Model:
T852
Full Automatic Side Production Line Labeling Head
Professional labeling solutions for enhanced production efficiency
Learn More
Product Images
Main Applications
Can be matched to the assembly line, labeling on products of side when products pass, can achieve online labeling, such as matching to inkjet machine conveyor belt, for passing products to achieve labeling.
Key Features
This advanced labeling machine offers precision, reliability, and efficiency for various industrial applications.
Technical Specifications
| Parameter | Specification |
|---|---|
| Labeling Accuracy | ±1.0mm |
| Labeling Speed | Step: 40~150pcs/min, Servo: 50~200pcs/min |
| Bottle Diameter Range | N/A |
| Bottle Height Range | N/A |
| Power Requirements | 220V/50HZ&110V/60HZ |
| Machine Dimensions | 795×645×1265mm |
| Machine Weight | 70kg |
| Air Pressure Requirements | N/A |
Product Features
Side Labeling Specialization
Specialized side labeling capability for products passing through production lines
Dual Speed Options
Dual operation modes: Step motor (40-150pcs/min) and Servo motor (50-200pcs/min) options
Conveyor Integration
Direct integration capability with inkjet machine conveyor belt systems for enhanced functionality
Compact Design
Compact design (70kg) suitable for integration into existing production line layouts without major modifications
Optional Accessories
Accessory Name
Function Description
Step/Servo Motor Options
Choice between step motor and servo motor drive systems based on production requirements
Conveyor Belt Interface
Direct interface capability with conveyor belt systems and inkjet printing equipment
Technical Documentation
Product Series
Label Applicator Heads
Modular labeling heads for production line integration and custom automation solutions designed for OEMs and system integrators
Learn More
Automation Level:
Fully Automatic