Assembly Lines
Bench by bench, labelers are built against the same spec sheets we publish, all wired in-house.
One factory for semi-automatic desktop labelers to 15,000 BPH rotary hot melt lines.
Four departments, one production flow: from machined jigs to a crated, tested machine built around your container.
Bench by bench, labelers are built against the same spec sheets we publish, all wired in-house.
Custom jigs for flat, square, tapered and curved containers are machined in-house, drawings archived for repeat orders.
Every machine runs a full-speed acceptance test before crating: with your bottles, recorded on video.
Export-packed in fumigated wooden cases per destination, with HS 8422.30 paperwork confirmed on every quotation.
See it live: book a video tour.
Most suppliers test with a shelf demo bottle. We test with yours and send you the video.
The checklist our QC station signs off before any machine is crated:
| # | Checkpoint | What we verify |
|---|---|---|
| 1 | Rated-speed run-in | Full rated speed, sustained, no drift |
| 2 | Your-bottle test run | Accuracy readout with your product & labels |
| 3 | Accuracy verification | ±0.2 / ±0.5 / ±1mm per model class |
| 4 | Label sensor setup | Incl. transparent labels via SICK sensors |
| 5 | Conveyor synchronization | For T95x heads on existing lines |
| 6 | Voltage & safety | 110V / 220V 50–60Hz per destination, CE file |
| 7 | Print–apply timing | FT-600 print/label linkage, no smudge, no miss |
| 8 | Glue system check | Hot melt 120–160°C window, two-edge application |
| 9 | Spare-parts kit | Packed and listed against the delivery checklist |
| 10 | Documentation & video | English manual, operation videos, FAT video archived |
Our archive holds test-run videos recorded for real buyer products: cosmetics bottles, detergent pouches, vape pens and more. Your machine ships with its own video: your bottles, your labels, your target speed, readout on screen.
Watch real runs in the test-run video library, or read the complete protocol on the FAT & quality page.
Eight product lines cover 15 bottles/min to 15,000 bottles/hour, plus three engineering capabilities most factories outsource or refuse.
T801–T808 floor units and MT desktops: 15–30 pcs/min, ±0.5mm (±0.2mm on T807).
T921 wrap-around, T922R starwheel, T923 horizontal, T931–T936 flat, seal, top & bottom: ±1mm, 40–300 pcs/min.
Round, square, flat and jar formats, including lid-and-body jar configurations.
T951 / T952 / T953 heads for factories integrating into an existing conveyor.
T961 / T962 / T963: single-side, double-side and combo round+flat frames at 60–120 pcs/min.
FT-600 inline print & apply for variable data, plus T-180 / T-190 waybill applicators for e-commerce.
12- and 16-station rotary hot melt at 12,000–15,000 BPH, multi-station units, and paste labelers for cans.
Shrink-sleeve tunnel systems for full-body decoration, spec sheet available on request.
Bottom labeling, corner labeling, three-panel wraps: if it holds a label, we can build around it.
Flat, square, tapered, curved: custom labeling machine jigs designed and machined in-house, drawings archived for repeat orders.
T95x heads adjusted to your conveyor height and travel direction, and retrofit without replacing the line.
OEM labeling machine production for distributors and integrators: your brand, our factory, with photo/video/spec-sheet support for your end customers.
The parts that decide accuracy and uptime are international brands, written into every spec sheet, purchasable anywhere in the world.
| Component | Brand (origin) | Why it matters |
|---|---|---|
| Label sensor | SICK (Germany) · Datasensor (Italy) · Hypsen (US) | Reliable detection incl. transparent labels |
| PLC | Panasonic (Japan) | Stable motion control, documented I/O |
| Power supply | Mingwei / Mean Well (Taiwan) | Industrial-grade, globally replaceable |
| Stepper system | LeadShine | Precise label feed, low vibration |
Spares are purchasable locally or from us within 48 hours. See the parts diagram.
Buying from China is a trust problem: here is every check to run before the deposit.
HiPaks (Hipack Tech) is a registered manufacturer, not a reseller. We share the business license and export record on request; machines ship under HS code 8422.30 with full customs documentation. A trading company cannot show you a production floor. We invite you to look at ours.
Schedule a video call and walk the assembly lines in real time: see machines mid-build, the jig workshop and the FAT station. If your machine is already in production, we point the camera at it. Book a tour in your timezone.
