China labeling machine manufacturer, OEM/ODM, semi-automatic to high-speed rotary systems.

Sticker Labeling Machine Manufacturer. Self-Adhesive Labelers, OEM/ODM.

HiPaks builds pressure-sensitive sticker labeling machines in Guangdong, China, for flat, round, square and custom label shapes on bottles, pouches, cartons and small components. The range covers semi-automatic desktop units at 15–30 pcs/min and inline.

±0.2mm
Labeling Precision (selected models)
7–10days
Semi-Automatic Lead Time
SICK
Label Gap Detection Sensors
1unit
Standard MOQ

Self-Adhesive Labeling in Every Format: From First Machine to Full Line

Sticker labeling machines apply self-adhesive labels (pressure-sensitive labels on a release liner) onto round bottles, flat panels, boxes and pouches. It is the most flexible labeling technology: labels are easy to source, changeovers take minutes, and there is no glue system to maintain. HiPaks builds the complete self-adhesive range in-house.

HiPaks fully-automatic round and flat bottle combo self-adhesive labeler
T921 inline round bottle labeler: wrap-around self-adhesive labeling on your conveyor

Sticker Labeling Specifications & Purchase Terms

Commercial terms below are standard across the self-adhesive range. Speed and label-size ranges depend on the exact model and your container.

TermDetail
Per-Model ParametersLabeling speed range and label-size capacity vary by model. Inline system lead time quoted per project.
Payment30% deposit on order. 70% balance paid before shipment, after the labeling-test video is approved.
IncotermsFOB Shenzhen by default. CIF / DDP / door-to-door available on request for qualified orders.

Self-Adhesive Labeling in Every Format: From First Machine to Full Line

Sticker labeling machines apply self-adhesive labels (pressure-sensitive labels on a release liner) onto round bottles, flat panels, boxes and pouches. It is the most flexible labeling technology: labels are easy to source, changeovers take minutes, and there is no glue system to maintain.

  • Every format covered: wrap-around round bottles, flat panels, front-and-back two-side, corner wrap
  • SICK photoelectric sensors detect label gaps (including clear and small labels) for consistent placement
  • Precision to ±0.2mm on selected models, versus an industry norm of ±0.5–1mm
  • Technology boundary: need wash-off paper labels at high volume? See our wet glue guide. Running OPP/BOPP film at 10,000–15,000 bph? See the hot melt rotary labeler.
HiPaks fully-automatic round and flat bottle combo self-adhesive labeler
T921 inline round bottle labeler: wrap-around self-adhesive labeling on your conveyor

Certifications & Compliance

All HiPaks machines are built to CE standards. Other certificates are confirmed per project; ask our team for the latest documentation.

Standard

CE Marking

Certification in progress, documents on request

System

ISO 9001

Certification in progress

Product

Machine Certificates

Confirmed per project in writing

Regional

US / EU / ME

Confirmed at inquiry

A Factory That Tests Every Machine on Your Real Containers

Most suppliers show catalog photos. We film every model actually labeling real containers (including the hard scenarios like clear labels and small labels), and your machine is tested on your bottles before it ships.

50+ Countries, 500+ Factories Served

HiPaks sticker labeling machines run in 500+ factories across 50+ countries: cosmetics, food, beverage and household chemical brands among them.

Engineer-Founded, 15 Years

Founded by an engineer with 15 years of labeling-machine industry experience. Model selection and quoting are done by engineers, not resellers.

SICK & Panasonic Core Parts

SICK photoelectric sensors and Panasonic servo drives on the critical axes: the reason our machines hold ±0.2mm on a production floor.

Real Labeling-Test Videos

Every model has a real labeling-test video. Before shipping, your machine runs on your containers. You approve the video and a physical sample first.

Manufacturer Questions

What is a sticker labeling machine?
A sticker labeling machine applies self-adhesive labels (pressure-sensitive labels carried on a release liner) onto bottles, boxes, pouches or flat panels. It is the most common labeling technology for small and mid-size producers because labels are easy to source, changeovers are fast and the machines are simple to run. Self-adhesive labeling machine is the industry term for the same equipment.
Can your machines apply clear (transparent) labels?
Yes. Clear labels need a transparent-label sensor: our machines use SICK photoelectric sensors for label gap detection, plus controlled peel and wipe pressure to avoid bubbles. Send us your label sample and we will run a labeling test on your container before quoting.
Do you support front-and-back two-label application?
Yes. Our T961 / T962 automatic two-side machines apply front and back labels in one pass on round, square and flat bottles, and our MT-860 does the same job as a semi-automatic desktop unit for lower volumes. Three-label setups (front, back, top seal) are available as custom builds.
What is the MOQ, and how fast is delivery?
MOQ is one unit. Semi-automatic machines ship in 7–10 days; fully automatic inline systems are quoted with a per-project lead time. Payment is 30% deposit plus 70% before shipment, FOB Shenzhen.
Sticker labeling vs wet glue labeling: which should I choose?
Choose sticker (self-adhesive) labeling if you need flexible short runs, premium label finishes or a low entry cost; it is the right first labeling machine for most growing brands. Wet glue is cheaper per label at very high volumes on paper labels, but the equipment is larger and glue management adds complexity. If you are unsure, send your label and container photos and we will recommend the technology.
Which label materials and liners work with your sticker machines?
Paper, PP, PET and clear film on a standard liner are all in scope. The machine is set for your liner thickness and web tension at build, and the peel plate and sensor are matched to the label, so send a roll with your sample before the order is confirmed.
How do you handle transparent labels on clear bottles?
With ultrasonic sensing. A photoelectric sensor reads light interruption, which a transparent label does not create, while an ultrasonic sensor reads the physical thickness of the label against the liner. SICK sensors are fitted at build time where the label specification calls for them.
What are the payment, warranty and lead time terms?
Standard terms are 30% deposit and 70% before shipment, with a 50/50 split available on certain models and written into your quotation. Semi-automatic machines ship in 7–10 days, automatic lines in 7–25 days, custom builds 25 days. Every machine carries a one-year warranty plus lifetime technical support and an English manual with operation videos.
Back to top