China labeling machine manufacturer, OEM/ODM, semi-automatic to high-speed rotary systems.

Label Applicator Heads: T951 and T953

Drop-in OEM labeling modules for your line: standard mounting interfaces, full I/O documentation, commissioning support, ±1mm.

±1mm
Rated placement
40–120
T951 pcs/min
50–200
T953 servo pcs/min
From $3,000
Head module

Where Integrators Use Our Heads

The module is the labeling station without the frame.

System integrators

Mount onto a customer conveyor and the line gains a labeling station without a second machine builder.

OEM machine builders

Build the head into your own filler, capper or packer; serial builds get integrator program pricing.

Line retrofits

Add labeling to a line that was never designed for it: height and angle adjust at install.

What ships in the box

Mounting interfaces, I/O documentation, SICK sensing, Panasonic PLC and commissioning support.

T951 Inline vs T953 Gantry

ItemT951 inline flatT953 gantry
FormatDrop-in module, inline with your conveyorDrop-in module on an overhead gantry frame
Typical useFlat surfaces, products 10–150mmTop planes and arc surfaces above existing conveyors
Speed40–120 pcs/min40–150 stepper / 50–200 servo
Label sizeL6–300 × liner 25–125mmL6–300 × liner 25–125mm
Accuracy±1.0mm excluding product and label tolerance±1.0mm, same basis
DriveStepper; servo on requestStepper or servo build
Dimensions / weight885×870×1535mm · ≈76kg1230×797×845mm · ≈66kg
VoltageAC220V 50/60Hz, other voltages confirmed per marketAC220V 50/60Hz, same basis
DeliveryAbout 10 days after deposit; integration quoted per projectAbout 10 days after deposit; integration quoted per project

76mm core, roll OD up to 280mm, confirmed against your roll before quotation. CE conformity assessment in progress; destination-market documents confirmed with your quote.

Core Components You Can Verify

No proprietary black boxes: the control chain is standard industrial hardware.

#PartBrand / origin
1Product and label photoelectric sensorsSICK · Germany
2PLC controllerPanasonic · Japan
3Drive system (traction)Leadshine stepper · China; servo optional on T953
4Power supplyMean Well · Taiwan
5Stepper motors (auxiliary axes)Leadshine · China

Included as standard

  • Standard mounting interfaces for customer-built machinery
  • Full I/O documentation for PLC signal wiring
  • SICK sensing and Panasonic PLC at the core
  • Commissioning support: timing, thresholds, speed matching
  • Pre-shipment test on your container and label, video supplied
  • 1-year warranty plus lifetime technical support

Options that turn a module into a program

  • Gantry frame configuration (T953) to span existing conveyors
  • Integrator program with volume pricing for serial builds
  • Wider liner formats, confirmed by engineering evaluation against your roll
  • Servo drive build where speed or precision demands it

From Mounting to Commissioning

  1. MountStandard interfaces bolt the head to your frame; height and angle adjust on site, absorbing small drawing deviations.
  2. WirePLC signal wiring per the supplied I/O documentation, including any line-stop or handshake you want.
  3. CommissionTiming, sensor thresholds and speed matching set against your conveyor, with support during the run-in.
  4. ProveTest on your exact container, label size and target speed; the video and a sample go out for approval before shipment.

Integrator Questions

Head or complete labeling machine?

A head is the labeling station without the frame: a drop-in module that mounts onto your own conveyor or machine. A complete machine includes conveyor, frame and controls; see the applicator machine range if you need that.

Can it integrate with our existing conveyor and PLC?

Yes. Both the T951 and T953 ship with standard mounting interfaces and full I/O documentation for PLC signal wiring, and commissioning support is included so the head runs as part of your line.

Do you offer volume pricing for system integrators?

Yes: system integrators and OEM machine builders can join the integrator program with volume pricing plans. Contact us with your expected annual quantity.

Do you test the applicator on our containers before shipping?

Every unit is tested on your exact container shape, label size and target speed before shipment. You receive the full test video and a sample for approval.

What accuracy can we expect?

The T951 and T953 are rated ±1mm placement. Across the wider portfolio precision spans from ±1mm on line equipment up to ±0.2mm on the MT-807 benchtop machine, depending on model, label format and application.

Back to top