Model:
T822
Full Automatic Vertical Positioning Round Bottle Labeling Machine
Professional labeling solutions for enhanced production efficiency
Learn More
Product Images
Main Applications
Suitable for surface of the round bottle labeling, can do single label and double labels, also the labeling position can be adjusted easily between front and back labels, widely used in cosmetics, food, medicine, disinfectant and other industries.
Key Features
This advanced labeling machine offers precision, reliability, and efficiency for various industrial applications.
Technical Specifications
| Parameter | Specification |
|---|---|
| Labeling Accuracy | ±1.0mm |
| Labeling Speed | 25~45pcs/min |
| Bottle Diameter Range | φ20~φ100mm |
| Bottle Height Range | 25~300mm |
| Power Requirements | 220V/50HZ&110V/60HZ |
| Machine Dimensions | 2230×1085×1405mm |
| Machine Weight | 222kg |
| Air Pressure Requirements | 0.4~0.6Mpa |
Product Features
Vertical Positioning System
Precise vertical positioning system for consistent and accurate label placement
Single/Double Label Capability
Flexible single or double label application with easily adjustable front and back spacing
Servo Drive Control
Advanced servo motor drive system (570W) for accurate bottle positioning and timing control
Pneumatic Operation
Pneumatic system (0.4-0.6Mpa) ensures stable and reliable operation throughout production
Optional Accessories
Accessory Name
Function Description
Positioning Detection System
Optional circumferential positioning detection system for specified location labeling accuracy
Servo Control Panel
Advanced servo control system with programmable settings and memory functions
Technical Documentation
Product Series
Bottle Labelers
Professional bottle labeling machines for round bottles, flat bottles, and specialty containers across beverage, pharmaceutical, cosmetic, and industrial applications
Learn More
Automation Level:
Fully Automatic