A used labeling machine is a purchase decided by paperwork and one witnessed run, not by the number on the invoice. Three items settle the decision: the document pack a seller can produce, a timed run with your own bottles and labels, and a stop list that ends a negotiation before travel costs arrive. The common error is reading a low price as evidence about condition. A used unit still has to hold the accuracy band of its class, which means plus or minus 0.5 mm on a semi automatic labeler and plus or minus 1 mm on a fully automatic unit, excluding product and label error. No invoice proves either figure. Calipers, ten bottles and a complete file do. The seven steps below run from the first email to the balance payment, and a closing table turns the findings into a decision one plant manager can sign. Every step assumes one unit for one plant, not a warehouse of stock for resale.
Step 1: Which Documents Should You Ask For Before the First Visit?
A document pack is the set of files a seller hands over before a balance payment, and most used labeler listings never assemble one. Ask for six items in the first email. First, the as built electrical drawings, with the revision letter and date visible on the title block. Second, the PLC and HMI programs plus a parameter backup that restores on your own laptop. Third, the maintenance history with dates and part numbers. Fourth, the change part drawings for every bottle size the unit has run. Fifth, the declaration of conformity and a legible photo of the serial plate. Sixth, the spares register with manufacturer part numbers. A seller who produces four of six items is selling an undocumented machine. Pay 30% on order and hold the 70% until the file is complete, the same split that applies to a new unit in 2026. The Step 2 plate photo belongs in that pack, not in a chat thread.
Step 2: What Does the Serial Plate Prove Before You Book a Visit?
The serial plate is the identity record riveted to the frame, and one clear photograph decides whether a trip is worth booking. Four details belong in the same frame: manufacturer name, model code, serial number and year of manufacture, with enough surrounding frame visible to prove the plate belongs to that machine. The year on the plate, not the seller’s memory, sets the spares question, because a control platform older than about fifteen years may have no supported PLC family. A plate removed, repainted or replaced with a stamped blank is the first stop signal. Ask for a second photo at a low angle under raking light, since a restamped number shows a ghost outline there and disappears in a straight shot. The selection guide asks for the same four details on a new machine.
Step 3: How Do You Date the Machine From the Frame?
A used labeler is dated by the frame, and fresh paint is the least reliable evidence in the yard. Work along the frame in order. First, inspect the weld beads at the corners and under the base plate for cracks and for dressing that hides a repair. Second, look for paint on the rubber feet, on the nameplate edge and inside the cabinet door, since a quick repaint misses those three places. Third, run a finger along the guide rails and the wrap belt pulleys for a step or a groove. Fourth, open the cabinet and smell for burnt insulation, then look for jumper wires added after the build. Fifth, check the floor under the machine for adhesive drips and oil stains. A frame straightened after a fall shows a ripple along the bend, and frame geometry sets the label path that Step 4 measures.
Step 4: How Much Rail Wear Is Too Much?
Rail wear is the loss of material where the guide rail, the wrap belt and the peel plate meet the bottle, and the figure only means something when measured against a datum. Take a caliper reading at a marked point on the rail of a new machine of the same model, then at the same point on the used unit, and write both numbers in tenths of a millimetre. First, tie the reading to the class band: plus or minus 0.5 mm on a semi automatic unit, up to plus or minus 0.2 mm on an MT-807 class machine, plus or minus 1 mm on a fully automatic unit. Second, check where a guide worn by 0.3 mm shifts the gap at the peel plate, which shows as a label 1 mm low on one side. Finally run ten bottles and measure placement on one datum. A rail inside the band plus ten clean bottles is acceptance evidence.
Step 5: Which Control Platform Are You Buying?
A control platform is the electronics set that decides whether the machine can be repaired in five years. Read six items off the panel. First, the PLC family and firmware version, because a family introduced before 2019 may already be short of boards. Second, the servo and stepper drives, ideally a brand a local distributor stocks. Third, the sensor brands on the label path, since a SICK or Panasonic gap sensor is replaceable in days while an unbranded head can need a factory order. Fourth, the power supply brand, because a Mean Well unit is a catalogue part. Fifth, the HMI model and whether the project file is editable. Sixth, the safety relay and its wiring. In our own plant the core parts are SICK sensors, Panasonic heads, Mean Well supplies and Leadshine steppers, so a used unit with the same list keeps a global spares route open.
Step 6: Why Can’t Cold Inspection and a Full Speed Run Share One Visit?
A cold inspection is a check made before the machine runs that day, and a production speed run is a timed test at line rate. The two cannot happen in the same hour. A cold machine shows adhesive leaks, belt set, dried glue on the peel plate and heat marks, because ten minutes of running softens residue and expands a tight bearing. The run needs the opposite condition: the unit warm, bottles loaded, the conveyor at rate, and at least 60 minutes of continuous work to expose an intermittent fault. Four findings appear only warm: a gap sensor that drifts after twenty minutes, a clutch that slips at rate, a wrap belt that tracks off centre when hot, and a label roll that breaks at the splice. Book two visits, or one full day with the cold hour first and the run after lunch.

