China labeling machine manufacturer, OEM/ODM, semi-automatic to high-speed rotary systems.

Wet Glue Labeling Machine Manufacturer. Cold Glue Labelers, OEM/ODM.

HiPaks builds labeling systems in Guangdong, China, and we are straight about scope: our production focus is pressure-sensitive and hot melt labeling, while wet glue machines are quoted per project. If your line still runs paper labels on a cold glue system.

Coldglue
Glue Type: water-based / paste
Paper
Label Material: body / shoulder / neck
Per project
Speed Range: confirmed per project
1unit
Standard MOQ

What We Build

Wet Glue Specifications & Purchase Terms

Wet glue builds are scoped per project, so machine-level parameters are confirmed after we see your bottle, label and target speed. The commercial terms below are standard across all HiPaks machines.

TermDetail
Lead TimeSemi-automatic machines: 7–10 days. Wet glue and other project-based systems: quoted per project.
Payment30% deposit on order. 70% balance paid before shipment, after the labeling-test video is approved.
IncotermsFOB Shenzhen by default. CIF / DDP / door-to-door available on request for qualified orders.

Wet Glue Labeling Explained, and Where HiPaks Fits

A wet glue labeling machine (also called a cold glue labeler) uses a rotating glue roller or glue pad to pick up water-based adhesive, transfer it onto a plain paper label, and press the label onto the container. Because the label itself carries no adhesive and no release liner, label stock costs.

  • Typical applications: beer bottles, returnable glass bottles, jars and cans with paper labels
  • Label material: plain paper labels (body, shoulder and neck labels for glass bottles)
  • Cost profile: lowest per-label cost at high volumes; the glue is applied by the machine, not pre-coated
  • Trade-off: glue preparation, roller cleaning and changeover take more operator attention than self-adhesive lines

Certifications & Compliance

All HiPaks machines are built to CE standards. Other certificates are confirmed per project; ask our team for the latest documentation.

Standard

CE Marking

Certification in progress, documents on request

System

ISO 9001

Certification in progress

Product

Machine Certificates

Confirmed per project in writing

Regional

US / EU / ME

Confirmed at inquiry

Factory Strength Behind Every Project

Whether your project ends up wet glue, hot melt or self-adhesive, it is built by the same factory, with the same test discipline on every machine that ships.

50+ Countries, 500+ Factories Served

HiPaks machines run in 500+ factories across 50+ countries, with strong presence in the US, EU, Middle East and Southeast Asia.

Engineer-Founded, 15 Years

Founded by an engineer with 15 years of labeling-machine industry experience. Your project is scoped by engineers, not resold by traders.

SICK & Panasonic Core Parts

SICK photoelectric sensors and Panasonic servo drives on the critical axes: proven reliability on 24/7 production lines.

Real Labeling-Test Videos

Every model has a real labeling-test video. Your machine is tested on your real containers before shipping. You approve the test video and sample first.

Manufacturer Questions

What is wet glue labeling, and how does it differ from self-adhesive labeling?
Wet glue labeling (also called cold glue labeling) uses a glue roller or glue pad to apply water-based adhesive onto a plain paper label, then presses the label onto the bottle or can. Unlike self-adhesive labels, wet glue labels have no release liner and no pre-applied adhesive: the machine applies the glue at the moment of labeling. It is a classic technology for breweries, beverage plants and other high-volume paper-label lines.
Wet glue vs self-adhesive labeling: which is cheaper per label?
Per label, wet glue usually costs less: plain paper labels without silicone release liner or pre-applied adhesive are cheaper to print, and the glue itself costs a fraction of pressure-sensitive adhesive. The trade-off is equipment and operation: wet glue lines need glue preparation, cleaning and more maintenance. For short runs and flexible SKUs, self-adhesive is often the lower total cost; for very long paper-label runs, wet glue wins on label cost.
Is wet glue labeling suitable for returnable glass beer bottles?
Yes. Returnable glass bottles are the classic wet glue application. Cold glue paper labels wash off cleanly in the caustic bath of a bottle-return washing line, so the bottle can be refilled and relabeled many times. That is why many breweries running refillable bottle pools stay on wet glue even when newer label technologies are available.
Does HiPaks build wet glue labeling machines?
We currently specialize in self-adhesive and hot melt labeling systems; wet glue models are available on request and confirmed per project. For beer, beverage and mineral water lines we usually recommend our hot melt rotary labelers (10,000–15,000 bph on OPP/BOPP labels) or our MT / T9 self-adhesive series, depending on your label material, bottle format and budget.
What are your payment terms and lead time?
30% deposit on order, 70% balance before shipment. Semi-automatic machines ship in 7–10 days; wet glue and other project-based systems are quoted with a per-project lead time. All machines ship FOB Shenzhen.
Can you supply spare parts and service for an existing wet glue machine?
Spare parts are quoted against the parts list of your model. For machines outside our current production focus we confirm availability in writing before you commit, and we name the support channel that will handle the machine after delivery.
When is it cheaper to replace wet glue with hot melt or self-adhesive?
It depends on label material, annual volume and how often the line changes SKUs. Hot melt and pressure-sensitive usually win when film labels and shorter runs dominate; wet glue still makes sense on high-volume paper labels. We run the comparison on your label cost and volume before recommending a replacement.
What are the payment, warranty and lead time terms?
Standard terms are 30% deposit and 70% before shipment, with a 50/50 split available on certain models and written into your quotation. Semi-automatic machines ship in 7–10 days, automatic lines in 7–25 days, custom builds 25 days. Every machine carries a one-year warranty plus lifetime technical support and an English manual with operation videos.
Back to top