
MT-50 Round Bottle Labeler
Semi-Auto · ±0.5mm · 7–10 days
Desktop semi-automatic round bottle labeler.
Formerly LT-50
Request a QuoteThis online catalog replaces the PDF brochure: every labeling machine HiPaks builds, with photos and one-line positioning: no download, no waiting. Browse the five categories, pick your model and request a quote directly with the model number.
No model matches this combination. Tell us your container shape and target output. Custom configurations are our daily work.
Request a Custom Quote →Every model below is built in our own factory with SICK photoelectric sensors and Panasonic servo drives, and tested on the customer’s own containers before shipping. HiPaks machines are at work in 50+ countries: 500+ factories served. Found a model? Quote it with the model number and we reply within 12 hours.

Semi-Auto · ±0.5mm · 7–10 days
Desktop semi-automatic round bottle labeler.
Formerly LT-50
Request a Quote
Semi-Auto · ±0.5mm · 7–10 days
Desktop flat surface labeler for boxes, bags and panels.
Formerly LT-60
Request a Quote
Semi-Auto · ±0.5mm · 7–10 days
Compact desktop round bottle labeler.
Formerly LT-130
Request a Quote
Semi-Auto · ±0.5mm · 7–10 days
Pneumatic round bottle labeler with front-and-back labeling.
Formerly LT-190
Request a Quote
Semi-Auto · ±0.5mm · 7–10 days
Electric round bottle labeler: runs without compressed air.
Formerly LT-190
Request a Quote
Semi-Auto · ±0.5mm · 7–10 days
Floor-standing semi-automatic round bottle labeler, high precision.
Formerly 801L
Request a Quote
Semi-Auto · ±0.5mm · 7–10 days
Semi-automatic front-and-back flat labeler for flat bottles and curved surfaces.
Formerly 803
Request a Quote
Semi-Auto · ±0.5mm · 7–10 days
Semi-automatic wrap-around labeler for flat, square and irregular containers.
Formerly 805
Request a Quote
Semi-Auto · ±0.2mm · 7–10 days
Semi-automatic high-precision flat labeler.
Formerly 807
Request a Quote
Semi-Auto · ±0.5mm · 7–10 days
Semi-automatic fold-over labeler for tubes, wires and pens.
Formerly 808
Request a Quote
Semi-Auto · ±1mm · 7–10 days
Semi-automatic double side labeler for flat and square bottles.
Formerly 860
Request a Quote
Auto · Desktop · ±0.5mm · 7–10 days
Desktop automatic flat surface labeler.
Formerly LT-160 / ALB-210
Request a Quote
Auto · Desktop · ±0.5mm · 7–10 days
Desktop paginating flat labeler for bags and pouches.
Formerly ALB-210
Request a Quote
Auto · Desktop · ±0.5mm · 7–10 days
Desktop double side labeler.
Formerly LT-301
Request a Quote
Auto · Desktop · ±0.5mm · 7–10 days
Desktop automatic round bottle labeler, roller-driven.
Formerly LT-150 / ALB-320
Request a Quote
Auto · Desktop · ±0.5mm · 7–10 days
Desktop automatic oriented round bottle labeler.
Formerly ALB-420
Request a Quote
Auto · ±1mm · Lead 7–25 days
Fully automatic inline round bottle labeler, roller-driven.
Formerly T821
Request a Quote
Auto · ±1mm · Lead 7–25 days
Fully automatic oriented round bottle labeler.
Formerly T822
Request a Quote
Auto · ±1mm · Lead 7–25 days
Oriented round bottle labeler with star-wheel positioning.
Oriented variant of the T922 platform
Request a Quote
Auto · ±1mm · Lead 15 days
Fully automatic horizontal round bottle labeler.
Formerly T823
Request a Quote
Auto · ±1mm · Lead 7 working days
Fully automatic flat / top surface labeler.
Formerly T831
Request a Quote
Auto · ±1mm · Lead 15 days
Fully automatic paging labeling machine for bags and cards.
Formerly T832
Request a Quote
Auto · ±1mm · Lead 7–25 days
Dual-head corner and seal labeling machine.
Formerly T833
Request a Quote
Auto · ±1mm · Lead 7–25 days
Fully automatic bottom labeling machine.
Formerly T835
Request a Quote
Auto · ±1mm · Lead 20 days
Fully automatic top-and-bottom flat labeler.
Formerly T836
Request a Quote
Auto · ±1mm · Lead 10 days
Fully automatic inline flat labeling machine.
Formerly T851
Request a Quote
Auto · ±1mm · Lead 10 days
Fully automatic inline side labeling machine.
Formerly T852
Request a Quote
Auto · ±1mm · Lead 7–25 days
Fully automatic gantry labeling machine.
Formerly T853
Request a Quote
Auto · ±1mm · Lead 25 days (customized)
Fully automatic single side labeling machine.
Model number unchanged
Request a Quote
Auto · ±1mm · Lead 25 days (customized)
Fully automatic double side labeling machine.
Model number unchanged
Request a Quote
Auto · ±1mm · Lead 25 days (customized)
Fully automatic flat & round bottle combination machine with oriented labeling.
Model number unchanged
Request a Quote
Line · Specs on request · Lead 7–25 days
Online print-and-apply labeling machine: real-time variable data, flat and side-apply configurations.
Formerly ALB-6000
Request a Quote
Line · OEM · ±1mm · Lead 10 days
Inline flat labeling applicator head: drop-in OEM module with standard mounting interfaces and I/O documentation.
Formerly T851
Request a Quote
Line · OEM · ±1mm · Lead 7–25 days
Gantry labeling applicator head: drop-in OEM module for overhead labeling above customer conveyors.
Formerly T853
Request a Quote
Line · Rotary · ±1mm · Lead quoted per project
Hot melt glue rotary labeling machine with 12 stations for BOPP/OPP roll-fed labels on beer, water and beverage lines.
12-station configuration
Request a Quote
Line · Rotary · ±1mm · Lead quoted per project
Hot melt glue rotary labeling machine with 16 stations for oval bottles at 10,000–12,000 bph.
16-station configuration
Request a QuoteHiPaks renumbered its range into the MT (semi-automatic and desktop), T9 (automatic inline) and FT (print & apply) families. Older catalog codes (LT-, T8-, numeric and ALB- series) still appear in quotations and manuals, so here is the correspondence. The 36-model total includes both the current range and these legacy-numbered machines.
| Series | Current codes | Former codes |
|---|---|---|
| Semi-automatic MT | MT-50, MT-60, MT-130, MT-190, MT-190e, MT-801L, MT-803, MT-805, MT-807, MT-808, MT-860 | LT-50, LT-60, LT-130, LT-190, 801L, 803, 805, 807, 808, 860 |
| Desktop automatic MT | MT-210, MT-211, MT-301, MT-320, MT-330 | LT-160 / ALB-210, ALB-210, LT-301, LT-150 / ALB-320, ALB-420 |
| Automatic inline T9 | T921–T923, T922R, T931–T936, T951–T953, T961–T963 | T821–T823, T831–T836, T851–T853 (T961–T963 unchanged) |
| Print & apply | FT-600 | ALB-6000 |