet that names no language and records no comprehension check.
  5. A Spanish decal sits beside a manual in another language, and the audit reads the machine before the file.
  6. The manual set arrives as a PDF with no revision number, so nobody can prove which text was delivered.

For example, in a 2026 order the first case costs seconds and the second costs a shift, and the 30% deposit has already moved before either is noticed.

Is the Manual Statutory and the Screen Only a Contract Line?

A statutory language duty is an obligation written into the law of the market where the machine is placed. A contract line is an obligation the buyer and the supplier write for themselves, and no regulator drafts it.

Annex I 1.7.4 of Directive 2006/42/EC requires instructions to be marked either Original instructions or Translation of the original instructions. Clause 1.7.4.1 requires each version to carry that wording, with the original attached.

Section 1.7.1, according to F2 Labs, also covers information given on a monitor screen. Any language beyond the market’s own becomes a matter to be settled by contract between the manufacturer and the user when the machinery is ordered, as the F2 Labs note reports.

Neither cited page mentions an alarm table, an HMI screen or a software revision, and one page dates the change of instrument to January 2027 as its own statement. The nine items in the shipping crate are counted elsewhere; the question here is which language each item arrives in, and a 2026 order settles that in one clause.

What Counts as a Language Deliverable?

Why Is a Translated Screenshot Not a Deliverable?

A language deliverable is an editable file set with an identifier, a revision and an owner, and a translated screenshot carries none of the three.

First, the editable string table holds every message the controller can display in Spanish, one row per message. Second, the alarm and message list groups rows into the sequences an operator meets on a shift. Third, the manual set carries the Annex I wording, a document number and a revision on every cover. Fourth, the decals and the nameplate are physical items on a schedule with part numbers.

The wording, according to Global LTS, must mark a translated version as a translation, and that rule is about text rather than layout.

In practice, the screenshot survives as evidence of what the screen showed on test day and nothing else. A 2026 order that accepts a photograph of the interface has bought no artefact at all.

What Must the String Table Carry, and Which Revision?

A message ID is the key that keeps a translated string attached to the screen element displaying the string, and the ID survives a software update while the wording does not.

The table needs six columns: ID, English source, target text in Spanish, trigger, owner and revision. The trigger column records what makes the message appear, because a translator without the trigger writes a sentence that fits the English and not the plant.

The revision column ties the file to the controller program revision, so a mismatch is visible at a glance.

According to four of four answers in the research run behind this article, screen text belongs inside the language set (100% of the four), and none of the four asked for an ID.

Finally, the same table is the acceptance document for the language-mode test in a 2026 order, because each row becomes one line with a pass or a fail.

Symptom, Mechanism, and the Clause That Decides It

Six Symptoms, the Mechanism and the Evidence

The table pairs three things: what a service visit shows, the mechanism behind the symptom and the clause that settles the matter. The last column is the evidence to request before the balance moves. The screen and the manual, according to the guidance quoted above, are held to different documents, and a 2026 order can name both.

What is seen What is happening Clause that decides Evidence to demand
Reset prompt in English No string table deliverable Screen language line Message table, revisioned
Alarm list off by one Update changed message IDs Revision clause to program Release note and re-test
Callouts left in English Main manual only translated Wording rule, Annex I 1.7.4.1 Signed review sheet
Spanish decal, other manual Decal schedule out of scope Decal schedule, part numbers Photograph of fitted decal
No revision on the PDF File, not a controlled record Document control line Delivery note with revision
Test passed by builder Only English screens walked Language-mode test clause Per-line pass or fail sheet

Which Answer Means the Delivery Is Not Accepted?

A delivery is not accepted when a required language artefact is missing, uncontrolled or untested, and the three conditions are separate findings with separate remedies.

Missing means the buyer holds no string table and no message list, and the screen can be read in one language only. Uncontrolled means a file exists with no ID, no revision and no named owner, so a later update cannot be compared with what was delivered. Untested means nobody has walked the screens, which is the finding a customer audit produces first.

Global LTS publishes a checklist that, according to the same page, names three audit failures: an English-only declaration, a translation without its identification, and a main manual translated while callouts stay in English.

A deviation list handles a small gap in a 2026 order: name the line, name the fix and name the date, then walk 100% of the rest before the machine is accepted.

Who Translates, and Who Stays Accountable?

The supplier, according to the guidance quoted above, stays accountable for the technical accuracy of a translated text, because the supplier wrote the source string and knows what each message triggers.

Three controls make a translation defensible. First, a fixed terminology list agreed before the first string is translated. Second, a technical review by a controls or safety engineer who can see the machine function behind each message. Third, a named signer for each language, because a signature is the part of the file an auditor can test.

Machine translation is a draft and not the deliverable, and the signer has to read the target language with professional fluency.

On the buyer’s side the duty is training in a language workers understand, and the evidence is an attendance sheet, a comprehension check and a per-shift roster, not a signed cover page. The readers of the handover pack are covered elsewhere; the language of each item is this question.

How Do You Test the Wording Before the Balance Moves?

What Does the Language-Mode Test Cover?

A language-mode test is an acceptance test run on the machine in the target language, with one line per message and a recorded result for each line.

Operator panel on a semi-automatic wrap-around labeler, the screen where every alarm and prompt has to appear in the plant language

First, set the panel to the delivery language and walk every screen in the operator path. Second, trigger every alarm, interlock, fault and recovery prompt, including conditions that need a forced input. Third, enter every mode and recipe path the line will use and confirm that the text follows the mode. Fourth, hold each decal and nameplate against the schedule and photograph the fitted decal.

