Model:
T833
Full Automatic Sealing Corner Labeling Machine
Professional labeling solutions for enhanced production efficiency
Learn More
Product Images
Main Applications
Used for labeling on the corner of the box, corner labeling on box upper plane and side. The purpose is preventing disassembly, mainly apply for poker, electronic products packaging box preventing disassembly labeling.
Key Features
This advanced labeling machine offers precision, reliability, and efficiency for various industrial applications.
Technical Specifications
| Parameter | Specification |
|---|---|
| Labeling Accuracy | ±1.0mm |
| Labeling Speed | 30~60pcs/min |
| Bottle Diameter Range | N/A |
| Bottle Height Range | 10~100mm |
| Power Requirements | 220V/50HZ&110V/60HZ |
| Machine Dimensions | 1975×1295×1240mm |
| Machine Weight | 180kg |
| Air Pressure Requirements | N/A |
Product Features
Corner Sealing Technology
Specialized corner labeling technology for tamper-evident sealing applications
Anti-Tampering Function
Anti-disassembly security feature for product protection and authenticity verification
Box Security Labeling
Designed specifically for poker cards and electronic product packaging security requirements
Specialized Application
Corner transition labeling capability from top plane to side plane for complete seal coverage
Optional Accessories
Accessory Name
Function Description
Security Label System
Specialized security label dispensing system for tamper-evident applications
Tamper Detection
Complete tamper-evident labeling system with security features for product protection
Technical Documentation
Product Series
Box & Carton Labelers
Specialized labeling equipment for boxes, cartons, and packaging materials with superior handling capabilities for e-commerce, retail, and industrial packaging
Learn More
Automation Level:
Fully Automatic