High speed rotary labeling machines with hot melt glue for roll-fed BOPP/OPP film labels. 12 and 16-station configurations for beer, mineral water and beverage plants — built in our own factory with SICK sensors and Panasonic servo drives, tested on your bottles before shipping.
Hot melt rotary labeling is the standard format where large volumes of bottles need wrap-around film labels at low per-unit cost. HiPaks rotaries are delivered to plants in 50+ countries — 500+ factories served.
Wrap-around BOPP/OPP labels on beer bottles at production speed, with the continuous rotary motion bottling lines expect.
High-volume water bottles labeled in the 10,000–15,000 bph range on 12 or 16-station rotaries.
Soft drink and juice lines running roll-fed film labels with hot melt adhesive for consistent wrap-around results.
Unedited footage from our test floor: the rotary carousel, the gluing system and bottles moving continuously through the stations. Videos load only when you click them, so the page stays fast.
Bottles indexed through gluing, label wrapping and pressing stations in continuous rotation — the 10,000–15,000 bph platform in one configuration, not a universal speed claim.
Output is confirmed per bottle format and label size during quotation. Every machine is test-run on your containers before shipment.
| Item | Hot Melt Glue Rotary Labeling Machine |
|---|---|
| Machine type | Rotary labeling machine with hot melt glue system |
| Station configurations | 12 stations · 16 stations |
| Output | 12-station: 12,000–15,000 bottles per hour · 16-station: 10,000–12,000 bottles per hour |
| Label format | Roll-fed BOPP / OPP film labels, wrap-around |
| Adhesive | Hot melt glue |
| Containers | Beer, mineral water and beverage bottles |
| Core components | SICK photoelectric sensors, Panasonic servo drive |
| Labeling accuracy | ±0.2–±1 mm by configuration (HiPaks portfolio range; accuracy figures confirmed per project) |
| Suitable label size | L20–430 × W20–140 mm, roll-fed BOPP/OPP film; label roll max outer Ø600 mm, core 152 mm (12-station) — dimensions confirmed against your label reel before quotation |
| Suitable bottle size | Beer, mineral water and beverage bottles — round bottles φ40–80 mm (12-station); oval-bottle formats customized on the 16-station — verified on your bottles in the pre-shipment test |
| Changeover time | [TBC] — bottle format changeover quoted per configuration |
| Voltage / Power | Three-phase 380V/50Hz — 8,000W (12-station) / 5,000W (16-station) — confirmed with your quote per destination grid |
| Payment terms | 30% deposit + 70% balance before shipment, FOB Shenzhen |
| Certifications | [TBC] — certificate list confirmed with your quote |
| Delivery time | [TBC] — quoted per configuration |
A rotary platform is a long-life asset; the parts list below is what keeps it running. Ask for the full BOM with your quote and check it line by line.
| No | Part | Brand / Origin |
|---|---|---|
| 1 | Product & label photoelectric sensors | SICK · Germany |
| 2 | PLC controller | Panasonic · Japan |
| 3 | Servo drive system | Panasonic · Japan |
| 4 | Power supply | Mean Well · Taiwan |
| 5 | Hot melt glue system | [TBC] — brand and model confirmed per configuration with your quote |
The standard scope below is the backbone of every rotary quote; the options column scales the platform to your line’s output and uptime targets.
One rotary platform, two station counts, the same hot melt glue system and roll-fed BOPP/OPP handling. The right configuration depends on your bottle format and target output — here is how the two differ.
Continuous rotation — bottles are indexed onto station platforms without stopping the line, which is what makes up to 15,000 bph possible.
The gluing station applies hot melt adhesive for the wrap-around film label — the format that keeps per-unit label cost low at beverage volumes.
Roll-fed film labels are cut and wrapped onto each bottle in rotation, synchronized by SICK photoelectric sensing.
Pressing stations secure the label seam before the bottle exits — then the Panasonic servo-driven carousel hands it off to your downstream line.
12 labeling stations in continuous rotary operation — the entry configuration for beverage lines that need high-speed roll-fed labeling, running 12,000–15,000 bottles per hour.
Four more bottle platforms on the same rotary platform — running 10,000–12,000 bottles per hour on oval-bottle formats. Same hot melt glue system, same roll-fed BOPP/OPP handling, higher sustained throughput.
The five questions beverage plants ask before ordering a rotary hot melt labeling machine. Each answer starts with the answer.
Tested with YOUR bottles before shipping: send your bottle format and target output, and we confirm 12 or 16 stations with a real test run on your containers.
Get a Free Quote