Then put a shift operator through the stop and reset sequences without help, because comprehension is the part a screenshot cannot evidence.

In practice the sheet is filed with the screenshots in a 2026 order, so the record names the revision tested and 100% of the list carries a result.

How Is the Test Written Into the Payment Condition?

A payment condition is a sentence in a 2026 order that releases money only when a named document is signed, and the language acceptance sheet belongs in exactly that sentence.

The clause needs four parts: the artefacts, the test, the decision rule and the remedy. The artefacts are listed by ID and revision. The test is the language-mode test with one line per message. The decision rule is a pass on every safety-critical line and a written deviation for the rest. The remedy is a re-test before shipment or a rework agreed in writing first.

In practice the money is the 70% balance under 30/70 TT terms, released against the signed sheet rather than against the bill of lading. Our pre-shipment trial labeling on the buyer’s own bottles returns video, and the same acceptance sheet can travel back with the video.

Buyers who want the scope fixed before the deposit can send the market list through the contact form. The argument over the launch date belongs to another post; the release condition belongs here.

Who Pays for the Re-Translation After a Software Update?

A re-translation clause is the part of the order that says who produces the target text when the controller program changes, and without that clause the buyer pays by default.

The mechanism is simple. An update renumbers or rewrites messages, the string table revision no longer matches the program revision, and the screen falls back to the source language or shows a stale sentence.

The manual rule and the document checklist, according to both cited pages, never touch software updates, so the clause has to be written rather than referenced.

Three lines cover it. First, the revision of the string table follows the controller program revision. Second, release notes list 100% of the added, removed and changed message IDs. Third, the supplier re-translates changed rows within an agreed period and the buyer re-runs the affected test lines.

Who keeps the program source is a separate question, settled in the note on program and screen ownership; the language of an updated screen is this one.

Frequently Asked Questions

Must the Machine Manual Be Delivered in Spanish?

The manual must be delivered in the language the cited guidance assigns to the market where the machine is placed, and a translation must say on it that the text is a translation of the original instructions, with the original attached.

Is a Translated Screenshot Enough for the HMI?

No. A screenshot has no identifier, no revision and no owner, so the next update cannot be traced. The deliverable is the editable message table with IDs, tied to the controller program revision.

Who Translates the Alarm Messages?

The supplier answers for technical accuracy, a controls or safety engineer reviews the wording, and a named person signs each language. Machine translation works as a draft and not as the signed deliverable.

What Happens to the Translation After a Software Update?

Changed messages need new target text, and the order should say who produces that text and how the affected test lines are re-run. Without the clause the buyer pays for the update by default.

Get a factory quote for your own container.

Send the container, label size and target speed. You get a short list of machine options, an indicative price and a free test-run plan on your own labels.

Get a Factory Quote Request a Free Test-Run Video

Share

Related reading

Keep reading.

More guides from the same category, chosen for the machine types and container details they cover.

Labeling Machine Manufacturer Guides

Die-Cut Gap or Eye Mark: Whose Drift Is It?

Registration drift on a pressure-sensitive labeler reaches a distributor as an argument rather than as a fault, and the argument returns with every batch because three parties measure three different things. A die-cut gap and an eye mark are converter geometry. Registration is a machine reading of that geometry at line speed. Once the numbers ... <a title="Die-Cut Gap or Eye Mark: Whose Drift Is It?" class="read-more" href="https://hipaks.com/die-cut-gap-eye-mark-drift-order-lines/" aria-label="Read more about Die-Cut Gap or Eye Mark: Whose Drift Is It?">Read more</a>

Nov 26, 2026 · 11 min read
Read guide
Labeling Machine Manufacturer Guides

How Many Bottles Prove a Labeler? The Sampling Plan

An acceptance sampling plan for a labeler is a rule for deciding, from a counted sample of labelled bottles, whether the machine may be accepted, and the bottle count is the last item to fix rather than the first. Five parts carry the plan: the population, one bottle lot crossed with one label station and ... <a title="How Many Bottles Prove a Labeler? The Sampling Plan" class="read-more" href="https://hipaks.com/labeled-output-acceptance-sampling-defect-classes/" aria-label="Read more about How Many Bottles Prove a Labeler? The Sampling Plan">Read more</a>

Nov 25, 2026 · 11 min read
Read guide
Labeling Machine Manufacturer Guides

Uptime Clause: Which Stops Count Against the Supplier?

An uptime clause is a formula with four decisions written into the purchase contract, and month one is where those decisions meet an installed machine. The four decisions are the two clocks, the closed list of exclusions, the boundary between supplier stops and buyer stops, and the evidence attached to every stop. On a pressure-sensitive ... <a title="Uptime Clause: Which Stops Count Against the Supplier?" class="read-more" href="https://hipaks.com/labeler-uptime-clause-first-month-stoppage-ledger/" aria-label="Read more about Uptime Clause: Which Stops Count Against the Supplier?">Read more</a>

Nov 24, 2026 · 11 min read
Read guide

Not sure which machine fits your line?

Send the container and the target speed. HiPaks replies with machine options, an indicative price and a test-run plan on your own labels.

Get a Factory Quote Find Your Machine in 3 Steps
Back to top