HiPaks is a labeling machine manufacturer in Guangdong, China, building bottle labelers for round, square, flat and tapered containers, from desktop semi-automatic units to 10,000–15,000 bph rotary systems. Semi-automatic models hold ±0.5mm, the MT-807 flat.
We organize our bottle labeling range by container shape, because that is how buyers actually search. Round bottles run on wrap-around machines (MT-805 semi-automatic, T921 inline automatic, T923 horizontal for small vials). Square and flat bottles run on two-side machines (MT-860, T961, T962).

Bottle labeling machine price is driven by three things: bottle shape, target speed and automation level. Send us your bottle photo and we reply with a matched solution and a factory quote.
| Term | Detail |
|---|---|
| Delivery | Semi-automatic desktop: 7–10 days. Automatic and rotary systems: 7–25 days, custom builds 25 days, confirmed against your configuration. |
| Payment | Standard terms are 30% deposit and 70% before shipment, released after your bottle test video is approved. Certain models can be quoted at 50/50; the split is written into the quotation. |
| Incoterms | FOB Shenzhen by default. CIF / DDP / door-to-door available on request. |
Every HiPaks bottle labeler is engineered around the customer’s container. Our 15-year engineering team designs the tooling, you send a sample bottle, and we run the labeling test before you commit.

We publish only what is verified. CE and ISO 9001 certification are in progress; the current document status for your market is confirmed in writing at inquiry.
Certification in progress, documents on request
Certification in progress
Confirmed per project in writing
Sensors & drives on critical axes
Bottle labeling machines for beverage, cosmetic, pharmaceutical and chemical lines, delivered to 500+ factories in 50+ countries. See real customer cases →
Bottle labelers delivered to 500+ factories across 50+ countries, with strong presence in the US, EU, Middle East and Southeast Asia.
Founded by an engineer with 15 years of labeling-machine experience. Your bottle sample is evaluated by engineering, not sales.
SICK photoelectric sensors and Panasonic servo drives on critical axes: proven reliability on 24/7 bottling lines.
Every machine runs a labeling test on your actual bottles before shipping. You approve the test video and a physical sample first.