Self-Adhesive Labeling in Every Format: From First Machine to Full Line
Sticker labeling machines apply self-adhesive labels (pressure-sensitive labels on a release liner) onto round bottles, flat panels, boxes and pouches. It is the most flexible labeling technology: labels are easy to source, changeovers take minutes, and there is no glue system to maintain. HiPaks builds the complete self-adhesive range in-house.
Wrap-around, flat and front-back desktop units: the classic first labeling machine for small batches. Ships in 7–10 days.
T9 Series · InlineFully Automatic Sticker LabelersInline round bottle, flat surface and two-side systems that connect directly to your conveyor and production line.
- Every format covered: wrap-around round bottles, flat panels, front-and-back two-side, corner wrap
- SICK photoelectric sensors detect label gaps (including clear and small labels) for consistent placement
- Precision to ±0.2mm on selected models, versus an industry norm of ±0.5–1mm
- Technology boundary: need wash-off paper labels at high volume? See our wet glue guide. Running OPP/BOPP film at 10,000–15,000 bph? See the hot melt rotary labeler.


Sticker Labeling Specifications & Purchase Terms
Commercial terms below are standard across the self-adhesive range. Speed and label-size ranges depend on the exact model and your container. Send your bottle photos and we will quote the matching configuration.
Per-Model Parameters
Labeling speed range and label-size capacity vary by model [TBC]. Inline system lead time quoted per project [TBC].
Payment
30% deposit on order. 70% balance paid before shipment, after the labeling-test video is approved.
Incoterms
FOB Shenzhen by default. CIF / DDP / door-to-door available on request for qualified orders.

Tuned to Your Label Material and Your Bottle
Self-adhesive projects fail or succeed at the peel plate and the wipe mechanism. Our founder is an engineer with 15 years of labeling-machine experience, and every OEM/ODM build is adjusted around your exact label stock and container shape.
- Peel and wipe mechanisms adjusted for your label material: clear film, coated paper, foil or tamper-evident security labels
- Custom two-label and three-label stations (front, back and top seal) built as one machine
- Custom jigs and fixtures for tapered, square, oval or conical containers
- Line integration: conveyor adapters, PLC signal wiring and commissioning support for your existing line
Explore our OEM & ODM program →

Certifications & Compliance
All HiPaks machines are built to CE standards. Other certificates are confirmed per project; ask our team for the latest documentation.

A Factory That Tests Every Machine on Your Real Containers
Most suppliers show catalog photos. We film every model actually labeling real containers (including the hard scenarios like clear labels and small labels), and your machine is tested on your bottles before it ships.
50+ Countries, 500+ Factories
HiPaks sticker labeling machines run in 500+ factories across 50+ countries: cosmetics, food, beverage and household chemical brands among them.
Engineer-Founded, 15 Years
Founded by an engineer with 15 years of labeling-machine industry experience. Model selection and quoting are done by engineers, not resellers.
SICK & Panasonic Core Parts
SICK photoelectric sensors and Panasonic servo drives on the critical axes: the reason our machines hold ±0.2mm on a production floor.
Real Labeling-Test Videos
Every model has a real labeling-test video. Before shipping, your machine runs on your containers. You approve the video and a physical sample first.

Sticker & Self-Adhesive Labeling Questions
What is a sticker labeling machine?
Can your machines apply clear (transparent) labels?
Do you support front-and-back two-label application?
What is the MOQ, and how fast is delivery?
Sticker labeling vs wet glue labeling: which should I choose?
Send Your Bottle & Label Photos: Get a Model Match in 12 Hours
Send your container photos, label size and target speed. Our engineers reply within 12 hours with a model recommendation, pricing and a free labeling-test plan on your real containers.

Compare all models in the HiPaks product catalog: every model with photos, specs and a real labeling-test video.