Standard terms are 30% T/T deposit and 70% T/T balance before delivery. Alibaba Trade Assurance is accepted for buyers who want platform-backed protection, and L/C can be discussed for larger orders. The payment route never changes the testing: the FAT video comes before the balance payment.
Book SGS, QIMA or any inspector you trust for a pre-shipment inspection at your cost. We open the floor, provide power and bottles for the run, and hand over the report with the machine.
The sequence protects both sides: you see your machine running your bottles at target speed (recorded, with the accuracy readout) before the 70% balance is wired. What you approve is what ships. More on the buy-from-China guide.
HiPaks (Hipack Tech) is the manufacturer: 36 labeler models are built and tested in our own plant, from desktop MT-50 units to 2,000kg rotary hot melt machines. Verify us with a live video factory tour, our export record (HS 8422.30) and a FAT run on your own bottles, checks a trading company cannot pass (see How to verify us).
Standard terms are 30% T/T deposit with the 70% balance due only after your machine passes FAT and you have seen the test video. Alibaba Trade Assurance is accepted for platform-backed protection, and L/C is negotiable on larger orders. Whichever route you choose, third-party inspection (SGS / QIMA) is welcome before shipment.
Yes. Send samples and we run them at your target speed, delivering the video with accuracy readout within 48 hours of arrival. The quote is based on that exact configuration: jig, sensor and speed. How the test-run works.
Semi-automatic standard machines ship 7–10 days after payment confirmation. Fully automatic standard machines take 15–35 working days (confirm at quotation). Custom jigs and rotary hot melt lines are scheduled per project after engineering review. We give you a date with the quote, not after it.
Yes, we build OEM and private-label machines for distributors and integrators, with photos, videos and spec sheets supplied under your brand. Jig drawings and sample parameters are archived so repeat orders are fast. Start via the contact page.
A sample of configurations running in the field today. Full stories in our case studies.
A Russian food producer runs our glue (paste) labeler on tin cans: low cost per label, proven in wet environments.
Horizontal T923 platform labels test tubes and small vials at up to 300 pcs/min.
T-180 / T-190 stack-label applicators print and place shipping labels on e-commerce parcels without stopping the belt.
A flat, curved-faced bottle that defeated two standard machines, solved with a custom jig and full-wrap labeling.
Double-sided labeling on returnable glass bottles, synchronized to an existing conveyor at craft-brewery speeds.
A European distributor private-labels our semi-automatic line: factory photos, videos and spec sheets under their brand.
Full stories in our case studies.
Standard on all machines; certificate scan included with the quotation.
North American electrical versions offered per market. We confirm the current certificate package for your destination.
Quality-system certification, status updated here as certificates are confirmed.
See the CE vs UL vs CSA guide.
| Machine type | Lead time |
|---|---|
| Semi-automatic standard | 7–10 days after payment confirmation |
| Fully automatic standard | 15–35 working days (confirm at quotation) |
| Custom & rotary hot melt | Engineered per project, scheduled after review |
HiPaks (Hipack Tech) is the manufacturer: 36 labeler models are built and tested in our own plant, from desktop MT-50 units to 2,000kg rotary hot melt machines. Verify us with a live video factory tour, our export record (HS 8422.30) and a FAT run on your own bottles, checks a trading company cannot pass (see How to verify us).
Standard terms are 30% T/T deposit with the 70% balance due only after your machine passes FAT and you have seen the test video. Alibaba Trade Assurance is accepted for platform-backed protection, and L/C is negotiable on larger orders. Whichever route you choose, third-party inspection (SGS / QIMA) is welcome before shipment.
Yes. Send samples and we run them at your target speed, delivering the video with accuracy readout within 48 hours of arrival. The quote is based on that exact configuration: jig, sensor and speed. How the test-run works.
Semi-automatic standard machines ship 7–10 days after payment confirmation. Fully automatic standard machines take 15–35 working days (confirm at quotation). Custom jigs and rotary hot melt lines are scheduled per project after engineering review. We give you a date with the quote, not after it.
Yes, we build OEM and private-label machines for distributors and integrators, with photos, videos and spec sheets supplied under your brand. Jig drawings and sample parameters are archived so repeat orders are fast. Start via the contact page.
Tell us your container and industry. We send the price list, matching model spec sheets and test-run videos within one business day.