China labeling machine manufacturer, OEM/ODM, semi-automatic to high-speed rotary systems.

Thanks. Your Inquiry Is With an Engineer.

It is in the engineering queue, not an unwatched mailbox. Here is exactly what happens next, and how to reach an engineer if your project is urgent.

From Your Message to a Quotation

Three steps, each with a deadline we hold ourselves to.

  1. An engineer reads itA project engineer, not an autoresponder, reviews your container, label and target speed, then replies with a machine family recommendation, configuration options and an initial price range.Within 24 hours
  2. A free test on your containersSend samples or drawings. We run your actual containers and labels on the matching machine and return the test video with measured accuracy, so the numbers are proven before any money moves.Within 48 hours of arrival
  3. A written quotationFull configuration and FOB Shenzhen pricing with a delivery window: 7–10 days for standard semi-automatic, 7–25 days for automatic builds.After the test run

In a Hurry? Skip the Queue

Send photos of your container and label straight to an engineer.

WhatsApp · +86 186 1602 0558

Fastest channel for urgent projects. Working days in China time (UTC+8), replies within one business day.

Email · sales@hipaks.com

Quote requests, drawings and label files welcome. Same one-business-day reply target, with attachments kept together.

While You Wait

Three resources most buyers open while their inquiry is being prepared.

Back to top