T-180 / T-190 · Shipping label applicators
Dedicated carrier-label application for e-commerce lines: stack-label and roll-label variants in the same class family.
Print date, batch or barcode the instant before application: flat-surface or side-of-line, one platform.

Part of the print & apply machine range · live proof in the test-run video library
Three parts define the platform: the print engine module and its media path, the applicator presenting the freshly printed label, and the trigger sensor timing the sequence to product presence. Two of the three are photographed below; the engine-module close-up follows our first production unit, because we do not stand in another machine’s photos. Component logic and part names are in the parts diagram guide.


The FT-600 is built for lines where the marking changes too often to pre-print: e-commerce and 3PL parcels and cartons, food and cosmetic boxes needing per-batch dating, chemical containers with lot and barcode requirements. It complements the shipping-label applicators for carrier compliance in e-commerce & logistics, and sits in the wider print & apply class overview on the print & apply machine page.
Honest boundary: print & apply is a system purchase: print engine, media, data source and applicator must be specified together. That is why several FT-600 fields read “confirmed at engineering evaluation” rather than displaying guessed numbers: the datasheet does not publish them, and we will not invent them.
| Specification | FT-600 (ALB-6000) |
|---|---|
| Function | Online print & apply: variable data printed and applied in real time |
| Data | Date / batch / barcode / variable data at the moment of application |
| Configurations | Flat-surface application · side-of-line application (two forms) |
| Placement accuracy | Specs available on request, confirmed at engineering evaluation |
| Rated speed | Specs available on request, line-synced, confirmed per project |
| Suitable products | Cartons, pouches, parcels and flat/side surfaces on moving lines |
| Print engine | Thermal platform: engine brands and interfaces matched at engineering evaluation |
| Trigger sources | Product-present sensor; weigher/scanner trigger per project |
| Power | Specs available on request, confirmed with configuration |
| Dimensions / weight | Specs available on request |
| Warranty & support | 1-year machine warranty + lifetime technical support · English manual & operation videos included |
Source: factory datasheet (new numbering FT-600; legacy reference ALB-6000). Fields shown “on request” are not published in the datasheet; they are confirmed against your product and data system at engineering evaluation, never guessed.
FT-600 projects are quoted as systems: print engine selection and interface to your WMS/ERP or weigher/scanner data; media (label stock and ribbon) specification; flat vs side applicator configuration; conveyor mounting, height and angle; barcode-grade verification where compliance demands it. Unusual surfaces or custom presentation fixtures route through the custom labeling machine page; head-only integrations compare on the label applicator & heads page.
Print & apply is proven only end to end: your cartons or pouches, your label stock, your data stream, printed and applied at line speed and filmed; the acceptance record ships with the machine. The ten-point checklist is on the FAT & quality page.
From $6,000, indicative. Print & apply pricing is configuration-driven: the print engine spec, applicator form and data integration each move the number, which is why published P&A prices across the industry are rare and quotes are the norm. Bands and context in the price center; standard payment 30/70 T/T, import terms in the import playbook.
Anything a thermal print engine outputs at the moment of application: date and time stamps, batch and lot codes, barcodes and variable serialized data. The data source is wired in at integration (product-present triggers as standard, with weigher or scanner sources per project), so the code on the label always matches the product under it.
Print engine brand and interface are matched to your data system during engineering evaluation. Declare your WMS/ERP and preferred engine at inquiry so the integration is quoted correctly the first time.
Flat application suits the top faces of cartons, cases and pouches; side application suits flanks presented to the head as products pass on the conveyor. Both are configurations of the same FT-600 platform; send a photo or video of your line and the application point, and we specify the form at quotation.
From $6,000, indicative, with the print engine specification, applicator form and data integration driving the final figure. Send your product, media and data requirements for a firm system quote with the test video included.
The FT-600 configured to the quoted specification, test-run with your product and data and filmed; the FAT video; English manual and operation videos; the spare parts kit, with contents enumerated on the packing list; and lifetime technical support contacts. See the crate checklist on the FAT page.
Dedicated carrier-label application for e-commerce lines: stack-label and roll-label variants in the same class family.
Pre-printed labels at 40–120 pcs/min on an existing conveyor; the choice when data is fixed and the label is pre-printed.
Automatic labeling for cards, bags and flat items: the pressure-sensitive workhorse behind print & apply for batch-run products.
Adding variable-data labeling to a running conveyor is a measurement-and-mounting job, not a new line. Five-step playbook inside.