Model:
T965
Online Printing Labeling Machine (Cache Printing)
Professional labeling solutions for enhanced production efficiency
Learn MoreMain Applications
Suitable for barcode labeling of all kinds of plane products, can print barcode and labeling at the same time, matching packaging production line, can be customized according to customer requirements.
Key Features
This advanced labeling machine offers precision, reliability, and efficiency for various industrial applications.
Technical Specifications
| Parameter | Specification |
|---|---|
| Labeling Accuracy | ±1.0mm |
| Labeling Speed | 15~30pcs/min |
| Bottle Diameter Range | N/A |
| Bottle Height Range | N/A |
| Power Requirements | 220V/50HZ&110V/60HZ |
| Machine Dimensions | 2825×1055×1480mm |
| Machine Weight | N/A |
| Air Pressure Requirements | N/A |
Product Features
Real-Time Printing
Real-time printing capability allowing simultaneous barcode printing and label application
Barcode Integration
Integrated barcode printing system for product tracking and inventory management
Production Line Matching
Designed for seamless integration with packaging production lines for continuous operation
Custom Configuration
Fully customizable configuration to meet specific customer requirements and production needs
Optional Accessories
Accessory Name
Function Description
Barcode Printing System
Advanced barcode printing system with real-time data integration capability
Production Line Interface
Specialized interface for matching with various packaging production line configurations
Technical Documentation
Product Series
Print and Apply Labelers
Real-time printing and labeling systems for variable data, barcodes, and on-demand label production with enterprise integration capabilities
Learn More
Automation Level:
Smart Automatic