MT-802 · Flat suction, wider window
±0.5mm suction platform for bigger flat pieces (L 200 × H 120mm) and larger labels: the general-purpose sibling.
The range’s most accurate labeler: three-cylinder suction placing flat-surface labels to up to ±0.2mm.
Part of the semi-automatic labeling machine range · live proof in the test-run video library
Two details tell the story in photographs: the three-cylinder suction head with balanced pressing force, and the alignment stage that squares the product to the applicator. The compact 550×440×870mm benchtop frame is visible in the hero shot above. Names and failure modes for everything visible are in the parts diagram guide.


The MT-807 earns its keep wherever a small label must sit precisely on a flat surface: premium cosmetic cartons and compacts, pharmaceutical folding-carton panels, laboratory boxes, electronics packaging, cannabis containers, branded seals on lids. Placement error is visible or non-compliant at a glance. Industry fit: cosmetics & personal care and pharmaceutical & lab.
Honest boundaries: it is a flat-surface platform, not a wrap machine. Round bottles belong to the MT-801, and full-wrap square bottles to the MT-805 (range overview on the semi-automatic page). Products taller than 85mm or labels wider than 100mm need the wider-window platforms.

| Specification | MT-807 (XL-T807) |
|---|---|
| Placement accuracy | Up to ±0.2mm |
| Rated speed | 20–30 pcs/min |
| Suitable products | Flat surfaces (boxes, cartons, pouches, lids, cards, small parts) |
| Product range (mm) | L 10–300 × W 20–300 × H 5–85 |
| Label size L × W (mm) | L 10–50 × W 5–100 |
| Machine dimensions (mm) | 550 × 440 × 870 |
| Power | 220V, 300W (50/60Hz) |
| Weight | ≈45 kg |
| Label roll requirement | Core 76mm · OD ≤300mm (some models 240/260mm) · pressure-sensitive roll stock |
| Warranty & support | 1-year machine warranty + lifetime technical support · English manual & operation videos included |
Source: factory datasheet (new numbering MT-807; legacy reference XL-T807). Control configuration is confirmed at quotation against your product and label.
Custom holding fixtures for small or irregular flat parts are the most common MT-807 option: jigs that present each piece square to the suction head so the up to ±0.2mm placement is repeatable across shapes; drawings archived, repeat orders not re-charged, quoted via the custom labeling machine page. Also quoted per destination: voltage variants for your market, transparent-label sensor configuration, and date-coding integration.
Every MT-807 is test-run with your actual items and labels before shipment, filmed, with the up to ±0.2mm placement verified at your working pace; the video ships with the machine as acceptance record and training asset. The ten-point FAT checklist and crate contents are on the FAT & quality page.
From $2,000, indicative. The quote moves with fixture requirements, label sensor configuration (standard vs transparent-label sensing) and voltage variant; the semi-automatic class spans $600 to $4,500 with the MT-807 family at its precision end (price center). Standard payment 30/70 T/T. Import sequence in the import playbook.
Flat surfaces up to L 300 × W 300mm and 85mm tall (cartons, boxes, pouches, lids, cards and small flat parts), with labels from tiny (L 10 × W 5mm) up to L 50 × W 100mm. Round bottles and full-wrap square bottles belong to other platforms in the range; send your product and we confirm fit before quoting.
Placement stays within two-tenths of a millimeter of the set position, cycle after cycle: the tier required where placement is a compliance or luxury signal (pharma cartons, premium cosmetics). The figure is verified on your product in the factory test run at your working pace; the filmed result is the acceptance standard, not a datasheet promise.
From $2,000, indicative. Fixtures, sensor configuration and voltage variant move the number; send your product for a firm quote with the test video included. For context, the full semi-automatic range runs $600 to $4,500.
Yes, that is the standard process, not a favor. Send samples of your product and label stock; the factory runs them and films a free test-run video within 48 hours, including the placement measurements that back the precision claim on your exact items.
The MT-807, adjusted and test-run with your product; the FAT video; English manual and operation videos; the spare parts kit, with contents enumerated on the packing list; and lifetime technical support contacts. Dispatch is 7 to 10 days after payment confirmation for standard builds.
±0.5mm suction platform for bigger flat pieces (L 200 × H 120mm) and larger labels: the general-purpose sibling.
When the “flat surface” is a square bottle face that needs wrap-around coverage, the MT-805 takes over.
Same flat-surface mission at line speed: the upgrade path when an operator can no longer keep up at 20–30 pcs/min.
Curved, angled or tiny parts that will not sit square on their own: engineered jigs keep the precision repeatable.