Model:
T821
Full Automatic Wrap Around Round Bottle Labeling Machine
Professional labeling solutions for enhanced production efficiency
Learn More
Product Images
Main Applications
Suitable for beverage, pharmaceutical, food and daily chemical industries etc round bottle labeling, can achieve wrap around labeling. Can be directly connected to the front production line, automatic feeding bottle into the labeling machine to increase efficiency.
Key Features
This advanced labeling machine offers precision, reliability, and efficiency for various industrial applications.
Technical Specifications
| Parameter | Specification |
|---|---|
| Labeling Accuracy | ±1.0mm |
| Labeling Speed | 40~120pcs/min |
| Bottle Diameter Range | φ20~φ80mm |
| Bottle Height Range | N/A |
| Power Requirements | 220V/50HZ&110V/60HZ |
| Machine Dimensions | 2130×1150×1260mm |
| Machine Weight | 213kg |
| Air Pressure Requirements | N/A |
Product Features
High-Speed Operation
High-speed processing capability from 40 to 120 bottles per minute for maximum productivity
Production Line Integration
Seamless integration with existing production line systems for continuous operation
Automatic Feeding Compatible
Compatible with automatic feeding unscrambler for hands-free continuous production
Wrap Around Technology
Advanced wrap around labeling technology for complete circumferential coverage
Optional Accessories
Accessory Name
Function Description
Automatic Feeding Unscrambler
Optional automatic bottle feeding unscrambler system for continuous high-speed production
Ribbon Coding System
Integrated ribbon coding and hot stamp printing system for production dates and batch numbers
Technical Documentation
Product Series
Bottle Labelers
Professional bottle labeling machines for round bottles, flat bottles, and specialty containers across beverage, pharmaceutical, cosmetic, and industrial applications
Learn More
Automation Level:
Fully Automatic