Model:
T802
Semi-Automatic Plane Labeling Machine
Professional labeling solutions for enhanced production efficiency
Learn MoreMain Applications
Apply the method of sucking to label, to achieve labeling on all kinds of workpieces plane surface, such as cosmetic flat bottle, packaging box, plastic cover labeling, etc. Modifying the labeling head, can be used for labeling on uneven surface, such as concave plane, circular arc surface labeling, etc.
Key Features
This advanced labeling machine offers precision, reliability, and efficiency for various industrial applications.
Technical Specifications
| Parameter | Specification |
|---|---|
| Labeling Accuracy | ±0.5mm |
| Labeling Speed | 15~30pcs/min |
| Bottle Diameter Range | N/A |
| Bottle Height Range | N/A |
| Power Requirements | 220V/50HZ&110V/60HZ |
| Machine Dimensions | 840×440×840mm |
| Machine Weight | 48kg |
| Air Pressure Requirements | N/A |
Product Features
Suction Labeling Method
Vacuum suction method for precise flat surface label application
Uneven Surface Capability
Modified labeling head for concave plane and circular arc surface labeling
Custom Mold Support
Custom molds designed for various irregular workpiece configurations
Coding Integration
Optional ribbon coding machine and hot stamp printer integration
Optional Accessories
Accessory Name
Function Description
Custom Molds
Specialized molds customized for various irregular workpieces labeling
Coding System Interface
Interface connection for ribbon coding or hot stamp printing systems
Technical Documentation
Product Series
Box & Carton Labelers
Specialized labeling equipment for boxes, cartons, and packaging materials with superior handling capabilities for e-commerce, retail, and industrial packaging
Learn More
Automation Level:
Fully Automatic