Model:
T807
Semi-Automatic High-Precision Labeling Machine
Professional labeling solutions for enhanced production efficiency
Learn More
Product Images
Main Applications
Suitable for labeling on the top plane, arc surface and concave surface of products, labeling accuracy is up to ±0.2mm, mainly used for precision labeling of electronic and digital products, such as SD card, mobile phone battery, FPC, mobile phone charger labeling, etc.
Key Features
This advanced labeling machine offers precision, reliability, and efficiency for various industrial applications.
Technical Specifications
| Parameter | Specification |
|---|---|
| Labeling Accuracy | ±0.2mm |
| Labeling Speed | 15~20pcs/min |
| Bottle Diameter Range | N/A |
| Bottle Height Range | 5~85mm |
| Power Requirements | 220V/50HZ&110V/60HZ |
| Machine Dimensions | 575×427×815mm |
| Machine Weight | 45kg |
| Air Pressure Requirements | N/A |
Product Features
Ultra-High Precision
Industry-leading ±0.2mm labeling accuracy for critical electronic applications
Electronic Specialization
Specialized for electronic components requiring extreme precision and quality
Compact Design
Compact footprint suitable for clean room and laboratory environments
Advanced Control System
Advanced control system with micro-positioning capabilities for high-precision work
Optional Accessories
Accessory Name
Function Description
Precision Measurement Tools
Precision gauges and measurement tools for accuracy verification and quality control
Anti-Static Equipment
Anti-static equipment for safe handling of sensitive electronic components
Technical Documentation
Product Series
Box & Carton Labelers
Specialized labeling equipment for boxes, cartons, and packaging materials with superior handling capabilities for e-commerce, retail, and industrial packaging
Learn More
Automation Level:
Fully Automatic