Model:
T803
Semi-Automatic Front and Back Rolling Labeling Machine
Professional labeling solutions for enhanced production efficiency
Learn More
Product Images
Main Applications
Suitable for labeling on the top plane, arc surface and concave surface of products, labeling accuracy is up to ±0.5mm, mainly used for precision labeling of electronic and digital products, such as toys, SD card, mobile phone battery, FPC, mobile phone charger labeling, etc.
Key Features
This advanced labeling machine offers precision, reliability, and efficiency for various industrial applications.
Technical Specifications
| Parameter | Specification |
|---|---|
| Labeling Accuracy | ±0.5mm |
| Labeling Speed | 15~30pcs/min |
| Bottle Diameter Range | N/A |
| Bottle Height Range | N/A |
| Power Requirements | 220V/50HZ&110V/60HZ |
| Machine Dimensions | 995×432×966mm |
| Machine Weight | 58kg |
| Air Pressure Requirements | 0.4~0.6Mpa |
Product Features
High Precision Labeling
Ultra-precise ±0.5mm accuracy for high-quality electronic product labeling
Electronic Components Focus
Specialized design for electronic components and digital products
Arc Surface Capability
Capable of labeling on curved, concave, and irregular surfaces
Pneumatic Operation
Pneumatic system operation for consistent pressure and precision
Optional Accessories
Accessory Name
Function Description
Air Compressor Connection
Pneumatic system connection for stable air pressure supply (0.4-0.6Mpa)
Precision Fixtures
Custom precision fixtures for secure positioning of small electronic components
Technical Documentation
Product Series
Box & Carton Labelers
Specialized labeling equipment for boxes, cartons, and packaging materials with superior handling capabilities for e-commerce, retail, and industrial packaging
Learn More
Automation Level:
Fully Automatic