Step 7: How Do You Turn a Demo Into Labels per Minute?
Labels per minute is the only demo figure worth writing down, and the calculation needs a stopwatch, a counter and the reject tray. Time a fixed run of 100 bottles, count good labels, and divide by the minutes actually run rather than the minutes planned. Then compare the result against the class band: 15 to 30 pcs/min on a semi automatic unit and 40 to 300 pcs/min on a fully automatic unit, as listed in the semi automatic range. A used machine running at 60% of the low end of its band is a bottleneck with a discount, not a bargain. Add the changeover time the seller quotes for a bottle size change, because a 25 minute changeover eats two hours in a three SKU week. Finally record the reject count and the failure type: skewed, wrinkled, doubled or missing.
When Does Refurbishment Become Modification?
Where Refurbishment Ends and Modification Begins
A refurbishment is a repair and clean up that returns a machine to its original specification, and a modification is a change to the specification itself. The boundary matters because responsibility moves with it. According to HSE guidance on refurbished and modified machinery, a business that rebuilds or substantially modifies a machine for supply can carry the duties of the manufacturer, including a technical file and a new declaration of conformity. Three changes cross the line: a new control system with different safety functions, a guard removed or reshaped, and a drive sized above the original rating. Under 29 CFR 1910.212, the guarding duty follows the machine into service.
The Stop List: Findings That End the Deal
A stop list is a set of findings that end a negotiation on the spot, and the list works because each item removes evidence rather than adding doubt. Walk away on these seven. First, no serial plate, or a plate that does not match the paperwork. Second, no parameter backup and no witnessed restore. Third, a control platform the seller cannot name or support. Fourth, a frame repair at a mounting point, because frame geometry sets the label path. Fifth, guards removed, interlocks bypassed or an emergency stop that does not latch. Sixth, adhesive contamination inside the cabinet, which means the seal failed years ago. Seventh, a refusal to run your own bottles at the Step 6 rate. One item is a negotiation, two items are a decision, and the decision is to keep looking.
What Does the Decision Table Look Like?
A decision table is a one page summary that turns the seven steps into a signature. Score a used unit against 7 lines and count the walk away entries: 1 means negotiate, 2 means stop. A unit that passes six lines is worth the freight. For a new machine, the labeling machine FAQ answers the same checks in the same order.
| Check | Accept | Negotiate | Walk away |
|---|---|---|---|
| Serial plate | Matches invoice and file | Repainted, stamping legible | Missing or restamped |
| Frame welds | Sound, no dressing | One dressed repair | Crack at a mounting point |
| Rail wear | Under 0.3 mm on the datum | 0.3 to 0.6 mm, reshim | Groove felt by hand |
| Control platform | Branded, supported family | One obsolete module | Unnamed controller, no backup |
| Cold inspection | No adhesive leaks or heat marks | Dried residue at the peel plate | Glue inside the cabinet |
| Timed run | Inside the class band, rejects counted | 80% of band with noted faults | Jams above half rate |
| Document pack | Five of six items, restore witnessed | Four items, restore promised | Under four items |
Used Labeling Machine Inspection: Frequently Asked Questions
Can a Used Labeler Meet My Accuracy Requirement?
A used labeler meets the accuracy requirement when a timed run proves the band, not when a datasheet claims it. Run ten bottles of your own stock at line speed, measure placement on one datum, and compare against the class band: plus or minus 0.5 mm on a semi automatic unit, up to plus or minus 0.2 mm on an MT-807 class machine, plus or minus 1 mm on a fully automatic unit. A unit that misses the band after rail and peel plate adjustment is a rebuild, not a purchase.
Which Document Ends the Deal If It Is Missing?
A parameter backup with no witnessed restore is the document that ends the deal, because the control platform becomes unrecoverable. A used labeler without a restorable program cannot be repaired from a drawing alone, and a replacement controller on a family discontinued before 2019 can cost more than the machine saved. Ask for a restore on your own laptop, a power cycle, and ten bottles labeled to the same placement. A refusal turns the purchase into scrap metal with a working paint job.
Can a Remote Video Inspection Replace the Visit?
Remote video inspection is a filter, not an inspection, because a camera cannot measure wear. A call can verify the plate, the cabinet, the drawing revision and the drive brands, and a filmed run shows the label path in motion. Rail wear, frame straightness and adhesive residue need a caliper and a hand on the machine, which is the Step 4 measurement. Use video to decide whether to travel, then book the visit.