Model:
T805
Semi-Automatic 360° Wrap Around Labeling Machine
Professional labeling solutions for enhanced production efficiency
Learn More
Product Images
Main Applications
Apply 360° rolling labeling method, to achieve on the plane of various workpieces labeling. Such as cosmetics flat bottles, square bottles, hexagonal bottles, prismatic bottles labeling etc. Application examples: prismatic bottle labeling, hexagonal bottle labeling, irregular bottles, plastic shell labeling.
Key Features
This advanced labeling machine offers precision, reliability, and efficiency for various industrial applications.
Technical Specifications
| Parameter | Specification |
|---|---|
| Labeling Accuracy | ±0.5mm |
| Labeling Speed | 15~30pcs/min |
| Bottle Diameter Range | N/A |
| Bottle Height Range | N/A |
| Power Requirements | 220V/50HZ&110V/60HZ |
| Machine Dimensions | 843×759×895mm |
| Machine Weight | 57kg |
| Air Pressure Requirements | N/A |
Product Features
360° Rolling Method
Complete 360-degree rolling labeling capability for comprehensive coverage
Multi-Shape Compatibility
Compatible with flat, square, hexagonal, and prismatic bottle shapes
Irregular Surface Handling
Modified labeling head accommodates prism surfaces and arc geometries
Coding Integration Ready
Ready for integration with coding systems for production information printing
Optional Accessories
Accessory Name
Function Description
Shape-Specific Guides
Adjustable guides and fixtures for different bottle geometries and irregular shapes
Coding Machine Interface
Interface connection for ribbon coding or hot stamp printing systems
Technical Documentation
Product Series
Bottle Labelers
Professional bottle labeling machines for round bottles, flat bottles, and specialty containers across beverage, pharmaceutical, cosmetic, and industrial applications
Learn More
Automation Level:
Fully Automatic