The Full T9xx Inline Automatic Series
Our automatic range covers every inline labeling scenario: T921 wrap-around for round bottles, T923 horizontal for vials and unstable small bottles, T931 flat labeling and T932 flat-with-paging for sheets, pouches and cartons, T961 single-side, T962 two-side, and T963 two-side with round-bottle orientation. Every machine feeds from its own conveyor and synchronizes with your line. Full model list in the product catalog.
Spec Sheet You Can Build a Line Around
Accuracy on our high-end automatic models reaches ±0.2mm; the industry norm is ±0.5–1mm. Labeling speed depends on model, container size and label format, so we confirm exact numbers against your samples at the quote stage instead of printing generic figures.
Delivery
Semi-automatic desktop: 7–10 days. Fully automatic inline systems: lead time confirmed at the quote stage based on configuration.
Payment
30% deposit on order. 70% balance paid before shipment, after your machine test video is approved.
Incoterms
FOB Shenzhen by default. CIF / DDP / door-to-door available on request.
Customized to Your Line Takt
An automatic labeler is only as good as its fit with your line. Our engineering team (led by a founder with 15 years in labeling machines) designs the integration around your takt, containers and control system.
- Conveyors and bottle separators tuned to your line takt and container sizes
- T95x applicator modules that drop into your existing automatic line
- Special labeling stations: corner wrap, oriented round bottle, top and bottom
- PLC signal wiring and I/O synchronization with upstream and downstream equipment
- Private-label builds for distributors and system integrators
Explore our OEM & ODM program →
Certifications & Compliance
We publish only what is verified. All HiPaks automatic labeling machines are built to CE standards; additional certificates are in progress. Critical electrical components come from SICK and Panasonic.
Commissioned on Video Before It Ships
Automatic lines fail or succeed at commissioning. We run your machine on your containers, film it, and support you remotely for the life of the equipment. See delivered lines →
50+ Countries, 500+ Factories
Automatic labeling systems delivered to 500+ factories across 50+ countries: food, beverage, cosmetic, pharmaceutical and chemical lines.
Engineer-Founded
Founded by an engineer with 15 years of labeling-machine experience. Line-integration questions go straight to engineering.
SICK & Panasonic Core
SICK photoelectric sensors and Panasonic servo drives on critical axes: stable registration on 24/7 automatic lines.
Line Commissioning Video
Every automatic machine is run with your containers before shipping. You get the commissioning video, plus remote support via WhatsApp after delivery.
Common Questions from Automatic Line Buyers
What is the difference between semi-automatic and automatic labeling machines?
Can your automatic labeler connect to our PLC line?
What speed can I expect for round bottles?
Do you provide installation and training?
What is the lead time for an automatic labeling machine?
Send Your Line Layout. Get an Integration Proposal.
Send your line layout, container sample and target speed. Our engineering team replies within 12 hours with a model recommendation, pricing and a line-integration proposal.