HiPaks is a labeling machine manufacturer in Guangdong, China, building the T9xx automatic series: round bottle, horizontal, flat, single-side and two-side inline labelers that connect to your PLC line. Automatic lines hold ±1mm placement and run 40–300.
Our automatic range covers every inline labeling scenario: T921 wrap-around for round bottles, T923 horizontal for vials and unstable small bottles, T931 flat labeling and T932 flat-with-paging for sheets, pouches and cartons, T961 single-side, T962 two-side, and T963 two-side with round-bottle orientation. Every machine feeds from its own conveyor and synchronizes with your line. Full model list in the product.

Automatic lines hold ±1mm placement on the standard T9xx range; where a project needs tighter placement we quote the high-precision flat platform. Labeling speed depends on model, container size and label format, so we confirm exact numbers against your samples at the quote stage instead of.
| Term | Detail |
|---|---|
| Delivery | Semi-automatic desktop: 7–10 days. Fully automatic inline systems: 7–25 days, custom builds 25 days, confirmed at the quote stage against your configuration. |
| Payment | Standard terms are 30% deposit and 70% before shipment, released after your machine test video is approved. Certain models can be quoted at 50/50; the split on your order is written into the quotation. |
| Incoterms | FOB Shenzhen by default. CIF / DDP / door-to-door available on request. |
An automatic labeler is only as good as its fit with your line. Our engineering team (led by a founder with 15 years in labeling machines) designs the integration around your takt, containers and control system.

We publish only what is verified. CE and ISO 9001 certification are in progress; the current document status for your market is confirmed in writing at inquiry, and machine-specific certificates are quoted per project.
Certification in progress, documents on request
Certification in progress
Confirmed per project in writing
Sensors & drives on critical axes
Automatic lines fail or succeed at commissioning. We run your machine on your containers, film it, and support you remotely for the life of the equipment.
Automatic labeling systems delivered to 500+ factories across 50+ countries: food, beverage, cosmetic, pharmaceutical and chemical lines.
Founded by an engineer with 15 years of labeling-machine experience. Line-integration questions go straight to engineering.
SICK photoelectric sensors and Panasonic servo drives on critical axes: stable registration on 24/7 automatic lines.
Every automatic machine is run with your containers before shipping. You get the commissioning video, plus remote support via WhatsApp after delivery.