Model:
T806
Semi-Automatic Double Sides Labeling Machine
Professional labeling solutions for enhanced production efficiency
Learn More
Product Images
Main Applications
Apply rolling labeling method, to achieve on the side of various workpieces labeling, such as cosmetic flat bottles, packaging boxes, plastic side labeling etc. Modifying the labeling head, can be used for labeling on uneven surface, such as concave plane, circular surface labeling etc.
Key Features
This advanced labeling machine offers precision, reliability, and efficiency for various industrial applications.
Technical Specifications
| Parameter | Specification |
|---|---|
| Labeling Accuracy | ±0.5mm |
| Labeling Speed | 15~30pcs/min |
| Bottle Diameter Range | N/A |
| Bottle Height Range | 50~400mm |
| Power Requirements | 220V/50HZ&110V/60HZ |
| Machine Dimensions | 1328×1049×1516mm |
| Machine Weight | 270kg |
| Air Pressure Requirements | N/A |
Product Features
Double Side Capability
Simultaneous or sequential double-sided labeling capability for maximum efficiency
Large Product Handling
Accommodates large packaging boxes and oversized containers up to 400mm height
Rolling Method Application
Rolling labeling method ensures bubble-free application on various surfaces
Heavy-Duty Construction
Industrial-grade construction for handling heavy and large products up to 270kg machine weight
Optional Accessories
Accessory Name
Function Description
Large Product Fixtures
Custom fixtures designed for secure positioning of large products and packaging
Dual Label Systems
Independent labeling systems for each side with coding machine integration
Technical Documentation
Product Series
Bottle Labelers
Professional bottle labeling machines for round bottles, flat bottles, and specialty containers across beverage, pharmaceutical, cosmetic, and industrial applications
Learn More
Automation Level:
Fully Automatic