China labeling machine manufacturer, OEM/ODM, semi-automatic to high-speed rotary systems.

T921 Automatic Round Bottle Labeling Machine

Wrap-around labeling for round bottles and jars φ25–100mm, ±1mm at up to 120 pcs/min.

T921 automatic round bottle labeling machine, full wrap-around platform, front view

Part of the automatic labeling machine range · live proof in the test-run video library

±1mm
Placement accuracy
40–120/min
Rated output (pcs/min)
φ25–100 × H25–300
Product range (mm)
L20–300 × W20–100
Label size (mm)
On request
Lead time: quoted per project

Photos & Details

Zoom into four details: the wrap-belt station at the application point, the dividing screw, the peel-edge sensor head and the per-SKU touch HMI. Component names and failure modes are in the labeling machine parts diagram.

T921 wrap belt application point with touch screen HMI at the station
The wrap-belt application point, with the touch HMI within reach of the operator.
T921 wrap-around result: full-circumference label seated on a round bottle
Wrap-around result on a round bottle: the full-circumference label seated at the application point.
T921 automatic round bottle labeling machine, side view
Stable steel frame on locking castors: footprint planned for inline mounting.

8 Features That Matter on the T921

  1. Wrap-around application. The wrap belt carries each bottle through a controlled arc so the label self-centers: the geometry that makes full coverage on round containers repeatable at speed.
  2. ±1mm placement accuracy. Rated accuracy for food, beverage and industrial lines, verified at your target rate with your bottle in the factory test run: accuracy at speed, not just on the datasheet.
  3. 40–120 pcs/min rated output. Covers everything from pilot lines to mid-volume production; the wide band absorbs the pace difference between SKUs without a speed change request.
  4. φ25–100mm container window, H 25–300mm. One machine spans slim sauce bottles through wide jars: fewer changeovers across a product family, and H up to 300mm covers tall bottles.
  5. Labels to L 300 × W 100mm. Long enough for full-wrap front-plus-ingredients designs on typical bottles; roll spec is the 76mm core industry standard.
  6. Single-phase 220V, 800W. AC220V 800W means most plants plug it in without electrical work (a genuine contrast with hot melt rotary lines that need three-phase 380V).
  7. Stable steel frame, ≈215kg, 2150×1130×1200mm. Mass matters at speed: vibration is the enemy of placement, and the footprint is planned for inline mounting between existing conveyors.
  8. Sensor-driven dispensing. Photoelectric label sensing with special sensing options for transparent labels. Declare clear-on-clear at inquiry and it is proven on your material in the test video.

What the T921 Labels Best

The T921 is the workhorse for round, stable containers in the φ25–100mm window: beverage and juice bottles, sauce and honey jars, cosmetic bottles, household chemicals. Best where volume has outgrown a semi-automatic station but is not yet a rotary project; range context on the automatic labeling machine page.

Hard case one: transparent labels can defeat a standard photoelectric sensor: sensor selection changes, and we prove it on your material in the test video. Hard case two: tapered or square containers. Wrap assumes round geometry, so those route to custom fixtures or the double-side class.

T921 automatic round bottle labeling machine, inline platform on the factory floor

Full Specifications

SpecificationT921 (XL-T821)
Placement accuracy±1mm
Rated speed40–120 pcs/min
Suitable productsRound bottles (wrap-around)
Product range (mm)φ25–100 × H 25–300
Label size L × W (mm)L 20–300 × W 20–100
Machine dimensions (mm)2150 × 1130 × 1200
PowerAC220V, 800W (50/60Hz)
Weight≈215 kg
Label roll requirementCore 76mm · OD ≤300mm (some models 240/260mm) · pressure-sensitive roll stock
Warranty & support1-year machine warranty + lifetime technical support · English manual & operation videos included

Source: factory datasheet (new numbering T921; legacy reference XL-T821). Fields marked “on request” are not published in the datasheet and are confirmed against your product at engineering evaluation.

Options & Custom Tooling

Common T921 project options: print-engine integration for date or batch coding at the application point; vision or reject handling for 100% verification; conveyor height and infeed adjustments to dock with your existing filler-capper line; voltage variants for your market, quoted per destination (110V 60Hz export configuration on request); and custom guide or fixture work where the product family is unusual. Engineered fixtures follow the same discipline as our shaped-container work (drawings archived, repeat orders not re-charged) via the custom labeling machine page.

Tested With YOUR Bottle Before Shipping

Before any T921 ships it is test-run with your actual bottles and labels at target speed: filmed, as both acceptance evidence and training asset. The ten-point checklist and crate contents are on the FAT & quality page; the balance-payment discipline is in the import playbook.

T921 Test-Run Footage

1test-run clip for the T921250clips in our library
T921 wrap-around test run on round bottlesFactory test · full wrap on a round bottle TEST RUN

Factory-Direct Price

From $6,500, indicative. The quote moves with three factors: label size and roll spec (bigger webs cost more), speed target within the 40–120 band, and options such as print integration or custom tooling. Full machine bands and comparison context sit in the price center; payment and shipping terms are standard 30/70 T/T with the import sequence in the buy-from-China playbook.

Common Questions About the T921

What products and sizes does the T921 handle?

Round bottles and jars in a φ25–100mm diameter window, up to 300mm tall, covering slim sauce bottles, beverage bottles, honey jars and typical cosmetic containers. Anything outside the window (smaller than φ25mm, or tapered/square) gets an engineering review and usually a different platform or a fixture; send the bottle and we confirm fit before quoting.

What accuracy and speed can I expect?

Rated: ±1mm placement at 40–120 pcs/min. The honest qualifier is that accuracy is a function of speed and product: we verify the figure at your target rate with your bottle in the factory test run, and that filmed result, not the datasheet, is the acceptance standard.

How much does the T921 cost?

From $6,500, indicative. The firm quote depends on label size, speed target and options; the automatic class spans roughly $6,000 to $15,000 across configurations. Send your bottles through contact & quote for a firm number with the test video included.

Can I test it with my own bottles before buying?

Yes, and it is free. Send product and label samples; the factory runs them on the T921 at your target speed and films a test-run video within 48 hours. It is the same footage used for the FAT record when the machine is built, so what you approve is what you receive.

What’s included in the delivery?

The T921, assembled and test-run with your product; the FAT video; English operating manual and operation videos; the spare parts kit, with the enumerated list on the packing list; and lifetime technical support contacts. The full crate checklist is on the FAT page, and parts logistics in the parts guide.

Related Models

T923 · Horizontal small-bottle labeler

φ10–30mm vials and slim containers at 100–300 pcs/min: the step across when diameters shrink below the T921’s window.

T962 · Automatic double-side

Square and flat-sided containers, front and back in one pass, 60–120 pcs/min: the geometry sibling (~$9,000 class).

Rotary hot melt · 12-station

12,000–15,000 BPH OPP labeling: the upgrade path when one SKU family outgrows pressure-sensitive economics.

MT-805 · Semi-automatic wrap-around

The benchtop entry point for the same wrap-around job at 10–20 pcs/min: pilot lines, samples and low-volume SKUs.

Back to top