The T9 series is our automatic label applicator range for inline production: round bottle, flat and top surface, bottom, single and double side. SICK photoelectric sensors and Panasonic servo drives deliver up to ±0.2mm accuracy, and every machine ships with conveyor integration, PLC signal wiring and commissioning support.
Three machine groups plus drop-in applicator modules cover every inline labeling position. Find your container below; each group links to the models that label it.
The core of any automatic bottle labeling machine line: wrap-around labeling for round containers, with orientation options when the label must land on a registered position.
Flat surfaces, cartons, pouches and jars — every horizontal labeling position, from single flat application to paging, sealing and two-sided top/bottom lines.
For flat bottles, square bottles and oval containers that carry side labels — and for lines that need side labeling plus bottle orientation in a single machine.
Unedited test-floor footage from our own plant — inline round bottle, flat carton labeling, double side and integrated orientation. Videos load only when you click.
Full sequence on PET bottles: feed screw separation, label pickup, wrap and press-on. One running configuration — speed and precision claims for your bottle are confirmed in the trial-labeling test, not here.
Fifteen inline configurations in four groups. Speed and lead time depend on your container, label and configuration — we state them per project after testing your samples, not as catalog headlines.
| Spec | Round · T921–T923 | Flat / Top / Bottom · T931–T936 | Side · T961–T963 | Modules · T95x |
|---|---|---|---|---|
| Models | T921 · T922 · T922R · T923 | T931 · T932 · T933 · T935 · T936 | T961 · T962 · T963 | T951 · T952 · T953 |
| Labeling function | Roll-on wrap-around; oriented; star-wheel oriented; horizontal for slim / unstable bottles | Flat; automatic paging; seal / tamper-evident corner; bottom; top & bottom in one pass | Single side; double side; integrated double side with oriented round bottle function | Drop-in labeling heads — inline flat, inline, gantry — for your own conveyor |
| Typical containers | Round PET and glass bottles | Cartons, pouches, bags & cards, jars, flat packs | Flat, square and oval bottles; round (T963 orientation) | Defined by your host line |
| Orientation option | T922 / T922R (star-wheel) | — | T963 (integrated) | Contact for spec |
| Accuracy | ±1mm standard across T9 inline models; up to ±0.2mm on high-precision configurations. Exact accuracy per model, container and label, verified in the pre-shipment test. | |||
| Labeling speed | 40–300 pcs/min depending on model, container and label — confirmed per configuration in the trial-labeling test on your samples. | |||
| Suitable label size | L6–300 × W10–175 mm depending on model; label roll core 76 mm, outer diameter ≤300 mm — checked against your label roll during the trial-labeling test; exact range confirmed with your quote. | |||
| Suitable bottle / product size | Model-dependent — e.g. T921 round bottles φ25–100 × H25–300 mm; T923 vials φ10–30 × H15–110 mm; T961/T962 containers L20–300 × W30–100 × H60–360 mm; T931 flat products up to L630 × W430 mm. Send your container dimensions; compatibility is verified in the trial-labeling test before quotation. | |||
| Changeover time | [TBC] — recipe-based changeover between formats; measured per configuration and stated in your quote. | |||
| Voltage / Power | 220V 50/60Hz, 500W–2400W depending on model; 110V/60Hz export version available on request — electrical spec confirmed with your quote per configuration and destination grid. | |||
| Line integration | Conveyor adapters, PLC signal wiring and commissioning support included — syncs with upstream and downstream equipment | Standard mounting interfaces and I/O documentation for integrators | ||
Quality is not an adjective; it is a parts list. These are the component brands written into every T9 specification sheet — ask for the BOM with your quote and check it line by line.
| No | Part | Brand / Origin |
|---|---|---|
| 1 | Product & label photoelectric sensors | SICK · Germany |
| 2 | PLC controller | Panasonic · Japan |
| 3 | Servo drive system | Panasonic · Japan |
| 4 | Power supply | Mean Well · Taiwan |
| 5 | Stepper motors (auxiliary axes) | Leadshine · China |
Every T9 quote starts from the standard scope below; the options column is where we shape the machine to your line. Pick from the menu — that is what the quotation conversation looks like.
Six industries where T9 inline labeling machines work today — and which group each one usually reaches for.
Wrap-around labeling for round PET and glass bottles with registered orientation where the label position matters.
Flat bottles and oval containers with front + back labels — T962 double side keeps both labels aligned in one pass.
Jars, cans and flat packs needing top, bottom or seal labeling for freshness indication and compliance.
High-end configurations at ±0.2mm for small round bottles where label placement is part of quality control.
Square and flat containers with two-sided labeling, including warning and instruction label pairs.
T95x applicator modules mount into your own conveyor and PLC architecture — a labeling station without building one.
Integration scope is written into every T9 quotation. This is what happens between your conveyor layout and a labeling station that runs in sync with the rest of your plant.
Container shape, label size, target speed and your existing line layout are enough to select the T9 configuration — and to say where the limits are.
The labeling station adapts to your existing layout: conveyor interfaces are part of the scope, so bottles enter and leave the station without re-handling.
Labeling triggers and speed follow your line’s PLC, so the station starts, stops and ramps with the equipment around it.
Commissioning support is included. Before shipping, your machine runs your containers at the quoted target — you approve the video, then it ships.
Integrators and OEMs mount T951 / T952 / T953 applicator modules into their own conveyors with standard mounting interfaces and I/O documentation. See Label Applicator Heads.
Precision, integration, speed, orientation and the pre-shipment test — the five things that decide an automatic labeling machine project.
Send your containers, labels and target output — we run the T9 configuration on your real product, you approve the test video, then the machine ships. FOB Shenzhen, 50+ countries served.
Get a Free Quote