HiPaks builds round bottle labeling machines in Guangdong, China: wrap-around stations for glass, PET and HDPE containers, horizontal units for vials and slim bottles, and orientation tooling for tapered and conical shapes. Semi-automatic models hold ±0.5mm.
Round containers are our deepest product line. Small vials and ampoules that cannot stand stable run on the T923 horizontal machine. Standard bottles and jars run wrap-around on the MT-805 semi-automatic or the T921 inline automatic.

Looking for a round bottle labeling machine for sale? Here is how our tiers work: speed and price follow the automation level, and accuracy on high-end models reaches ±0.2mm (industry norm is ±0.5–1mm).
| Term | Detail |
|---|---|
| Delivery | Semi-automatic desktop: 7–10 days. Inline automatic and rotary systems: lead time confirmed at the quote stage. |
| Payment | 30% deposit on order. 70% balance paid before shipment, after your machine test video is approved. |
| Incoterms | FOB Shenzhen by default. CIF / DDP / door-to-door available on request. |
No two round containers label the same way. Our 15-year engineering team builds the tooling around your container and runs a labeling test on your sample before you order.

We publish only what is verified. CE and ISO 9001 certification are in progress; the current document status for your market is confirmed in writing at inquiry.
Certification in progress, documents on request
Certification in progress
Confirmed per project in writing
Sensors & drives on critical axes
Round containers are where our labeling-test footage is deepest: every model in this category has real test video, because we test every machine on the customer’s own container before shipping. See customer cases →
Round bottle labelers delivered to 500+ factories across 50+ countries: vials, jars, cans, beverage and cosmetic containers.
Founded by an engineer with 15 years of labeling-machine experience. Your container sample is reviewed by engineering, not sales.
SICK photoelectric sensors and Panasonic servo drives on critical axes: stable label registration at every speed tier.
Every round bottle labeler is tested on your real container before shipping. You approve the test video and a physical sample first.