Full Automatic Round Bottle & Flat Bottle All In One Machine
Professional labeling solutions for enhanced production efficiency
Learn More
Product Images
Main Applications
Key Features
This advanced labeling machine offers precision, reliability, and efficiency for various industrial applications.
Technical Specifications
| Parameter | Specification |
|---|---|
| Labeling Accuracy | ±1.0mm |
| Labeling Speed | 30~120pcs/min |
| Bottle Diameter Range | 20~120mm |
| Bottle Height Range | 60~280mm |
| Power Requirements | 220V/50HZ&110V/60HZ |
| Machine Dimensions | 3070×1410×1565mm |
| Machine Weight | 500kg |
| Air Pressure Requirements | N/A |
Product Features
All-In-One Design
Comprehensive all-in-one design capable of handling both round bottles and flat bottles in single machine configuration
Universal Compatibility
Universal compatibility with diameter range 20-120mm accommodating wide variety of bottle types and sizes
Maximum Efficiency
Maximum production efficiency with speed up to 120pcs/min for high-volume production requirements
Ultra-Heavy Construction
Ultra-heavy construction (500kg) representing the pinnacle of industrial labeling machine engineering for ultimate durability