Model:
T801
Semi-Automatic Round Bottle Labeling Machine
Professional labeling solutions for enhanced production efficiency
Learn More
Product Images
Main Applications
Suitable for all kinds of cylindrical objects labeling, small taper round bottle labeling, such as xylitol, cosmetics round bottles, wine bottles, etc. Can achieve wrap around labeling, front and back labeling, label's distance can be adjusted. Widely used in food, cosmetics, chemical industry, vintage, medicine and other industries.
Key Features
This advanced labeling machine offers precision, reliability, and efficiency for various industrial applications.
Technical Specifications
| Parameter | Specification |
|---|---|
| Labeling Accuracy | ±0.5mm |
| Labeling Speed | 15~30pcs/min |
| Bottle Diameter Range | 10mm~150mm |
| Bottle Height Range | N/A |
| Power Requirements | 220V/50HZ&110V/60HZ |
| Machine Dimensions | 913×495×502mm |
| Machine Weight | 34kg |
| Air Pressure Requirements | N/A |
Product Features
Wrap Around Labeling
Complete circumferential labeling capability with adjustable coverage
Front and Back Labeling
Flexible front and back label positioning with adjustable spacing
Optional Positioning Detection
Optional circumferential positioning detection for specified location labeling
Coding Integration
Optional ribbon coding machine and hot stamp printer for production information
Optional Accessories
Accessory Name
Function Description
Ribbon Coding Machine
For printing production date, batch number, and expiry information
Hot Stamp Printer
For simultaneous labeling and printing operations
Technical Documentation
Product Series
Bottle Labelers
Professional bottle labeling machines for round bottles, flat bottles, and specialty containers across beverage, pharmaceutical, cosmetic, and industrial applications
Learn More
Automation Level:
Fully Automatic